From 3eb9ab48bf0ee95536ef18f11cb1296e7f98b658 Mon Sep 17 00:00:00 2001 From: colin Date: Sun, 31 Aug 2025 09:44:04 -0400 Subject: [PATCH] feat(report): add metadata/params/stats + URL normalization; docs: schema; chore: update TODO; test: fresh reports --- TODO.md | 8 +- internal/report/report.go | 81 +- main.go | 17 +- reports/REPORT_SCHEMA.md | 46 +- reports/engagewr.ca.json | 5724 ++++++++++++++++++++++++++++++++ reports/lilsgym.ca.json | 330 ++ reports/titan-training.ca.json | 107 +- 7 files changed, 6256 insertions(+), 57 deletions(-) create mode 100644 reports/engagewr.ca.json create mode 100644 reports/lilsgym.ca.json diff --git a/TODO.md b/TODO.md index 65e66c8..c1671d8 100644 --- a/TODO.md +++ b/TODO.md @@ -3,10 +3,10 @@ Prioritized from easiest/low-risk to more involved work. Check off as we ship. ### Quick wins (target v0.0.2) -- [ ] Add crawl metadata (startedAt, finishedAt, durationMs) -- [ ] Include run parameters in report (maxDepth, concurrency, timeout, userAgent, sameHostOnly) -- [ ] Status histogram (2xx/3xx/4xx/5xx totals) in summary -- [ ] Normalize and dedupe trailing `/.` URL variants in output +- [x] Add crawl metadata (startedAt, finishedAt, durationMs) +- [x] Include run parameters in report (maxDepth, concurrency, timeout, userAgent, sameHostOnly) +- [x] Status histogram (2xx/3xx/4xx/5xx totals) in summary +- [x] Normalize and dedupe trailing `/.` URL variants in output - [ ] Add compact `reportSummary` text block to JSON - [ ] Top external domains with counts - [ ] Broken links sample (first N) + per-domain broken counts diff --git a/internal/report/report.go b/internal/report/report.go index 8b0b32e..8349cda 100644 --- a/internal/report/report.go +++ b/internal/report/report.go @@ -18,31 +18,80 @@ type Report struct { LinkSources map[string][]string `json:"linkSources"` MissingInSitemap []string `json:"missingInSitemap,omitempty"` InSitemapNotCrawled []string `json:"inSitemapNotCrawled,omitempty"` + Metadata Metadata `json:"metadata"` + Params Params `json:"params"` + Stats Stats `json:"stats"` } -func Build(target string, crawled map[string]struct{}, sitemap map[string]struct{}, crawlErrs map[string]error, check linkcheck.Results, outlinks map[string]map[string]struct{}) Report { - crawledList := keys(crawled) - sitemapList := keys(sitemap) +type Metadata struct { + StartedAt string `json:"startedAt"` // RFC3339 + FinishedAt string `json:"finishedAt"` // RFC3339 + DurationMs int64 `json:"durationMs"` +} + +type Params struct { + MaxDepth int `json:"maxDepth"` + Concurrency int `json:"concurrency"` + TimeoutMs int64 `json:"timeoutMs"` + UserAgent string `json:"userAgent"` + SameHostOnly bool `json:"sameHostOnly"` +} + +type Stats struct { + OK int `json:"ok"` + Broken int `json:"broken"` + Status2xx int `json:"status2xx"` + Status3xx int `json:"status3xx"` + Status4xx int `json:"status4xx"` + Status5xx int `json:"status5xx"` + StatusOther int `json:"statusOther"` +} + +func Build(target string, crawled map[string]struct{}, sitemap map[string]struct{}, crawlErrs map[string]error, check linkcheck.Results, outlinks map[string]map[string]struct{}, meta Metadata, params Params) Report { + crawledList := sanitizeURLs(keys(crawled)) + sitemapList := sanitizeURLs(keys(sitemap)) crawlErrMap := make(map[string]string, len(crawlErrs)) for k, v := range crawlErrs { crawlErrMap[k] = v.Error() } missing := difference(crawled, sitemap) - missingList := keys(missing) + missingList := sanitizeURLs(keys(missing)) inSmNotCrawled := difference(sitemap, crawled) - inSmNotCrawledList := keys(inSmNotCrawled) + inSmNotCrawledList := sanitizeURLs(keys(inSmNotCrawled)) pageOut := make(map[string][]string, len(outlinks)) linkSrc := make(map[string][]string) for page, set := range outlinks { - lst := keys(set) + lst := sanitizeURLs(keys(set)) pageOut[page] = lst for _, u := range lst { linkSrc[u] = append(linkSrc[u], page) } } + // Compute simple status histogram + var st Stats + for _, ls := range check.Statuses { + if ls.OK { + st.OK++ + } else { + st.Broken++ + } + switch { + case ls.StatusCode >= 200 && ls.StatusCode < 300: + st.Status2xx++ + case ls.StatusCode >= 300 && ls.StatusCode < 400: + st.Status3xx++ + case ls.StatusCode >= 400 && ls.StatusCode < 500: + st.Status4xx++ + case ls.StatusCode >= 500 && ls.StatusCode < 600: + st.Status5xx++ + default: + st.StatusOther++ + } + } + return Report{ Target: target, CrawledURLs: crawledList, @@ -53,6 +102,9 @@ func Build(target string, crawled map[string]struct{}, sitemap map[string]struct LinkSources: linkSrc, MissingInSitemap: missingList, InSitemapNotCrawled: inSmNotCrawledList, + Metadata: meta, + Params: params, + Stats: st, } } @@ -94,3 +146,20 @@ func difference(a, b map[string]struct{}) map[string]struct{} { } return res } + +// sanitizeURLs normalizes small variants like trailing "/." to "/" for consistency. +func sanitizeURLs(urls []string) []string { + out := make([]string, 0, len(urls)) + for _, u := range urls { + out = append(out, sanitizeURL(u)) + } + sort.Strings(out) + return out +} + +func sanitizeURL(u string) string { + if len(u) >= 2 && u[len(u)-2:] == "/." { + return u[:len(u)-1] + } + return u +} diff --git a/main.go b/main.go index 5bfc20d..d1575f5 100644 --- a/main.go +++ b/main.go @@ -47,6 +47,17 @@ func main() { client := &http.Client{Timeout: timeout} ctx := context.Background() + // Report metadata + started := time.Now() + meta := report.Metadata{StartedAt: started.UTC().Format(time.RFC3339)} + params := report.Params{ + MaxDepth: maxDepth, + Concurrency: concurrency, + TimeoutMs: timeout.Milliseconds(), + UserAgent: userAgent, + SameHostOnly: sameHostOnly, + } + fmt.Fprintf(os.Stderr, "Starting crawl of %s (depth: %d)...\n", target, maxDepth) // Setup progress counters @@ -137,8 +148,12 @@ func main() { urlsVisited.Load(), urlsErrored.Load()) } + finished := time.Now() + meta.FinishedAt = finished.UTC().Format(time.RFC3339) + meta.DurationMs = finished.Sub(started).Milliseconds() + fmt.Fprintf(os.Stderr, "Building report...\n") - reports := report.Build(target, visited, smURLs, crawlErrs, checkResults, outlinks) + reports := report.Build(target, visited, smURLs, crawlErrs, checkResults, outlinks, meta, params) switch output { case "json": diff --git a/reports/REPORT_SCHEMA.md b/reports/REPORT_SCHEMA.md index a73b3dd..65d5bc5 100644 --- a/reports/REPORT_SCHEMA.md +++ b/reports/REPORT_SCHEMA.md @@ -21,7 +21,28 @@ This document describes the structure of the JSON reports produced by `urlcrawle "https://example.com/about": ["https://example.com"] }, "missingInSitemap": ["https://example.com/page-not-in-sitemap"], - "inSitemapNotCrawled": ["https://example.com/deferred"] + "inSitemapNotCrawled": ["https://example.com/deferred"], + "metadata": { + "startedAt": "2025-08-31T12:34:56Z", + "finishedAt": "2025-08-31T12:35:57Z", + "durationMs": 61000 + }, + "params": { + "maxDepth": 1, + "concurrency": 5, + "timeoutMs": 5000, + "userAgent": "urlcrawler/1.0", + "sameHostOnly": true + }, + "stats": { + "ok": 12, + "broken": 1, + "status2xx": 12, + "status3xx": 0, + "status4xx": 1, + "status5xx": 0, + "statusOther": 0 + } } ``` @@ -49,9 +70,30 @@ This document describes the structure of the JSON reports produced by `urlcrawle - **inSitemapNotCrawled** (string[]; optional): URLs present in the sitemap that were not crawled (e.g., due to depth limits or off-host rules). +- **metadata** (object): Crawl timing information. + - **startedAt** (string, RFC3339) + - **finishedAt** (string, RFC3339) + - **durationMs** (number) + +- **params** (object): Parameters used for the run. + - **maxDepth** (number) + - **concurrency** (number) + - **timeoutMs** (number) + - **userAgent** (string) + - **sameHostOnly** (boolean) + +- **stats** (object): Summary of link status results. + - **ok** (number) + - **broken** (number) + - **status2xx** (number) + - **status3xx** (number) + - **status4xx** (number) + - **status5xx** (number) + - **statusOther** (number) + ### Notes -- URLs are normalized and deduplicated during crawl. +- URLs are normalized and deduplicated during crawl. Minor variants like trailing `/.` are normalized in output. - Content-type filtering: only `text/html` pages are parsed for outlinks. - Sitemap fetching is best-effort; absence is not treated as an error. - The JSON lists are sorted to produce stable outputs across runs. diff --git a/reports/engagewr.ca.json b/reports/engagewr.ca.json new file mode 100644 index 0000000..59d7584 --- /dev/null +++ b/reports/engagewr.ca.json @@ -0,0 +1,5724 @@ +{ + "target": "https://www.engagewr.ca", + "crawledUrls": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/woolwich" + ], + "sitemapUrls": [ + "https://www.engagewr.ca/", + "https://www.engagewr.ca/1-columbia-st-w", + "https://www.engagewr.ca/1-dunbar-rd", + "https://www.engagewr.ca/115-119-park-47-norman", + "https://www.engagewr.ca/137-141-woolwich-st", + "https://www.engagewr.ca/143-columbia-street-w", + "https://www.engagewr.ca/145-lincoln-rd", + "https://www.engagewr.ca/150-152-albert-st", + "https://www.engagewr.ca/155-park-st", + "https://www.engagewr.ca/155-university-ave-w", + "https://www.engagewr.ca/1665-Scotch-Line", + "https://www.engagewr.ca/170-180-columbia-st-w", + "https://www.engagewr.ca/177-179-albert-st", + "https://www.engagewr.ca/18-20-hickory-st", + "https://www.engagewr.ca/180-king-street-south-z-23-05", + "https://www.engagewr.ca/20-university-ave-e", + "https://www.engagewr.ca/200-weber-st-n", + "https://www.engagewr.ca/2023-27-strategic-plan", + "https://www.engagewr.ca/2023-27-strategic-plan/what-s-happening-this-week", + "https://www.engagewr.ca/2023admiralroad", + "https://www.engagewr.ca/2023admiralroad/construction-begins-april-22-2025", + "https://www.engagewr.ca/2023admiralroad/construction-begins-in-april", + "https://www.engagewr.ca/2023admiralroad/field-survey-announced", + "https://www.engagewr.ca/2023admiralroad/project-information-now-available", + "https://www.engagewr.ca/2023admiralroad/reconnect-letter", + "https://www.engagewr.ca/2023admiralroad/stage-1-sod-care-now-shifts-property-owners-roxborough-and-marlborough-avenues", + "https://www.engagewr.ca/2023admiralroad/stage-2-surface-works-construction-begins-aug-7", + "https://www.engagewr.ca/2023admiralroad/tree-management-plan", + "https://www.engagewr.ca/2023admiralroad/updated-tree-planting-list", + "https://www.engagewr.ca/2024-plan-and-budget", + "https://www.engagewr.ca/2024-plan-and-budget/come-talk-to-us-community-engagement-events", + "https://www.engagewr.ca/2024-playgrounds", + "https://www.engagewr.ca/2024-playgrounds/phase-two-news", + "https://www.engagewr.ca/2024-playgrounds/whats-next-after-phase-1", + "https://www.engagewr.ca/2025-budget", + "https://www.engagewr.ca/2025-plan-and-budget", + "https://www.engagewr.ca/2025-zbl-amendment", + "https://www.engagewr.ca/2025-zbl-amendment/township-launches-zoning-law-housekeeping-amendment", + "https://www.engagewr.ca/2026-mayors-budget", + "https://www.engagewr.ca/215-229-lexington-rd", + "https://www.engagewr.ca/22-12-regina-and-erb-street", + "https://www.engagewr.ca/22-church-street-west", + "https://www.engagewr.ca/22-church-street-west/3039", + "https://www.engagewr.ca/22-church-street-west/elmira-property-purchase", + "https://www.engagewr.ca/22-church-street-west/news-22church-rfp", + "https://www.engagewr.ca/22-church-street-west/township-seeks-feedback-proposed-sale-downtown-elmira-properties", + "https://www.engagewr.ca/2415-university-ave-e", + "https://www.engagewr.ca/249-253-sunview-st", + "https://www.engagewr.ca/273-and-275-sunview-street", + "https://www.engagewr.ca/275-erb-st-e", + "https://www.engagewr.ca/277-and-279-hazel-st", + "https://www.engagewr.ca/30-Florapine-Road", + "https://www.engagewr.ca/309-311-hawthorn-st-holding-removal", + "https://www.engagewr.ca/310-316-erb-st-w", + "https://www.engagewr.ca/316-king-st-n", + "https://www.engagewr.ca/325-northfield-drive-east", + "https://www.engagewr.ca/329-and-331-spruce-st", + "https://www.engagewr.ca/333-albert-st", + "https://www.engagewr.ca/354-king-st-n", + "https://www.engagewr.ca/359-369-erb-st-w", + "https://www.engagewr.ca/380-hagey-blvd", + "https://www.engagewr.ca/400-millennium-blvd", + "https://www.engagewr.ca/435-king-st-n", + "https://www.engagewr.ca/435-king-st-n-and-450-460-weber-st-n", + "https://www.engagewr.ca/475-485-king-st-n", + "https://www.engagewr.ca/50-university-ave-e", + "https://www.engagewr.ca/508-beechwood-dr", + "https://www.engagewr.ca/525-conestogo-road", + "https://www.engagewr.ca/525-to-565-conestogo-rd-w", + "https://www.engagewr.ca/556-576-conservation-dr", + "https://www.engagewr.ca/6-14-dietz-avenue-north", + "https://www.engagewr.ca/650-660-erb-st-w", + "https://www.engagewr.ca/651-663-erb-st-w", + "https://www.engagewr.ca/675-conservation-dr", + "https://www.engagewr.ca/720-erbsville-rd", + "https://www.engagewr.ca/85-89-columbia-300-hemlock", + "https://www.engagewr.ca/9-33-47-erb-st-w", + "https://www.engagewr.ca/91-97-milford-avenue", + "https://www.engagewr.ca/AMCC-expansion", + "https://www.engagewr.ca/AMCC-expansion/phase-1", + "https://www.engagewr.ca/AMCC-expansion/phase-1-1", + "https://www.engagewr.ca/AMCC-expansion/phase-2", + "https://www.engagewr.ca/AtTheTable", + "https://www.engagewr.ca/AtTheTable/accountable-and-transparent", + "https://www.engagewr.ca/AtTheTable/booths", + "https://www.engagewr.ca/AtTheTable/draw", + "https://www.engagewr.ca/AtTheTable/evaluate", + "https://www.engagewr.ca/AtTheTable/examples", + "https://www.engagewr.ca/AtTheTable/fairs", + "https://www.engagewr.ca/AtTheTable/hostyourown", + "https://www.engagewr.ca/AtTheTable/online", + "https://www.engagewr.ca/AtTheTable/relationship-building", + "https://www.engagewr.ca/AtTheTable/workshops", + "https://www.engagewr.ca/AtTheTable/youth", + "https://www.engagewr.ca/Gaukel-Street", + "https://www.engagewr.ca/Gaukel-Street/updates", + "https://www.engagewr.ca/LTWMS", + "https://www.engagewr.ca/SportsAffiliation", + "https://www.engagewr.ca/Stage2ION", + "https://www.engagewr.ca/University-Ave", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/accessibility-plan", + "https://www.engagewr.ca/activa-holdings-inc-barnswallow-drive-church-street-west-elmira", + "https://www.engagewr.ca/active-planning-applications", + "https://www.engagewr.ca/affordable-housing-bechtel", + "https://www.engagewr.ca/affordable-housing-bechtel/a-developer-team-is-recommended", + "https://www.engagewr.ca/affordable-housing-bechtel/bechtel-open-house", + "https://www.engagewr.ca/affordable-housing-bechtel/building-permit-approved-for-bechtel", + "https://www.engagewr.ca/affordable-housing-bechtel/come-and-have-your-say", + "https://www.engagewr.ca/affordable-housing-bechtel/geotechnical-investigation-jan-19", + "https://www.engagewr.ca/affordable-housing-bechtel/site-plan-application", + "https://www.engagewr.ca/affordable-housing-bechtel/site-plan-approval-for-bechtel", + "https://www.engagewr.ca/affordable-housing-bechtel/the-containers-for-the-new-bechtel-homes-have-arrived", + "https://www.engagewr.ca/affordable-housing-bechtel/the-containers-have-arrived", + "https://www.engagewr.ca/affordable-housing-bechtel/the-expression-of-interest-has-been-posted", + "https://www.engagewr.ca/affordable-housing-bechtel/update-on-bechtel", + "https://www.engagewr.ca/affordable-housing-bechtel/update-on-the-timeline", + "https://www.engagewr.ca/affordable-housing-bechtel/you-are-invited-to-the-virtual-open-house-for-bechtel-on-february-23-at-10am", + "https://www.engagewr.ca/affordable-housing-beechwood", + "https://www.engagewr.ca/affordable-housing-beechwood/a-developer-is-being-recommended", + "https://www.engagewr.ca/affordable-housing-beechwood/committee-of-adjustment-application", + "https://www.engagewr.ca/affordable-housing-beechwood/committee-of-adjustment-application-correction-to-information-notice-sent-to-neighbouring-property-owners", + "https://www.engagewr.ca/affordable-housing-beechwood/communication-from-southside-group", + "https://www.engagewr.ca/affordable-housing-beechwood/deadline-for-proposals-had-been-extended", + "https://www.engagewr.ca/affordable-housing-beechwood/environmental-assessment-timeline", + "https://www.engagewr.ca/affordable-housing-beechwood/environmental-assessment-update", + "https://www.engagewr.ca/affordable-housing-beechwood/hydro-excavation-on-site", + "https://www.engagewr.ca/affordable-housing-beechwood/moving-forward", + "https://www.engagewr.ca/affordable-housing-beechwood/neighbourhood-meetings-and-design-feedback", + "https://www.engagewr.ca/affordable-housing-beechwood/preliminary-design-feedback-and-next-steps", + "https://www.engagewr.ca/affordable-housing-beechwood/proposals-are-being-reviewed", + "https://www.engagewr.ca/affordable-housing-beechwood/rfp-has-been-posted-to-the-region-of-waterloos-website-you-can-find-the-link-here", + "https://www.engagewr.ca/affordable-housing-beechwood/site-design-option-are-being-created", + "https://www.engagewr.ca/affordable-housing-beechwood/site-work-and-parking", + "https://www.engagewr.ca/affordable-housing-beechwood/survey-still-open", + "https://www.engagewr.ca/affordable-housing-beechwood/technicians-and-consultants-on-site", + "https://www.engagewr.ca/affordable-housing-beechwood/upcoming-neighbourhood-meetings", + "https://www.engagewr.ca/affordable-housing-kingscourt", + "https://www.engagewr.ca/affordable-housing-kingscourt/420-kingscourt-now-has-a-builder", + "https://www.engagewr.ca/affordable-housing-kingscourt/building-permit-approved-for-420-kingscourt-drive", + "https://www.engagewr.ca/affordable-housing-kingscourt/committee-of-adjustment-meeting-with-the-city-of-waterloo-february-13-3pm", + "https://www.engagewr.ca/affordable-housing-kingscourt/construction-timeline-update", + "https://www.engagewr.ca/affordable-housing-kingscourt/construction-update-fall-2024", + "https://www.engagewr.ca/affordable-housing-kingscourt/neighbourhood-meeting-held-on-january-18-2022", + "https://www.engagewr.ca/affordable-housing-kingscourt/neighbourhood-meeting-jan-20-7-8pm", + "https://www.engagewr.ca/affordable-housing-kingscourt/the-tender-for-kingscourt-has-now-been-posted", + "https://www.engagewr.ca/ainslie-street-improvements", + "https://www.engagewr.ca/albert-st-and-hemlock-st", + "https://www.engagewr.ca/albert-watermain", + "https://www.engagewr.ca/albert-watermain/notice-of-public-information-centre-2", + "https://www.engagewr.ca/albert-watermain/public-information-session-2", + "https://www.engagewr.ca/alpinepark", + "https://www.engagewr.ca/alpinepark/alpine-construction-update", + "https://www.engagewr.ca/alpinepark/alpine-park-phase-2-engagement-summary", + "https://www.engagewr.ca/alpinepark/alpine-woodlot-trail-closures", + "https://www.engagewr.ca/alpinepark/construction-of-alpine-park-complete", + "https://www.engagewr.ca/alpinepark/construction-starting-soon-at-alpine-park", + "https://www.engagewr.ca/alpinepark/forum", + "https://www.engagewr.ca/alpinepark/now-available-2", + "https://www.engagewr.ca/alpinepark/previous-page-content-fall-2021", + "https://www.engagewr.ca/alpinepark/previous-page-content-summer-2021", + "https://www.engagewr.ca/alpinepark/project-updates", + "https://www.engagewr.ca/alpinepark/update-alpine-woodlot-trails-2", + "https://www.engagewr.ca/alpinepark/update-on-alpine-park", + "https://www.engagewr.ca/alpinepark/update-on-alpine-park-2", + "https://www.engagewr.ca/alpinepark/update-on-progress-at-alpine-park", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/community-steering-committee", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/end-of-year-update", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/join-a-working-group-for-the-waterloo-region-alternate-destination-clinics-project", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/mission-vision-and-values", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/project-update", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/project-update-2", + "https://www.engagewr.ca/anti-racism", + "https://www.engagewr.ca/anti-racism/2021-community-innovation-grant", + "https://www.engagewr.ca/anti-racism/anti-racism-advisory-working-group-biographies-2022", + "https://www.engagewr.ca/anti-racism/anti-racism-advisory-working-group-update-on-activities", + "https://www.engagewr.ca/anti-racism/anti-racism-virtual-community-town-hall-july-19-2022", + "https://www.engagewr.ca/anti-racism/august-12-2020-town-hall-summary-and-anti-racism-advisory-working-group-next-steps", + "https://www.engagewr.ca/anti-racism/december-18th-first-anti-racism-advisory-working-group-meeting", + "https://www.engagewr.ca/anti-racism/july-15-2020", + "https://www.engagewr.ca/anti-racism/july-21-2020-new-date-added-for-town-hall", + "https://www.engagewr.ca/anti-racism/national-indigenous-history-month-2022", + "https://www.engagewr.ca/anti-racism/november-27th-anti-racism-advisory-working-group-arawg-members-selected", + "https://www.engagewr.ca/anti-racism/october-15th-update-on-anti-racism-advisory-working-group-applications", + "https://www.engagewr.ca/anti-racism/october-30th-update-on-anti-racism-advisory-working-group-applications", + "https://www.engagewr.ca/anti-racism/pride-2022-waterloo-region-national-pride-month", + "https://www.engagewr.ca/anti-racism/project-updates", + "https://www.engagewr.ca/anti-racism/sample-title", + "https://www.engagewr.ca/anti-racism/september-17th-2020-selection-committee-update-and-anti-racism-advisory-working-group-application", + "https://www.engagewr.ca/anti-racism/statement-from-arawg-co-convenors-kamloops-residential-school", + "https://www.engagewr.ca/arthur-street-and-bypass-ea", + "https://www.engagewr.ca/arts-and-culture-masterplan", + "https://www.engagewr.ca/arts-culture", + "https://www.engagewr.ca/asset-management", + "https://www.engagewr.ca/athleticawards", + "https://www.engagewr.ca/athleticawards/council", + "https://www.engagewr.ca/backyard-bbq-community-event-survey", + "https://www.engagewr.ca/backyard-bbq-community-event-survey/test", + "https://www.engagewr.ca/backyard-bbq-community-event-survey/what-does-backyard-bbq-mean-you", + "https://www.engagewr.ca/badentrunk", + "https://www.engagewr.ca/badentrunk/gingerich-road-closure", + "https://www.engagewr.ca/barnswallow-drive-reconstruction-project", + "https://www.engagewr.ca/beaver-creek-rd-and-conservation-dr", + "https://www.engagewr.ca/beaver-creek-rd-and-conservation-dr-2", + "https://www.engagewr.ca/beaver-creek-road-and-conservation-drive-reconstruction", + "https://www.engagewr.ca/beaver-creek-road-and-conservation-drive-reconstruction/notice-reconstruction", + "https://www.engagewr.ca/bechtel-courts", + "https://www.engagewr.ca/belmont", + "https://www.engagewr.ca/belmont/belmont-village-urban-corridor-study-wrap-up", + "https://www.engagewr.ca/belmont/join-us-at-an-upcoming-walkshop", + "https://www.engagewr.ca/belmont/join-us-at-the-virtual-community-check-in-on-november-30th-2", + "https://www.engagewr.ca/belmont/join-us-nov-30-for-a-virtual-community-check-in", + "https://www.engagewr.ca/benton-and-frederick-cycling", + "https://www.engagewr.ca/beverlystreet", + "https://www.engagewr.ca/blackbridge", + "https://www.engagewr.ca/blair-creek-drive", + "https://www.engagewr.ca/blair-creek-drive/notice-of-commencement", + "https://www.engagewr.ca/blair-creek-drive/notice-of-completion", + "https://www.engagewr.ca/blair-creek-drive/public-information-centre", + "https://www.engagewr.ca/blair-creek-drive/public-information-centre-announcement", + "https://www.engagewr.ca/blair-creek-drive/report-to-council", + "https://www.engagewr.ca/bleams-rd", + "https://www.engagewr.ca/blenheim-road-reconstruction-survey", + "https://www.engagewr.ca/blue-beech-link-spraypad", + "https://www.engagewr.ca/blue-beech-link-spraypad/spring-2024-update", + "https://www.engagewr.ca/blue-beech-link-spraypad/spring-2025-update", + "https://www.engagewr.ca/blue-beech-link-spraypad/summer-2025-update", + "https://www.engagewr.ca/blue-beech-link-spraypad/survey-closed-1", + "https://www.engagewr.ca/blue-beech-link-spraypad/winning-design", + "https://www.engagewr.ca/brammyards", + "https://www.engagewr.ca/brammyards/council-supports-vision-for-the-future-of-bramm-yards", + "https://www.engagewr.ca/brammyards/report-to-council-june-13", + "https://www.engagewr.ca/brammyards/work-underway-prepare-bramm-yards-future-development", + "https://www.engagewr.ca/breslau-drain-no-1", + "https://www.engagewr.ca/breslau-secondary-plan-update", + "https://www.engagewr.ca/breslau-wet-well-upgrades-class-environmental-assessment", + "https://www.engagewr.ca/bridgeport-and-weber", + "https://www.engagewr.ca/broadview-avenue", + "https://www.engagewr.ca/broadview-avenue/construction-begins-may-30-2025", + "https://www.engagewr.ca/broadview-avenue/survey-now-open", + "https://www.engagewr.ca/broadview-avenue/surveyors-in-the-ne", + "https://www.engagewr.ca/brucestreet", + "https://www.engagewr.ca/brucestreet/bruce-street-concrete-works-driveway-access-letter", + "https://www.engagewr.ca/brucestreet/bruce-street-sod-start-of-warranty-letter", + "https://www.engagewr.ca/brucestreet/final-project-design-details-2", + "https://www.engagewr.ca/brucestreet/introduction-and-precondition-survey", + "https://www.engagewr.ca/brucestreet/stage-two-sod-end-of-warranty-letter", + "https://www.engagewr.ca/budget-2024", + "https://www.engagewr.ca/budget2026", + "https://www.engagewr.ca/building-safer-communities", + "https://www.engagewr.ca/building-safer-communities/2024-funded-projects", + "https://www.engagewr.ca/building-safer-communities/2025-grant-application", + "https://www.engagewr.ca/building-safer-communities/2025-grant-recipients", + "https://www.engagewr.ca/building-safer-communities/apply-to-join-the-guiding-council-2", + "https://www.engagewr.ca/building-safer-communities/bsc-grant-extension", + "https://www.engagewr.ca/building-safer-communities/building-safer-communities-funded-projects-2", + "https://www.engagewr.ca/building-safer-communities/building-safer-communities-update", + "https://www.engagewr.ca/building-safer-communities/call-for-funding-proposals", + "https://www.engagewr.ca/building-safer-communities/call-for-funding-proposals-2025", + "https://www.engagewr.ca/building-safer-communities/extension-for-bsc-call-for-proposals", + "https://www.engagewr.ca/building-safer-communities/extension-for-guiding-council-application", + "https://www.engagewr.ca/building-safer-communities/march-18th-iftar-registration", + "https://www.engagewr.ca/building-safer-communities/ydmapplication2025", + "https://www.engagewr.ca/building-safer-communities/youth-decision-making-team-application-launch-applications-now-closed-2", + "https://www.engagewr.ca/building-safer-communities/youth-decision-making-team-application-update", + "https://www.engagewr.ca/burn-montrose-metzloff-carlton", + "https://www.engagewr.ca/burn-montrose-metzloff-carlton/construction-starts-month-read-more-details", + "https://www.engagewr.ca/burn-montrose-metzloff-carlton/questionnaire-now-open-until-sept-16", + "https://www.engagewr.ca/burn-montrose-metzloff-carlton/surveyors-in-the-area", + "https://www.engagewr.ca/cachet-homes-victoria-inc", + "https://www.engagewr.ca/cambridge-50th-logo", + "https://www.engagewr.ca/cambridge-ca-fwreview", + "https://www.engagewr.ca/cambridge-community-satisfaction-survey-2022", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive/council-meeting-579-grand-ridge-drive", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive/neighbourhood-meeting-thursday-february-6-2025", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive/thank-you-for-attending-the-neighbourhood-meeting", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive/traffic-and-safety-study-available-0579-grand-ridge-drive", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street/council-meeting-25-chalmers-street", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street/neighbourhood-meeting-monday-february-3-2025", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street/thank-you-for-attending-the-neighbourhood-meeting", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street/traffic-impact-study-available-25-chalmers-street-south", + "https://www.engagewr.ca/cambridge-maple-grove-road", + "https://www.engagewr.ca/cambridge-maple-grove-road/online-public-consultation-centre", + "https://www.engagewr.ca/cambridge-maple-grove-road/public-consultation-centre", + "https://www.engagewr.ca/cambridge-preston-secondary-plan", + "https://www.engagewr.ca/cambridge-to-union-passenger-rail", + "https://www.engagewr.ca/cambridgeavenue", + "https://www.engagewr.ca/cambridgeavenue/city-acceptance-of-sod-on-july-11-2023", + "https://www.engagewr.ca/cambridgeavenue/contractor-introduction-april-11-22", + "https://www.engagewr.ca/cambridgeavenue/project-information-june-2021", + "https://www.engagewr.ca/cambridgeavenue/sod-placement-2", + "https://www.engagewr.ca/cambridgeavenue/update-on-project-status-dec-2022", + "https://www.engagewr.ca/cambridgerec", + "https://www.engagewr.ca/carts", + "https://www.engagewr.ca/cedar-creek-floodplain-study", + "https://www.engagewr.ca/cedar-creek-floodplain-study/public-meeting", + "https://www.engagewr.ca/cedar-creek-floodplain-study/updated-draft-floodplain-mapping", + "https://www.engagewr.ca/cemeteryplan", + "https://www.engagewr.ca/centrevillechicopee", + "https://www.engagewr.ca/centrevillechicopee/city-of-kitchener-looking-for-feedback-on-centreville-chicopee-community-centre-outdoor-spaces", + "https://www.engagewr.ca/centrevillechicopee/construction-delayed-to-2024", + "https://www.engagewr.ca/centrevillechicopee/construction-delayed-to-2025", + "https://www.engagewr.ca/centrevillechicopee/construction-starts-this-fall", + "https://www.engagewr.ca/centrevillechicopee/construction-underway-centreville-chicopee", + "https://www.engagewr.ca/centrevillechicopee/exciting-progress-centreville-chicopee-community-centre", + "https://www.engagewr.ca/chapel-melrose-sheridan", + "https://www.engagewr.ca/chapel-melrose-sheridan/chapel-street-construction-begins-week-read-details", + "https://www.engagewr.ca/chapel-melrose-sheridan/letter-to-residents", + "https://www.engagewr.ca/chapel-melrose-sheridan/questionnaire-deadline-extended-to-sept-16", + "https://www.engagewr.ca/chapel-melrose-sheridan/questionnaire-now-open", + "https://www.engagewr.ca/charles-street-terminal-redevelopment", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/design-consultant-rfp", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/downtown-kitchener-community-survey-live-until-march-1-2024", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/new-short-term-parking", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/project-updates", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/second-round-of-engagement-kicks-off-august-5-2022", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/second-survey-now-closed", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/the-region-of-waterloo-is-currently-seeking-public-applications-for-community-connector-position-s-for-the-charles-street-termin", + "https://www.engagewr.ca/cherrypark", + "https://www.engagewr.ca/cherrypark/cherry-festival-recap-and-cherry-park-upgrades", + "https://www.engagewr.ca/cherrypark/cherry-park-virtual-open-house-is-now-closed", + "https://www.engagewr.ca/cherrypark/join-us-at-the-cherry-park-festival", + "https://www.engagewr.ca/cherrypark/one-week-left-to-give-your-feedback", + "https://www.engagewr.ca/cherrypark/please-join-us-at-our-open-house-on-june-20", + "https://www.engagewr.ca/cherrypark/please-join-us-online-or-in-person-this-summer", + "https://www.engagewr.ca/cherrypark/virtual-open-house-launches", + "https://www.engagewr.ca/cherrypark/what-we-heard-from-you-this-past-summer", + "https://www.engagewr.ca/childrens-services-access-and-inclusion-plan", + "https://www.engagewr.ca/childrens-services-access-and-inclusion-plan/community-engagement-event-wait-list", + "https://www.engagewr.ca/childrens-services-access-and-inclusion-plan/community-engagement-for-the-early-years", + "https://www.engagewr.ca/childrens-services-access-and-inclusion-plan/community-engagement-for-the-early-years-and-child-care-event-may-16-2024-2", + "https://www.engagewr.ca/childrens-services-systems-plan", + "https://www.engagewr.ca/childrens-services-systems-plan/progress-updates", + "https://www.engagewr.ca/childrens-services-systems-plan/test", + "https://www.engagewr.ca/churchill-park-rocketship-playground-renewal", + "https://www.engagewr.ca/cip", + "https://www.engagewr.ca/city-of-waterloo-2020-2022-draft-budget", + "https://www.engagewr.ca/cityownedtrees", + "https://www.engagewr.ca/cityownedtrees/city-owned-trees-bylaw-report-goes-council-june-2", + "https://www.engagewr.ca/cityownedtrees/public-tree-law-updates-approved-council", + "https://www.engagewr.ca/clair-creek-at-keats-way", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-1", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-2", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-3", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-4", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-5", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-6", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-7", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-dec-8-2023", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-november-9", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-october-19-watermain-break", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-october-23-closure-of-keats-way-and-karen-keats-walk", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-september-26", + "https://www.engagewr.ca/clair-creek-at-keats-way/enbridge-gas-upgrades-complete-and-summary-of-upcoming-work-in-the-area", + "https://www.engagewr.ca/clair-creek-at-keats-way/halloween-construction-update-october-31", + "https://www.engagewr.ca/clair-creek-at-keats-way/keats-way-construction-begins-monday-september-18", + "https://www.engagewr.ca/clair-creek-at-keats-way/keats-way-construction-to-begin-in-september", + "https://www.engagewr.ca/clair-creek-at-keats-way/keats-way-construction-update", + "https://www.engagewr.ca/clair-creek-at-keats-way/neighbourhood-meeting-dec1", + "https://www.engagewr.ca/clair-creek-at-keats-way/neighbourhood-meeting-follow-up", + "https://www.engagewr.ca/clair-creek-at-keats-way/notice-of-construction-channel-rehabilitation", + "https://www.engagewr.ca/clair-creek-at-keats-way/project-updates", + "https://www.engagewr.ca/clair-creek-at-keats-way/storm-bypass-construction-and-channel-rehabilitation-update", + "https://www.engagewr.ca/clair-creek-at-keats-way/upcoming-construction-to-rehabilitate-banks-of-tributary-channel-to-clair-creek-and-completion-of-storm-bypass-sewer", + "https://www.engagewr.ca/clair-creek-at-keats-way/update-dec-2021", + "https://www.engagewr.ca/climate-action-and-sustainability", + "https://www.engagewr.ca/columbia-st-w-and-albert-st", + "https://www.engagewr.ca/combatting-hate", + "https://www.engagewr.ca/community-improvement-plan", + "https://www.engagewr.ca/community-improvement-plan/do-you-have-questions-or-thoughts-draft-cip", + "https://www.engagewr.ca/community-improvement-plan/final-cip-here-application-period-opens-june-3rd-2025", + "https://www.engagewr.ca/community-services-master-plan-wilmot", + "https://www.engagewr.ca/communitycanopychandler", + "https://www.engagewr.ca/communitycanopychandler/apply-to-have-a-free-tree-planted-on-your-private-property-2", + "https://www.engagewr.ca/communitycanopychandler/how-to-help-increase-the-tree-canopy-in-chandler-mowat", + "https://www.engagewr.ca/communitycanopychandler/kick-off-summer-with-us-july-5", + "https://www.engagewr.ca/communitycanopychandler/share-your-feedback-on-the-community-canopy-planting-plan-2", + "https://www.engagewr.ca/communitycanopychandler/survey-and-map-closing-soon", + "https://www.engagewr.ca/communitycanopychandler/thank-you-for-growing-a-greener-kitchener", + "https://www.engagewr.ca/communitycanopychandler/visit-us-at-chandler-mowat-community-centre", + "https://www.engagewr.ca/conestoga-college-bus-stops", + "https://www.engagewr.ca/connaught-street", + "https://www.engagewr.ca/connaught-street/construction-begins-month-read-more-details", + "https://www.engagewr.ca/connaught-street/letter-to-residents", + "https://www.engagewr.ca/connaught-street/test", + "https://www.engagewr.ca/conradcentre", + "https://www.engagewr.ca/conradcentre/council-approves-new-operating-model-for-conrad-centre-2", + "https://www.engagewr.ca/conradcentre/oct-28-report-to-council", + "https://www.engagewr.ca/conwayandwayne", + "https://www.engagewr.ca/conwayandwayne/contractor-introduction-parking-and-pre-condition-inspection", + "https://www.engagewr.ca/conwayandwayne/contractor-introduction-precondition-survey-and-parking-phase-3", + "https://www.engagewr.ca/conwayandwayne/letter-to-residents", + "https://www.engagewr.ca/conwayandwayne/sod-replacement-due-to-construction-2", + "https://www.engagewr.ca/conwayandwayne/surface-works-and-driveway-access-2", + "https://www.engagewr.ca/conwayandwayne/surface-works-and-driveway-access-phase-1", + "https://www.engagewr.ca/conwayandwayne/wayne-drive-surface-works-and-driveway-access", + "https://www.engagewr.ca/cooper-street-reconstruction-survey", + "https://www.engagewr.ca/copper-st-dog-park", + "https://www.engagewr.ca/copper-st-dog-park/construction-has-started", + "https://www.engagewr.ca/copper-st-dog-park/news-feed", + "https://www.engagewr.ca/copper-st-dog-park/spring-2025-update", + "https://www.engagewr.ca/country-hills-park", + "https://www.engagewr.ca/country-hills-park/corrected-open-house-date-july-24-2024", + "https://www.engagewr.ca/country-hills-park/country-hills-open-house-materials-and-final-survey", + "https://www.engagewr.ca/country-hills-park/country-hills-park-open-house-today-share-your-feedback-2", + "https://www.engagewr.ca/country-hills-park/field-studies-in-november-2", + "https://www.engagewr.ca/country-hills-park/first-survey-now-open", + "https://www.engagewr.ca/country-hills-park/healthy-yards-webinar-series", + "https://www.engagewr.ca/country-hills-park/join-us-at-the-july-24-country-hills-park-open-house", + "https://www.engagewr.ca/country-hills-park/let-s-talk-park-improvements-at-country-hills-park-january-28-and-february-2", + "https://www.engagewr.ca/country-hills-park/missing-the-open-house-answer-our-survey", + "https://www.engagewr.ca/country-hills-park/newsfeed-post", + "https://www.engagewr.ca/country-hills-park/one-week-until-the-open-house", + "https://www.engagewr.ca/country-hills-park/open-house-materials-available-share-your-feedback", + "https://www.engagewr.ca/country-hills-park/open-house-wednesday-rain-or-shine", + "https://www.engagewr.ca/country-hills-park/please-join-us-at-our-open-house-on-nov-22", + "https://www.engagewr.ca/country-hills-park/preliminary-concept-from-2016-stormwater-master-plan", + "https://www.engagewr.ca/country-hills-park/register-for-the-july-17-open-house", + "https://www.engagewr.ca/country-hills-park/save-date-april-1-open-house", + "https://www.engagewr.ca/country-hills-park/save-the-date-november-22-2023-open-house", + "https://www.engagewr.ca/country-hills-park/survey-deadline-extended-to-february-12-2023", + "https://www.engagewr.ca/country-hills-park/two-weeks-left-to-answer-the-design-survey", + "https://www.engagewr.ca/country-hills-park/upgrades-country-hills-park-begin-construction-late-august", + "https://www.engagewr.ca/country-hills-park/video-presentations-now-available", + "https://www.engagewr.ca/country-hills-park/what-we-heard-about-construction-and-how-we-engaged", + "https://www.engagewr.ca/country-hills-park/what-we-heard-about-the-final-design-option", + "https://www.engagewr.ca/country-hills-park/what-we-heard-from-our-first-open-house-and-survey", + "https://www.engagewr.ca/country-hills-park/what-we-heard-from-the-winter-2023-surveys-and-pop-up-events", + "https://www.engagewr.ca/country-hills-park/wrapping-up-field-assessment-phase", + "https://www.engagewr.ca/countryside-ponds", + "https://www.engagewr.ca/countryside-ponds/first-survey-now-open", + "https://www.engagewr.ca/countryside-ponds/healthy-yards-webinar-series", + "https://www.engagewr.ca/countryside-ponds/missed-the-open-house-answer-our-survey", + "https://www.engagewr.ca/countryside-ponds/newsfeed-post", + "https://www.engagewr.ca/countryside-ponds/one-week-until-the-open-house", + "https://www.engagewr.ca/countryside-ponds/preliminary-concept-from-2016-stormwater-master-plan", + "https://www.engagewr.ca/countryside-ponds/save-the-date-oct-29-open-house", + "https://www.engagewr.ca/countryside-ponds/what-we-heard-about-the-design-options", + "https://www.engagewr.ca/countryside-ponds/what-we-heard-from-the-winter-2023-survey-2", + "https://www.engagewr.ca/countryside-ponds/wrapping-up-field-assessment-phase", + "https://www.engagewr.ca/cricketstrategy", + "https://www.engagewr.ca/cricketstrategy/answer-the-survey", + "https://www.engagewr.ca/cricketstrategy/cricket-strategy-what-we-heard-report", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection/construction-update-spring-2021", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection/project-update-april-2025", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection/project-update-february-16-2024", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection/updated-faqs", + "https://www.engagewr.ca/deerpark-crescent", + "https://www.engagewr.ca/deerpark-crescent/letter-to-residents", + "https://www.engagewr.ca/deerpark-crescent/questionnaire-open-until-aug-8-2025", + "https://www.engagewr.ca/development-planning-projects", + "https://www.engagewr.ca/development-planning-projects/apps-with-decisions", + "https://www.engagewr.ca/digitalkitchener", + "https://www.engagewr.ca/digitalkitchener/ccstaff", + "https://www.engagewr.ca/digitalkitchener/connect-share-and-shape-future-tech-kitchener", + "https://www.engagewr.ca/digitalkitchener/connect-share-and-win-join-digital-kitchener-person-session", + "https://www.engagewr.ca/digitalkitchener/follow-up", + "https://www.engagewr.ca/digitalkitchener/residents", + "https://www.engagewr.ca/digitalkitchener/staff", + "https://www.engagewr.ca/digitalkitchener/tech", + "https://www.engagewr.ca/digitalkitchener/tell-us-what-matters-most-you", + "https://www.engagewr.ca/digitalkitchener/what-we-heard-you", + "https://www.engagewr.ca/doddslane", + "https://www.engagewr.ca/doddslane/letter-to-residents", + "https://www.engagewr.ca/dodge-drive", + "https://www.engagewr.ca/dodge-drive/may-2024-update", + "https://www.engagewr.ca/doon", + "https://www.engagewr.ca/downtown-cambridge-truck-diversion-study", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/city-of-kitchener-completes-tree-and-paver-replacement-project-along-king-street-with-support-from-feddev-ontario", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/construction-complete-inspection-to-follow", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/downtown-tree-and-paver-update", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/information-session-mar-3", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/july-lane-closures-and-restrictions", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/more-information-now-available", + "https://www.engagewr.ca/dtkvision", + "https://www.engagewr.ca/dtkvision/do-it-yourself-diy-workshop-deadline-extend-to-april-16", + "https://www.engagewr.ca/dtkvision/how-to-get-involved", + "https://www.engagewr.ca/dtkvision/report-to-council", + "https://www.engagewr.ca/dtkvision/share-your-thoughts-on-the-draft-dtk-vision", + "https://www.engagewr.ca/dtkvision/share-your-vision-and-help-transform-the-future-of-downtown-kitchener-2", + "https://www.engagewr.ca/dtkvision/vision-for-downtown-kitchener-focuses-on-vibrancy-connection", + "https://www.engagewr.ca/dtkvision/what-we-heard-about-the-dtk-vision", + "https://www.engagewr.ca/duke-street-cycling-improvements", + "https://www.engagewr.ca/duke-street-reconstruction", + "https://www.engagewr.ca/dundeesecondaryplan", + "https://www.engagewr.ca/dundeesecondaryplan/big-moves", + "https://www.engagewr.ca/dundeesecondaryplan/join-tonight-s-public-meeting-or-share-feedback-online", + "https://www.engagewr.ca/dundeesecondaryplan/june-9th-public-engagement-meeting-video-recording", + "https://www.engagewr.ca/dundeesecondaryplan/learn-more-and-share-your-feedback-until-june-27", + "https://www.engagewr.ca/dundeesecondaryplan/notice-of-commencement", + "https://www.engagewr.ca/dundeesecondaryplan/notice-of-commencement-and-public-engagement-meeting", + "https://www.engagewr.ca/dundeesecondaryplan/project-update-new-study-area", + "https://www.engagewr.ca/dundeesecondaryplan/public-engagement-meeting-may-28-2025", + "https://www.engagewr.ca/dunke-street-culvert", + "https://www.engagewr.ca/east-side-lands", + "https://www.engagewr.ca/eastavenue", + "https://www.engagewr.ca/eastavenue/construction-begins-may-6-2024", + "https://www.engagewr.ca/eastavenue/construction-begins-this-month", + "https://www.engagewr.ca/eastavenue/project-information-and-first-public-engagement", + "https://www.engagewr.ca/eastbridge-green-spraypad", + "https://www.engagewr.ca/eastbridge-green-spraypad/spray-pad-open", + "https://www.engagewr.ca/eastbridge-green-spraypad/spring-2024-update", + "https://www.engagewr.ca/eastbridge-green-spraypad/spring-2025-update", + "https://www.engagewr.ca/eastbridge-green-spraypad/survey-closed", + "https://www.engagewr.ca/eastbridge-green-spraypad/winning-design-chosen", + "https://www.engagewr.ca/eastgaltchl", + "https://www.engagewr.ca/eby-farm-playground", + "https://www.engagewr.ca/eby-farm-playground/council-approved-funding-to-begin-construction", + "https://www.engagewr.ca/eby-farm-playground/phase-1-complete", + "https://www.engagewr.ca/eby-farm-playground/phase-2-why-are-we-making-these-changes", + "https://www.engagewr.ca/eby-farmstead", + "https://www.engagewr.ca/eby-farmstead/animal-display-comparators", + "https://www.engagewr.ca/eby-farmstead/history-of-animals-in-waterloo-park", + "https://www.engagewr.ca/eby-farmstead/marti-test-subpage", + "https://www.engagewr.ca/eby-farmstead/take-our-survey", + "https://www.engagewr.ca/eby-farmstead/the-current-herd", + "https://www.engagewr.ca/eby-farmstead/what-we-did-2", + "https://www.engagewr.ca/eby-farmstead/what-we-heard", + "https://www.engagewr.ca/edith-macintosh", + "https://www.engagewr.ca/edith-macintosh/december-1-update", + "https://www.engagewr.ca/edith-macintosh/project-updates", + "https://www.engagewr.ca/elgin-reconstruction", + "https://www.engagewr.ca/enablingfourunits", + "https://www.engagewr.ca/enablingfourunits/add-your-comments-online-or-at-an-open-house", + "https://www.engagewr.ca/enablingfourunits/draft-zoning-regulations-now-available", + "https://www.engagewr.ca/enablingfourunits/enabling-four-units-approved-by-council", + "https://www.engagewr.ca/enablingfourunits/followup", + "https://www.engagewr.ca/enablingfourunits/join-us-to-learn-more-about-the-enabling-four-units-project", + "https://www.engagewr.ca/enablingfourunits/new-information-about-adding-additional-dwelling-units", + "https://www.engagewr.ca/enablingfourunits/official-plan-and-zoning-by-law-amendments-now-in-effect", + "https://www.engagewr.ca/enablingfourunits/one-year-follow-survey", + "https://www.engagewr.ca/enablingfourunits/open-house-posters-now-available", + "https://www.engagewr.ca/enablingfourunits/proposed-official-plan-and-zoning-by-law-reports-now-available", + "https://www.engagewr.ca/enablingfourunits/public-meeting-on-draft-zoning-amendments-mar-25", + "https://www.engagewr.ca/enablingfourunits/virtual-public-meeting-recording-now-available", + "https://www.engagewr.ca/encroachment-bylaw-review", + "https://www.engagewr.ca/end-chronic-homelessness", + "https://www.engagewr.ca/end-chronic-homelessness/end-chronic-homelessness-news-feed", + "https://www.engagewr.ca/end-chronic-homelessness/funding-allocated-for-the-region-s-plan-to-end-chronic-homelessness-2", + "https://www.engagewr.ca/end-chronic-homelessness/media-release-share-your-voice-as-a-community-how-can-we-end-chronic-homelessness", + "https://www.engagewr.ca/end-chronic-homelessness/mid-project-key-findings-report-2", + "https://www.engagewr.ca/end-chronic-homelessness/news-feed", + "https://www.engagewr.ca/end-chronic-homelessness/prioritization-plan-end-chronic-homelessness-pech-work", + "https://www.engagewr.ca/end-chronic-homelessness/social-development-centre-waterloo-region-video-introduction-to-the-plan-to-end-chronic-homelessness", + "https://www.engagewr.ca/end-chronic-homelessness/video-community", + "https://www.engagewr.ca/end-chronic-homelessness/video-overlap-associates-social-development-centre-waterloo-region-sdcwr-and-region-of-waterloo-staff-co-present-an-update-to-co", + "https://www.engagewr.ca/end-chronic-homelessness/video-report-to-community", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/engage-north-dumfries", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/construction-updates-june-2024", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/december-2024-year-end-update", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/design-improvement-march-2023", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/fall-2020-public-input", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/project-update", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/project-update-phased-approach", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/project-updates", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/public-meeting", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/public-meeting-questions", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/test", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/virtual-public-meeting-presentation", + "https://www.engagewr.ca/erb-columbia-wilmot", + "https://www.engagewr.ca/erb-st-and-wilmot-line", + "https://www.engagewr.ca/erbsville-north-planning", + "https://www.engagewr.ca/ericktraplin", + "https://www.engagewr.ca/ericktraplin/erick-traplin-day-sunday-can-we-use-your-photo", + "https://www.engagewr.ca/fads", + "https://www.engagewr.ca/fads/final-update-facility-accessibility-design-standards", + "https://www.engagewr.ca/fads/thank-you-for-contributing", + "https://www.engagewr.ca/fairfieldavenue", + "https://www.engagewr.ca/fairfieldavenue/letter-to-residents", + "https://www.engagewr.ca/farrier-drive-farrier-place", + "https://www.engagewr.ca/farrier-drive-farrier-place/letter-to-residents", + "https://www.engagewr.ca/farrier-drive-farrier-place/questionnaire-now-open", + "https://www.engagewr.ca/father-david-bauer-dr-and-merchant-dr", + "https://www.engagewr.ca/father-david-bauer-drive-play-area", + "https://www.engagewr.ca/father-david-bauer-drive-play-area/natural-play-area", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/fergus-avenue-end-of-sod-warranty-stage-two", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/fergus-avenue-end-of-stage-one-sod-warranty-2", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/fergus-avenue-start-of-sod-warranty-stage-two", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/letter-to-residents", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/sod-replacement-stage-one-2", + "https://www.engagewr.ca/fhstudy", + "https://www.engagewr.ca/fifeavenue", + "https://www.engagewr.ca/fifeavenue/construction-begins-september-2024", + "https://www.engagewr.ca/fifeavenue/intersection-closure-frederick-street-ann-street", + "https://www.engagewr.ca/fifeavenue/letter-to-residents", + "https://www.engagewr.ca/fifeavenue/new-stage-3-construction-begins-month", + "https://www.engagewr.ca/fifeavenue/phase-2-surface-works-begin-month", + "https://www.engagewr.ca/fifeavenue/project-information-and-new-resident-surveys", + "https://www.engagewr.ca/fireworks", + "https://www.engagewr.ca/fireworks/city-waterloo-amend-fireworks-bylaw-address-ongoing-concerns", + "https://www.engagewr.ca/fireworks/kitchener-city-council-approves-ban-sale-fireworks", + "https://www.engagewr.ca/fireworks/report-kitchener-city-council-april-14-2025", + "https://www.engagewr.ca/fireworks/township-north-dumfries-increases-fines-fireworks-violations", + "https://www.engagewr.ca/former-kraus-lands", + "https://www.engagewr.ca/former-kraus-lands/for-sale", + "https://www.engagewr.ca/former-kraus-lands/land-surplus", + "https://www.engagewr.ca/former-kraus-lands/proposed-plan", + "https://www.engagewr.ca/fountain-street-reconstruction", + "https://www.engagewr.ca/fountain-street-reconstruction/project-update-july-2025", + "https://www.engagewr.ca/fountain-street-reconstruction/public-information-session", + "https://www.engagewr.ca/four-units-four-storeys", + "https://www.engagewr.ca/four-units-four-storeys/formal-public-meeting-tonight-at-6-30pm", + "https://www.engagewr.ca/four-units-four-storeys/have-your-voice-heard-at-the-formal-public-meeting", + "https://www.engagewr.ca/four-units-four-storeys/have-your-voice-heard-on-the-four-units-four-storeys-initiative", + "https://www.engagewr.ca/four-units-four-storeys/join-us-at-the-formal-public-meeting-on-december-9th-at-6-30pm", + "https://www.engagewr.ca/four-units-four-storeys/join-us-for-a-virtual-public-meeting-on-october-30th", + "https://www.engagewr.ca/four-units-four-storeys/staff-report-is-now-available", + "https://www.engagewr.ca/four-units-four-storeys/thank-you-for-coming-to-the-virtual-public-meeting", + "https://www.engagewr.ca/four-units-four-storeys/waterloo-council-approves-four-units-four-storeys", + "https://www.engagewr.ca/four-units-four-storeys/what-can-additional-residential-units-do-you", + "https://www.engagewr.ca/four-units-four-storeys/what-kind-of-additions-can-i-make-to-my-home", + "https://www.engagewr.ca/franklin-blvd-improvements", + "https://www.engagewr.ca/franklinstreetsouth", + "https://www.engagewr.ca/franklinstreetsouth/contractor-intro", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-noise-exemption-and-extended-work-hours", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-reconnection-letter", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-sod-end-of-warranty-stage-one", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-sod-end-of-warranty-stage-two", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-sod-start-of-warranty-stage-three", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-sod-start-of-warranty-stage-two", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-stage-three-end-of-sod-warranty-letter", + "https://www.engagewr.ca/franklinstreetsouth/project-info", + "https://www.engagewr.ca/franklinstreetsouth/public-information", + "https://www.engagewr.ca/franklinstreetsouth/sod-replacement-stage-one-wilson-avenue-to-kingsway-drive", + "https://www.engagewr.ca/frederick-street-shelter", + "https://www.engagewr.ca/frederick-street-shelter/news-feed", + "https://www.engagewr.ca/frederickstreet", + "https://www.engagewr.ca/frederickstreet/construction-begins-march-31-2025", + "https://www.engagewr.ca/frederickstreet/construction-begins-september-2024", + "https://www.engagewr.ca/frederickstreet/frederick-street-construction-continues-stage-3-begins-next-week", + "https://www.engagewr.ca/frederickstreet/frederick-street-surface-works-begin-june-23-2025", + "https://www.engagewr.ca/frederickstreet/letter-to-residents", + "https://www.engagewr.ca/frederickstreet/sod-placement-notice-bruce-street-nearly-river-road", + "https://www.engagewr.ca/frederickstreet/stage-4-construction-begins-august-25-2025", + "https://www.engagewr.ca/frederickstreet/surface-works-begin-nov-25", + "https://www.engagewr.ca/frederickstreet/update-frederick-street-construction-bruce-street-victoria-street-north", + "https://www.engagewr.ca/frederickstreet/update-on-construction", + "https://www.engagewr.ca/future-of-trees-waterloo", + "https://www.engagewr.ca/galt-core-heritage-conservation-district", + "https://www.engagewr.ca/general-amendments-2024", + "https://www.engagewr.ca/george-street-high-street-and-charles-street-reconstruction-project", + "https://www.engagewr.ca/get-readi-plan", + "https://www.engagewr.ca/get-readi-plan/news-feed", + "https://www.engagewr.ca/govstack-themes-survey", + "https://www.engagewr.ca/grants", + "https://www.engagewr.ca/great-places-2023", + "https://www.engagewr.ca/great-places-2023/announcing-the-people-s-choice", + "https://www.engagewr.ca/great-places-2023/great-places-awards-celebrate-outstanding-development-projects-in-kitchener", + "https://www.engagewr.ca/great-places-2023/register-to-attend-the-great-places-awards", + "https://www.engagewr.ca/greenfieldtraynor", + "https://www.engagewr.ca/greenfieldtraynor/contractor-introduction-letter", + "https://www.engagewr.ca/greenfieldtraynor/letter-to-residents", + "https://www.engagewr.ca/greenfieldtraynor/sod-letter-greenfield", + "https://www.engagewr.ca/greenfieldtraynor/sod-letter-traynor", + "https://www.engagewr.ca/greenhouse-reduction-pathway-feasibility-study", + "https://www.engagewr.ca/greenhouseroad-ea", + "https://www.engagewr.ca/growingtogether", + "https://www.engagewr.ca/growingtogether/city-kitchener-enables-35000-new-homes-growing-together-east-policy", + "https://www.engagewr.ca/growingtogether/join-us-at-a-workshop-this-summer", + "https://www.engagewr.ca/growingtogether/share-your-feedback-on-the-draft-land-use-and-zoning-2", + "https://www.engagewr.ca/growingtogether/staff-office-hours", + "https://www.engagewr.ca/growingtogether/staff-report-and-attachments-now-available", + "https://www.engagewr.ca/growingtogetherwest", + "https://www.engagewr.ca/growingtogetherwest/additional-engagement-opportunity", + "https://www.engagewr.ca/growingtogetherwest/growing-together-west-update", + "https://www.engagewr.ca/growingtogetherwest/join-us-to-learn-more-about-the-draft-approach-to-growth-and-change-in-kitchener-s-major-transit-station-areas", + "https://www.engagewr.ca/growingtogetherwest/join-us-to-learn-more-about-the-growth-around-kitchener-s-major-transit-station-areas", + "https://www.engagewr.ca/growingtogetherwest/june-2023-status-update", + "https://www.engagewr.ca/growingtogetherwest/kitchener-takes-bold-action-on-housing-with-growing-together-plan-and-inclusionary-zoning-bylaw", + "https://www.engagewr.ca/growingtogetherwest/share-your-feedback-on-our-draft-approach-to-growth-and-change", + "https://www.engagewr.ca/growingtogetherwest/share-your-feedback-on-our-draft-official-plan-amendment-and-zoning-by-law-regulations", + "https://www.engagewr.ca/growingtogetherwest/staff-report-and-meeting-agenda", + "https://www.engagewr.ca/growingtogetherwest/staff-report-going-to-council-mar-18", + "https://www.engagewr.ca/growingtogetherwest/thank-you-for-your-feedback", + "https://www.engagewr.ca/grt-business-plan", + "https://www.engagewr.ca/grt-business-plan/business-plan-pop-up-sessions", + "https://www.engagewr.ca/grt-business-plan/grt-business-plan-launch", + "https://www.engagewr.ca/grt-business-plan/township-transit-virtual-sessions", + "https://www.engagewr.ca/halter-avenue-isley-drive-and-notre-dame-avenue-reconstruction-project", + "https://www.engagewr.ca/harryclasspool", + "https://www.engagewr.ca/harryclasspool/final-update-harry-class-pool-upgrades", + "https://www.engagewr.ca/harryclasspool/how-to-get-involved", + "https://www.engagewr.ca/harryclasspool/what-we-heard", + "https://www.engagewr.ca/heidelberg-park-revitalization", + "https://www.engagewr.ca/hespeler-heritage-conservation-district-study-and-plan", + "https://www.engagewr.ca/hespeler-heritage-conservation-district-study-and-plan-1", + "https://www.engagewr.ca/hespelercoreparking", + "https://www.engagewr.ca/hickory-and-hemlock", + "https://www.engagewr.ca/hidden-valley-flood-ea", + "https://www.engagewr.ca/hidden-valley-flood-ea/notice-of-commencement", + "https://www.engagewr.ca/hidden-valley-flood-ea/notice-of-study-completion", + "https://www.engagewr.ca/hidden-valley-flood-ea/public-information-centre-materials-now-available", + "https://www.engagewr.ca/hidden-valley-flood-ea/public-information-centre-oct-12-2023", + "https://www.engagewr.ca/hiddenvalley", + "https://www.engagewr.ca/hiddenvalley/council-approves-amendments-hidden-valley-land-use-implementation-project", + "https://www.engagewr.ca/hiddenvalley/environmental-impact-study", + "https://www.engagewr.ca/hiddenvalley/hidden-valley-health-impact-assessment", + "https://www.engagewr.ca/hiddenvalley/newsfeed-post", + "https://www.engagewr.ca/hiddenvalley/open-house-information-now-available", + "https://www.engagewr.ca/hiddenvalley/report-to-council", + "https://www.engagewr.ca/hiddenvalley/source-water-protection", + "https://www.engagewr.ca/high-performance-development-standards", + "https://www.engagewr.ca/highland", + "https://www.engagewr.ca/highland-and-delaware", + "https://www.engagewr.ca/highland-and-delaware/contractor-introduction-parking-and-pre-condition-inspection", + "https://www.engagewr.ca/highland-and-delaware/highland-road-east-and-delaware-avenue-reconstruction-tree-management-protection", + "https://www.engagewr.ca/highland-and-delaware/highland-road-stage-1-end-of-sod-warranty-letter", + "https://www.engagewr.ca/highland-and-delaware/kitchener-s-highland-road-undergoes-complete-street-transformation-with-new-continuous-sidewalks", + "https://www.engagewr.ca/highland-and-delaware/letter-to-residents", + "https://www.engagewr.ca/highland-and-delaware/project-details-and-project-presentation-boards", + "https://www.engagewr.ca/highland-and-delaware/reconnection-letter", + "https://www.engagewr.ca/highland-and-delaware/sod-replacement-letter", + "https://www.engagewr.ca/highland-and-delaware/stage-2-surface-works", + "https://www.engagewr.ca/highland-and-delaware/stage-2b-sod-acceptance", + "https://www.engagewr.ca/highland-and-delaware/surface-works", + "https://www.engagewr.ca/highland-and-delaware/xx", + "https://www.engagewr.ca/highland/project-updates", + "https://www.engagewr.ca/highland/request-for-proposals-has-been-posted", + "https://www.engagewr.ca/homes-for-all-summit", + "https://www.engagewr.ca/housing-needs-assessment-2", + "https://www.engagewr.ca/housing-needs-assessment-2/housing-needs-assessment", + "https://www.engagewr.ca/housing-needs-assessment-2/housing-needs-assessment-federal-template", + "https://www.engagewr.ca/idlewood-stormwater", + "https://www.engagewr.ca/idlewood-stormwater/correction-to-survey-2", + "https://www.engagewr.ca/idlewood-stormwater/first-survey-now-open", + "https://www.engagewr.ca/idlewood-stormwater/join-our-open-house-on-may-1", + "https://www.engagewr.ca/idlewood-stormwater/join-the-nurture-nature-workshop-at-the-open-house", + "https://www.engagewr.ca/idlewood-stormwater/newsfeed-post", + "https://www.engagewr.ca/idlewood-stormwater/one-week-left-to-answer-the-design-survey", + "https://www.engagewr.ca/idlewood-stormwater/pic-materials-available-answer-our-survey", + "https://www.engagewr.ca/idlewood-stormwater/preliminary-concept-from-2016-stormwater-masterplan", + "https://www.engagewr.ca/idlewood-stormwater/what-we-heard-from-the-winter-2023-survey", + "https://www.engagewr.ca/idlewood-stormwater/what-we-heard-from-you-and-our-next-steps", + "https://www.engagewr.ca/idlewood-stormwater/where-is-idlewood-greenway", + "https://www.engagewr.ca/idlewood-stormwater/wrapping-up-field-assessment-phase", + "https://www.engagewr.ca/inclusionary-zoning", + "https://www.engagewr.ca/inclusionary-zoning-amendment", + "https://www.engagewr.ca/inclusionary-zoning/answer-our-survey-on-inclusionary-zoning", + "https://www.engagewr.ca/inclusionary-zoning/development-community-engagement", + "https://www.engagewr.ca/inclusionary-zoning/inclusionary-zoning-policy-and-discussion-paper-set-to-go-to-kitchener-council-on-june-19-and-waterloo-council-on-june-26", + "https://www.engagewr.ca/inclusionary-zoning/inclusionary-zoning-report-to-be-presented-to-kitchener-city-council", + "https://www.engagewr.ca/inclusionary-zoning/jan-23-public-meeting-on-inclusionary-zoning", + "https://www.engagewr.ca/inclusionary-zoning/kitchener-council-approves-inclusionary-zoning-for-2026", + "https://www.engagewr.ca/inclusionary-zoning/kitchener-takes-bold-action-on-housing-with-growing-together-plan-and-inclusionary-zoning-bylaw", + "https://www.engagewr.ca/inclusionary-zoning/public-meeting-jan-29-2024", + "https://www.engagewr.ca/inclusionary-zoning/public-meeting-takes-place-in-waterloo-on-june-24", + "https://www.engagewr.ca/inclusionary-zoning/send-us-your-thoughts-and-feedback-on-the-discussion-paper", + "https://www.engagewr.ca/inclusionary-zoning/staff-report-going-to-council-mar-18", + "https://www.engagewr.ca/inclusionary-zoning/staff-report-going-to-kitchener-city-council-on-december-2", + "https://www.engagewr.ca/inclusionary-zoning/staff-report-waterloo-city-council-mar-3", + "https://www.engagewr.ca/inclusionary-zoning/waterloo-city-council-defers-implementation-inclusionary-zoning", + "https://www.engagewr.ca/indianroad", + "https://www.engagewr.ca/indianroad/letter-to-residents", + "https://www.engagewr.ca/indianroad/students-and-staff-host-feast-to-reflect-on-renaming-process", + "https://www.engagewr.ca/infrastructure-projects-bridges-roads-water-and-sewer", + "https://www.engagewr.ca/initiative-9-redevelopment-places-worship-housing", + "https://www.engagewr.ca/interim-housing-solutions", + "https://www.engagewr.ca/interim-housing-solutions/updates", + "https://www.engagewr.ca/johnston-patrick-wellington", + "https://www.engagewr.ca/johnston-patrick-wellington/letter-to-residents", + "https://www.engagewr.ca/josephandstewart", + "https://www.engagewr.ca/josephandstewart/2nd-public-information-letter", + "https://www.engagewr.ca/josephandstewart/construction-on-pause-until-summer-2023", + "https://www.engagewr.ca/josephandstewart/construction-scheduled-to-start-july-4-2022", + "https://www.engagewr.ca/josephandstewart/contractor-intro", + "https://www.engagewr.ca/josephandstewart/letter-to-residents", + "https://www.engagewr.ca/jumpstart-accessible-multi-sport-court", + "https://www.engagewr.ca/king-and-coronation-improvements", + "https://www.engagewr.ca/king-and-coronation-improvements/project-updates", + "https://www.engagewr.ca/king-street-east", + "https://www.engagewr.ca/king-street-east/project-introduction-and-surveyor-information", + "https://www.engagewr.ca/king-street-shelter", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-community-meeting-june-20", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-community-meeting-sept-12", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-may-30-2024-update", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-neighbourhood-meeting-january-23", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-update-july-16-2024", + "https://www.engagewr.ca/king-street-shelter/king-street-shelter-closure-update-january-2025", + "https://www.engagewr.ca/king-street-shelter/king-street-shelter-closure-update-march-2025", + "https://www.engagewr.ca/king-street-shelter/project-updates", + "https://www.engagewr.ca/kingsdale", + "https://www.engagewr.ca/kingsdale/join-us-at-the-summer-splash-bash-and-movie-night", + "https://www.engagewr.ca/kingsdale/strengths", + "https://www.engagewr.ca/kingsdale/tell-us-what-strengths-you-see-kingsdale-neighbourhood-and-share-your-gifts", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/kitchener-budget-2024", + "https://www.engagewr.ca/kitchener-budget-2024/draft-2024-budget-continues-trend-of-delivering-value-for-kitchener-residents", + "https://www.engagewr.ca/kitchener-budget-2024/get-involved-in-the-2024-budget-process-2", + "https://www.engagewr.ca/kitchener-budget-2024/kitchener-s-finalized-2024-budget-includes-key-investments-to-advance-community-priorities-2", + "https://www.engagewr.ca/kitchener-budget-2025", + "https://www.engagewr.ca/kitchener-budget-2025/deadline-extended-to-nov-26", + "https://www.engagewr.ca/kitchener-budget-2025/draft-documents-now-available-survey-closes-nov-20", + "https://www.engagewr.ca/kitchener-budget-2025/kitchener-adopts-budget-that-invests-in-infrastructure-delivers-value", + "https://www.engagewr.ca/kitchener-lancaster-street", + "https://www.engagewr.ca/kitchener-new-dundee-road-roundabout", + "https://www.engagewr.ca/kitchener-wastewater-treatment-plant", + "https://www.engagewr.ca/kitchener2051", + "https://www.engagewr.ca/kitchener2051/approaches-growth-workshop", + "https://www.engagewr.ca/kitchener2051/approaches-growth-workshop-and-matching-online-activity", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/1-getting-around", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/2-coffee-time", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/3-right-fit", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/4-to-do", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/5-unwind", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/6-dinner-time", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/7-experience", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/8-night-out", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/big-reveal", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/core-assumptions", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/scenarios", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/week-in-the-life", + "https://www.engagewr.ca/kitchener2051/block-party", + "https://www.engagewr.ca/kitchener2051/community-conversation-kit", + "https://www.engagewr.ca/kitchener2051/continuing-the-conversation-with-launch-on-the-go-2", + "https://www.engagewr.ca/kitchener2051/deadline-extended-to-complete-online-activities", + "https://www.engagewr.ca/kitchener2051/help-plan-your-community-take-part-in-online-activities", + "https://www.engagewr.ca/kitchener2051/host-conversation-shape-kitchener-2051-person-or-over-free-pizza", + "https://www.engagewr.ca/kitchener2051/kitchener-2051-continues-completion-technical-studies", + "https://www.engagewr.ca/kitchener2051/kitchener-2051-engagement-snapshot", + "https://www.engagewr.ca/kitchener2051/kitchener-2051-speakers-series-2", + "https://www.engagewr.ca/kitchener2051/open-call-for-applicants-kitchener-2051-community-working-group", + "https://www.engagewr.ca/kitchener2051/priorities", + "https://www.engagewr.ca/kitchener2051/prioritize-kitchener-2051s-emerging-directions-approaches-growth-update", + "https://www.engagewr.ca/kitchener2051/see-you-at-the-gaukel-block-party-this-saturday-oct-5", + "https://www.engagewr.ca/kitchener2051/speakers-series-ability-and-mobility", + "https://www.engagewr.ca/kitchener2051/speakerseries1", + "https://www.engagewr.ca/kitchener2051/thanks-to-all-who-applied", + "https://www.engagewr.ca/kitchener2051/welcome-to-kitchener-2051", + "https://www.engagewr.ca/kitchener2051cwg", + "https://www.engagewr.ca/kitchener2051cwg/forum", + "https://www.engagewr.ca/kitchener2051cwg/international-volunteer-day-december-5", + "https://www.engagewr.ca/kitchener2051cwg/november-2024-meeting", + "https://www.engagewr.ca/kitchenermarket", + "https://www.engagewr.ca/kitchenermarket/university-and-college-students-visit-our-pop-up-booth", + "https://www.engagewr.ca/kitchenermarket/what-we-heard", + "https://www.engagewr.ca/kitchenermarket2023", + "https://www.engagewr.ca/kitchenermarket2023/thank-you", + "https://www.engagewr.ca/kitchenermarket2023/what-we-heard", + "https://www.engagewr.ca/kite-flying-vs-kite-fighting", + "https://www.engagewr.ca/kite-flying-vs-kite-fighting/do-you-have-any-thoughts-kite-fighting", + "https://www.engagewr.ca/kutransition", + "https://www.engagewr.ca/kutransition/120-years-of-energy-innovation", + "https://www.engagewr.ca/kutransition/council-endorses-guiding-principles-for-kitchener-utilities-clean-energy-transition-strategy-2", + "https://www.engagewr.ca/kutransition/kitchener-utilities-takes-next-steps-to-evolve-business-model-and-develop-clean-energy-transition-strategy-2", + "https://www.engagewr.ca/kutransition/possible-pathways-for-kitchener-s-energy-future", + "https://www.engagewr.ca/kutransition/progress-ku-clean-energy-transition-continues-city-explores-possible-business-activities", + "https://www.engagewr.ca/kutransition/report-on-phase-one-to-go-to-council", + "https://www.engagewr.ca/kutransition/reports-now-available", + "https://www.engagewr.ca/kutransition/take-part-in-kitchener-utilities-clean-energy-transition", + "https://www.engagewr.ca/kutransition/the-city-s-climate-commitments", + "https://www.engagewr.ca/kw-westmount-road", + "https://www.engagewr.ca/laneway50146", + "https://www.engagewr.ca/laneway50146/letter-to-residents", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction/construction-update-may-27-2024", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction/phase-2-construction-update-may-23-to-26", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction/public-information-session-2", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction/public-information-session-3", + "https://www.engagewr.ca/langs-development", + "https://www.engagewr.ca/langs-development/city-accepts-application-for-official-plan-and-zoning-by-law-amendments", + "https://www.engagewr.ca/langs-development/project-receives-site-plan-approval-2", + "https://www.engagewr.ca/langs-development/project-update-building-permit-issued-2", + "https://www.engagewr.ca/langs-development/project-update-council-approves-project-builder", + "https://www.engagewr.ca/langs-development/project-update-fall-2024-beginning-of-construction", + "https://www.engagewr.ca/lauris", + "https://www.engagewr.ca/lauris/project-updates", + "https://www.engagewr.ca/lauris/region-of-waterloo-launches-request-for-proposal-process-for-development-partner-in-mixed-income-housing-project-at-30-lauris-av", + "https://www.engagewr.ca/lauris/two-parcels-for-sale", + "https://www.engagewr.ca/lawrenceavenue", + "https://www.engagewr.ca/lawrenceavenue/construction-begins-june-10-2024", + "https://www.engagewr.ca/lawrenceavenue/letter-to-residents", + "https://www.engagewr.ca/lawrenceavenue/project-details-and-first-open-house", + "https://www.engagewr.ca/lawrenceavenue/surface-works-notice-more-information", + "https://www.engagewr.ca/lexington-road-street-study", + "https://www.engagewr.ca/lexington-road-street-study/public-meeting", + "https://www.engagewr.ca/lexington-road-street-study/public-meeting-details", + "https://www.engagewr.ca/lexington-road-street-study/what-we-learned", + "https://www.engagewr.ca/linden-drive-playground", + "https://www.engagewr.ca/lions-canamera-spray-pad", + "https://www.engagewr.ca/lodginghouse", + "https://www.engagewr.ca/lodginghouse/council-amends-official-plan-and-zoning-by-law-to-permit-lodging-houses-city-wide-2", + "https://www.engagewr.ca/lodginghouse/council-approves-lodging-house-by-law", + "https://www.engagewr.ca/lodginghouse/lodging-house-bylaw-approved-new-short-term-rental-bylaw-coming", + "https://www.engagewr.ca/lodginghouse/report-going-to-council-june-3", + "https://www.engagewr.ca/lodginghouse/report-on-lodging-house-bylaw-goes-to-council-aug-12", + "https://www.engagewr.ca/longfellow-reconstruction", + "https://www.engagewr.ca/longfellow-reconstruction/design-options-for-feedback", + "https://www.engagewr.ca/longfellow-reconstruction/final-design", + "https://www.engagewr.ca/longfellow-reconstruction/reconstruction-design-phase", + "https://www.engagewr.ca/longfellow-reconstruction/retaining-wall-options", + "https://www.engagewr.ca/longfellow-reconstruction/retaining-wall-selection", + "https://www.engagewr.ca/longfellow-reconstruction/update-following-december-4-council-delegation", + "https://www.engagewr.ca/lowerdoon", + "https://www.engagewr.ca/lowerdoon/deadline-extended", + "https://www.engagewr.ca/lowerdoon/join-us-for-a-may-10-community-engagement-event", + "https://www.engagewr.ca/lowerdoon/join-us-oct-23-for-a-virtual-open-house", + "https://www.engagewr.ca/lowerdoon/lower-doon-land-use-changes-approved", + "https://www.engagewr.ca/lowerdoon/open-house-materials-now-available", + "https://www.engagewr.ca/mackay-crescent", + "https://www.engagewr.ca/mackay-crescent/design-options-for-potential-new-sidewalk", + "https://www.engagewr.ca/mackay-crescent/preferred-option-selected", + "https://www.engagewr.ca/mackay-crescent/trail-closure-update", + "https://www.engagewr.ca/mackay-crescent/virtual-public-information-centre-1", + "https://www.engagewr.ca/mackay-crescent/virtual-public-information-centre-2", + "https://www.engagewr.ca/mackenzieavenue", + "https://www.engagewr.ca/mackenzieavenue/introduction-letter", + "https://www.engagewr.ca/mackenzieavenue/letter-to-residents", + "https://www.engagewr.ca/mackenzieavenue/project-details", + "https://www.engagewr.ca/mackenzieavenue/stage-1-and-2-sod-placement-letter", + "https://www.engagewr.ca/mackenzieavenue/stage-1-and-stage-2-surface-works-and-driveway-access-letter", + "https://www.engagewr.ca/mackenzieavenue/updated-project-information", + "https://www.engagewr.ca/madwest-breslau-limited", + "https://www.engagewr.ca/main-street-reconstruction-design", + "https://www.engagewr.ca/maple-street-revitalization", + "https://www.engagewr.ca/maple-street-revitalization/woolwich-secures-properties-redevelopment-elmira", + "https://www.engagewr.ca/margaret-ave-park", + "https://www.engagewr.ca/margaret-ave-park/get-ready", + "https://www.engagewr.ca/margaret-ave-park/ideas-and-stories", + "https://www.engagewr.ca/margaret-ave-park/kickoff", + "https://www.engagewr.ca/margaret-ave-park/survey", + "https://www.engagewr.ca/margaret-ave-park/what-we-learned", + "https://www.engagewr.ca/maryhill-heritage-park-community-centre-playground", + "https://www.engagewr.ca/mccc", + "https://www.engagewr.ca/mccc/about-phase-1", + "https://www.engagewr.ca/mccc/business-case-approved-moving-on-to-phase-2", + "https://www.engagewr.ca/mccc/council-approves-public-art-commission-mill-courtland-community-centre", + "https://www.engagewr.ca/mccc/expansion-mill-courtland-community-centre-begins", + "https://www.engagewr.ca/mccc/join-us-sept-10-to-view-share-ideas-and-vote-on-design-concepts", + "https://www.engagewr.ca/mccc/mill-courtland-community-centre-closed-starting-july-2-2025", + "https://www.engagewr.ca/mccc/mill-courtland-community-centre-expansion-idea-boards", + "https://www.engagewr.ca/mccc/public-art-opportunity-at-mill-courtland", + "https://www.engagewr.ca/mccc/report-the-story-of-a-local-community-centre", + "https://www.engagewr.ca/mccc/share-your-thoughts-on-mccc-public-art-proposals", + "https://www.engagewr.ca/mclennan-lions", + "https://www.engagewr.ca/meadowlane-pond", + "https://www.engagewr.ca/meadowlane-pond/community-resource-group-deadline-yard-naturalization-workshop", + "https://www.engagewr.ca/meadowlane-pond/current-consultation-process-overview", + "https://www.engagewr.ca/meadowlane-pond/field-studies-in-november-2", + "https://www.engagewr.ca/meadowlane-pond/first-survey-now-open", + "https://www.engagewr.ca/meadowlane-pond/healthy-yards-webinar-series", + "https://www.engagewr.ca/meadowlane-pond/jan-2023-update-on-meadowlane-park", + "https://www.engagewr.ca/meadowlane-pond/join-us-at-the-july-16-meadowlane-park-open-house", + "https://www.engagewr.ca/meadowlane-pond/let-s-talk-stormwater-at-meadowlane-park", + "https://www.engagewr.ca/meadowlane-pond/meadowlane-construction-progressing-schedule", + "https://www.engagewr.ca/meadowlane-pond/meadowlane-park-open-house-on-november-8-2023", + "https://www.engagewr.ca/meadowlane-pond/new-frequently-asked-questions-posted", + "https://www.engagewr.ca/meadowlane-pond/newsfeed-post", + "https://www.engagewr.ca/meadowlane-pond/open-house-materials-and-final-survey", + "https://www.engagewr.ca/meadowlane-pond/open-house-today-moved-to-school-parking-lot", + "https://www.engagewr.ca/meadowlane-pond/open-house-tomorrow-rain-or-shine", + "https://www.engagewr.ca/meadowlane-pond/responding-to-hill-concerns", + "https://www.engagewr.ca/meadowlane-pond/save-date-march-25-open-house", + "https://www.engagewr.ca/meadowlane-pond/save-the-date-july-16-open-house", + "https://www.engagewr.ca/meadowlane-pond/save-the-date-november-8-2023-open-house", + "https://www.engagewr.ca/meadowlane-pond/share-your-feedback-on-the-future-design-of-meadowlane-park", + "https://www.engagewr.ca/meadowlane-pond/share-your-feedback-on-the-stormwater-measures", + "https://www.engagewr.ca/meadowlane-pond/survey-deadline-extended-to-dec-15", + "https://www.engagewr.ca/meadowlane-pond/survey-deadline-extended-to-february-12-2023", + "https://www.engagewr.ca/meadowlane-pond/two-weeks-left-to-answer-the-design-survey", + "https://www.engagewr.ca/meadowlane-pond/upgrades-meadowlane-park-begin-construction-early-july", + "https://www.engagewr.ca/meadowlane-pond/video-presentations-now-available", + "https://www.engagewr.ca/meadowlane-pond/what-s-next-for-meadowlane-park", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-about-construction-and-how-we-engaged", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-about-the-final-design-option", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-from-our-first-open-house", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-from-summer-park-drop-ins", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-from-the-meadowlane-park-survey-and-winter-park-events-2", + "https://www.engagewr.ca/meadowlane-pond/wrapping-up-field-assessment-phase", + "https://www.engagewr.ca/memories-of-galt-arena-gardens", + "https://www.engagewr.ca/merneravenue", + "https://www.engagewr.ca/merneravenue/letter-to-residents", + "https://www.engagewr.ca/mfesp-update", + "https://www.engagewr.ca/mill-race-park-pedestrian-bridges", + "https://www.engagewr.ca/millwood-carlyle-park", + "https://www.engagewr.ca/millwood-carlyle-park/carlyle-park-construction-progressing-schedule", + "https://www.engagewr.ca/millwood-carlyle-park/carlyle-park-final-design-and-construction-summer", + "https://www.engagewr.ca/millwood-carlyle-park/design-survey-closes-this-week", + "https://www.engagewr.ca/millwood-carlyle-park/healthy-yards-webinar-series", + "https://www.engagewr.ca/millwood-carlyle-park/join-us-at-an-open-house-nov-21", + "https://www.engagewr.ca/millwood-carlyle-park/millwood-and-carlyle-parks-open-house-today-share-your-feedback", + "https://www.engagewr.ca/millwood-carlyle-park/missed-the-open-house-answer-our-survey", + "https://www.engagewr.ca/millwood-carlyle-park/new-timeline-carlyle-park-playground-opening", + "https://www.engagewr.ca/millwood-carlyle-park/newsfeed-post", + "https://www.engagewr.ca/millwood-carlyle-park/one-week-until-the-open-house", + "https://www.engagewr.ca/millwood-carlyle-park/open-house-materials-available-share-your-feedback", + "https://www.engagewr.ca/millwood-carlyle-park/please-join-us-at-our-open-house-on-nov-21", + "https://www.engagewr.ca/millwood-carlyle-park/preliminary-concept-from-2016-stormwater-master-plan", + "https://www.engagewr.ca/millwood-carlyle-park/projected-expanded-to-include-carlyle-park", + "https://www.engagewr.ca/millwood-carlyle-park/save-the-date-oct-9-open-house", + "https://www.engagewr.ca/millwood-carlyle-park/stay-tuned-open-house-october-2024", + "https://www.engagewr.ca/millwood-carlyle-park/survey-now-open", + "https://www.engagewr.ca/millwood-carlyle-park/topographic-surveys-taking-place", + "https://www.engagewr.ca/millwood-carlyle-park/two-weeks-left-to-answer-the-design-survey", + "https://www.engagewr.ca/millwood-carlyle-park/what-we-heard-about-the-design-options", + "https://www.engagewr.ca/millwood-carlyle-park/what-we-heard-from-our-first-open-house", + "https://www.engagewr.ca/millwood-carlyle-park/what-we-heard-winter-2023-survey-in-millwood-park-and-carlyle-park", + "https://www.engagewr.ca/mobility-zones-around-ion-stations", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/montgomerycourts", + "https://www.engagewr.ca/montgomerycourts/feedback", + "https://www.engagewr.ca/montgomerycourts/join-us-aug-5-share-feedback-court-improvements", + "https://www.engagewr.ca/montgomerycourts/share-your-feedback-montgomery-park-courts", + "https://www.engagewr.ca/moore-avenue-south-reconstruction", + "https://www.engagewr.ca/moore-avenue-south-reconstruction-1", + "https://www.engagewr.ca/moore-avenue-south-reconstruction-1/notice-reconstruction", + "https://www.engagewr.ca/moore-avenue-south-reconstruction-1/notice-regarding-alterations-and-encroachments-city-boulevards", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/elizabeth-ziegler-school-access-during-construction-2", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/phase-2-construction-update-may-23-to-26", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/project-update-december-8-2023", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/project-update-january-8-2024", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/public-meeting", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/public-meeting-2", + "https://www.engagewr.ca/multi-use-sports-courts-churchill-and-weaver", + "https://www.engagewr.ca/myap-multi-year-accessibility-plan", + "https://www.engagewr.ca/myers-road-reconstruction", + "https://www.engagewr.ca/myers-road-reconstruction/august-2024-update", + "https://www.engagewr.ca/myers-road-reconstruction/june-2024-update", + "https://www.engagewr.ca/myers-road-reconstruction/project-updates", + "https://www.engagewr.ca/neighbourhood-bikeways", + "https://www.engagewr.ca/neighbourhood-chalk", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-cambridge-centre-kiosk", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-cambridge-farmers-market", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-david-durward-centre", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-hespeler-scout-house", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-hespeler-village-market", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-langs", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-preston-towne-market", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/office-hour-drop-ins-city-hall", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/office-hour-drop-ins-city-hall-1", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/public-meeting", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/workshop-form-based-residential-zoning", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/workshop-form-based-residential-zoning-1", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/workshop-form-based-residential-zoning-2", + "https://www.engagewr.ca/new-housing-rental-units", + "https://www.engagewr.ca/new-housing-rental-units/new-housing-rental-units-82-wilson-ave-rental-units", + "https://www.engagewr.ca/new-housing-rental-units/new-housing-rental-units-drop-in-session", + "https://www.engagewr.ca/new-park-spaces-in-northdale", + "https://www.engagewr.ca/new-website-migration", + "https://www.engagewr.ca/new-wilmot-official-plan", + "https://www.engagewr.ca/newcomer", + "https://www.engagewr.ca/newcomer/story", + "https://www.engagewr.ca/newcomer/survey", + "https://www.engagewr.ca/newcomer/what-were-hearing-emerging-themes-newcomer-engagement", + "https://www.engagewr.ca/noise-by-law-review", + "https://www.engagewr.ca/noise-bylaw-update", + "https://www.engagewr.ca/noise-bylaw-update/draft-report", + "https://www.engagewr.ca/noise-bylaw-update/summary", + "https://www.engagewr.ca/noise-bylaw-update/thanks-for-taking-our-survey", + "https://www.engagewr.ca/northfield-and-weber-h-removal", + "https://www.engagewr.ca/northfield-dr-and-weber-st-n", + "https://www.engagewr.ca/northstrasburgcreek", + "https://www.engagewr.ca/northstrasburgcreek/join-the-virtual-open-house-on-apr-4", + "https://www.engagewr.ca/northstrasburgcreek/one-week-left-to-give-your-feedback", + "https://www.engagewr.ca/northstrasburgcreek/open-house-materials-available-share-your-feedback", + "https://www.engagewr.ca/northstrasburgcreek/virtual-open-house-available-nov-29", + "https://www.engagewr.ca/northstrasburgcreek/virtual-open-house-available-today", + "https://www.engagewr.ca/northstrasburgcreek/virtual-open-house-now-available", + "https://www.engagewr.ca/northstrasburgcreek/virtual-open-house-starts-june-24-2", + "https://www.engagewr.ca/northstrasburgcreek/watch-our-presentation-and-share-your-feedback", + "https://www.engagewr.ca/nostalgia-survey", + "https://www.engagewr.ca/official-plan", + "https://www.engagewr.ca/official-plan-review", + "https://www.engagewr.ca/official-plan-review/background-reports-released-2", + "https://www.engagewr.ca/official-plan-review/charting-woolwich-s-path-forward-environmental-scan-completed-policy-directions-report-on-the-horizon", + "https://www.engagewr.ca/official-plan-review/coming-soon-establishing-a-community-vision-goals", + "https://www.engagewr.ca/official-plan-review/coming-soon-focus-group-sessions", + "https://www.engagewr.ca/official-plan-review/coming-soon-meeting-with-woolwich-seniors-association", + "https://www.engagewr.ca/official-plan-review/council-meeting-update", + "https://www.engagewr.ca/official-plan-review/council-update", + "https://www.engagewr.ca/official-plan-review/exciting-results-from-the-woolwich-official-plan-focus-group-sessions-2", + "https://www.engagewr.ca/official-plan-review/focus-group-sessions-for-stakeholders", + "https://www.engagewr.ca/official-plan-review/meeting-with-the-ontario-federation-of-agriculture", + "https://www.engagewr.ca/official-plan-review/policy-directions-report-releasing-soon", + "https://www.engagewr.ca/official-plan-review/section-26-special-council-meeting", + "https://www.engagewr.ca/official-plan-review/township-s-new-vision", + "https://www.engagewr.ca/official-plan-review/unveiling-the-new-woolwich-official-plan-cover", + "https://www.engagewr.ca/official-plan-review/we-want-to-hear-from-you", + "https://www.engagewr.ca/official-plan-review/woolwich-s-official-plan-in-final-stages-2", + "https://www.engagewr.ca/official-plan/agriculture", + "https://www.engagewr.ca/official-plan/employment", + "https://www.engagewr.ca/official-plan/growth-management", + "https://www.engagewr.ca/older-adult", + "https://www.engagewr.ca/oldmillsps", + "https://www.engagewr.ca/olympic-drive", + "https://www.engagewr.ca/olympic-drive/information-about-upcoming-surface-works", + "https://www.engagewr.ca/olympic-drive/letter-to-residents", + "https://www.engagewr.ca/olympic-drive/project-information-and-questionnaire", + "https://www.engagewr.ca/opa-27-and-westhill-district-plan-amendment", + "https://www.engagewr.ca/ottawa-street-trunk-sanitary-sewer", + "https://www.engagewr.ca/ottawa-street-trunk-sanitary-sewer/construction-begins-april-14-2025", + "https://www.engagewr.ca/ottawa-street-trunk-sanitary-sewer/extended-work-hours-ottawa-street-trunk-sanitary-sewer-construction", + "https://www.engagewr.ca/ourplanforhuron", + "https://www.engagewr.ca/ourplanforhuron/first-forum", + "https://www.engagewr.ca/ourplanforhuron/new-huron-natural-area-survey-and-walking-tour-plus-progress-updates", + "https://www.engagewr.ca/ourplanforhuron/share-your-feedback-through-our-new-self-guided-and-virtual-tours", + "https://www.engagewr.ca/ourplanforhuron/stop1", + "https://www.engagewr.ca/ourplanforhuron/stop10", + "https://www.engagewr.ca/ourplanforhuron/stop11", + "https://www.engagewr.ca/ourplanforhuron/stop2", + "https://www.engagewr.ca/ourplanforhuron/stop3", + "https://www.engagewr.ca/ourplanforhuron/stop4", + "https://www.engagewr.ca/ourplanforhuron/stop5", + "https://www.engagewr.ca/ourplanforhuron/stop6", + "https://www.engagewr.ca/ourplanforhuron/stop7", + "https://www.engagewr.ca/ourplanforhuron/stop8", + "https://www.engagewr.ca/ourplanforhuron/stop9", + "https://www.engagewr.ca/outdoor-shelter", + "https://www.engagewr.ca/outdoor-shelter/community-education-session", + "https://www.engagewr.ca/outdoor-shelter/construction-update", + "https://www.engagewr.ca/outdoor-shelter/erbs-rd-hybrid-shelter-community-meeting-may-6-2026", + "https://www.engagewr.ca/outdoor-shelter/news-and-updates", + "https://www.engagewr.ca/outdoor-shelter/one-year-evaluation-and-recommendation-report-2", + "https://www.engagewr.ca/outdoor-shelter/public-tours", + "https://www.engagewr.ca/outdoor-shelter/update-erbs-road-hybrid-shelter-may-15-2025", + "https://www.engagewr.ca/outdoor-shelter/update-on-erb-s-road-hybrid-shelter-december-11-2024", + "https://www.engagewr.ca/outdoor-shelter/update-on-erb-s-road-hybrid-shelter-october-24-2024", + "https://www.engagewr.ca/oxford-waterloo-road-bridge", + "https://www.engagewr.ca/oxford-waterloo-road-bridge/comments", + "https://www.engagewr.ca/parking", + "https://www.engagewr.ca/parking-ZBA", + "https://www.engagewr.ca/parking/open-house-delayed", + "https://www.engagewr.ca/parkland-strategy", + "https://www.engagewr.ca/parkland-strategy/comments", + "https://www.engagewr.ca/patricia-avenue-reconstruction", + "https://www.engagewr.ca/patricia-avenue-reconstruction/construction-beginning-apr-2", + "https://www.engagewr.ca/patricia-avenue-reconstruction/contractor-introduction-on-street-parking-and-pre-condition-inspection", + "https://www.engagewr.ca/patricia-avenue-reconstruction/detour-map-during-highland-rd-w-intersection-closure", + "https://www.engagewr.ca/patricia-avenue-reconstruction/detour-map-henry-sturm-trail", + "https://www.engagewr.ca/patricia-avenue-reconstruction/notice-of-intersection-work-and-closure-of-highland-rd-w-regional-road", + "https://www.engagewr.ca/patricia-avenue-reconstruction/project-details", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-1-from-henry-sturm-greenway-to-highland-road-e-surface-works-2", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-1-henry-sturm-to-highland-road-w-sod-acceptance-october-2-2023", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-1-sod-placement-on-august-3-2023", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-3-sod-placement", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-4-sod-placement", + "https://www.engagewr.ca/patricia-avenue-reconstruction/surface-works-and-driveway-access", + "https://www.engagewr.ca/patricia-avenue-reconstruction/surveyors-in-the-area", + "https://www.engagewr.ca/patricia-avenue-reconstruction/tree-management", + "https://www.engagewr.ca/paving-program", + "https://www.engagewr.ca/pedestrianfirstmarket", + "https://www.engagewr.ca/pedestrianfirstmarket/fall-2023-update", + "https://www.engagewr.ca/pedestrianfirstmarket/project-now-complete", + "https://www.engagewr.ca/pedestrianfirstmarket/updates", + "https://www.engagewr.ca/peel-street-bridge-pedestrian-conversion", + "https://www.engagewr.ca/permanent-indigenous-space", + "https://www.engagewr.ca/permanent-indigenous-space/article", + "https://www.engagewr.ca/petersburg-water-system", + "https://www.engagewr.ca/placesandspaces", + "https://www.engagewr.ca/placesandspaces/infographic-on-kitchener-splashpads-and-water-usage", + "https://www.engagewr.ca/placesandspaces/infographic-on-kitchener-sports-courts-and-sports-fields", + "https://www.engagewr.ca/placesandspaces/join-us-at-the-kitchener-2051-block-party", + "https://www.engagewr.ca/placesandspaces/kitchener-parks-public-engagement-moves-to-pet-use-sponsorship-and-use-of-alternative-spaces", + "https://www.engagewr.ca/placesandspaces/kitchener-seeks-input-to-create-more-inclusive-and-welcoming-parks", + "https://www.engagewr.ca/placesandspaces/lets-play-at-kitcheners-first-ever-downtown-park-pop-up", + "https://www.engagewr.ca/placesandspaces/may-12-places-and-spaces-report-kitchener-city-council-now-available", + "https://www.engagewr.ca/placesandspaces/new-factsheet-on-dogs-in-kitchener", + "https://www.engagewr.ca/placesandspaces/places-and-spaces-kitchener-wants-your-feedback-on-our-parks-and-open-spaces", + "https://www.engagewr.ca/placesandspaces/places-approved-kitchener-city-council", + "https://www.engagewr.ca/placesandspaces/places-report-going-council-apr-14", + "https://www.engagewr.ca/placesandspaces/report-council-rescheduled-may-12", + "https://www.engagewr.ca/placesandspaces/share-your-feedback-on-spaces", + "https://www.engagewr.ca/placesandspaces/share-your-feedback-this-may-on-our-final-topics", + "https://www.engagewr.ca/placesandspaces/share-your-ideas-and-feedback-until-jan-13", + "https://www.engagewr.ca/placesandspaces/share-your-thoughts-on-these-new-topics", + "https://www.engagewr.ca/placesandspaces/spaces-and-parkland-dedication-bylaw-update-june-28-2022", + "https://www.engagewr.ca/placesandspaces/spaces-and-parkland-dedication-update-august-24-2022", + "https://www.engagewr.ca/placesandspaces/spaces-public-consultation-virtual-webinar-may-12-2022-recording", + "https://www.engagewr.ca/placesandspaces/spaces-strategy-to-be-presented-to-council", + "https://www.engagewr.ca/placesandspaces/two-public-question", + "https://www.engagewr.ca/placesandspaces/update-and-next-steps", + "https://www.engagewr.ca/placesandspaces/update-on-spaces-strategy-and-park-dedications", + "https://www.engagewr.ca/placesandspaces/what-makes-a-great-park-places-and-spaces-engagement-phase-2-now-open", + "https://www.engagewr.ca/placesandspaces/winter-update", + "https://www.engagewr.ca/planning-applications-and-projects", + "https://www.engagewr.ca/polocorp-inc", + "https://www.engagewr.ca/posey-line-culvert-replacement", + "https://www.engagewr.ca/prime-ministers-path", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/private-tree-by-law-public-consultation", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/proposed-roundabout-at-dickie-settlement-and-roseville-road", + "https://www.engagewr.ca/proposed-roundabout-at-fischerhallman-and-new-dundee", + "https://www.engagewr.ca/prospectpark", + "https://www.engagewr.ca/prospectpark/healthy-yards-webinar-series", + "https://www.engagewr.ca/prospectpark/join-us-june-18-prospect-park-open-house", + "https://www.engagewr.ca/prospectpark/project-update", + "https://www.engagewr.ca/prospectpark/project-update-2", + "https://www.engagewr.ca/prospectpark/prospect-park-virtual-open-house-now-closed", + "https://www.engagewr.ca/prospectpark/prospect-virtual-open-house-extended-july-6-2025", + "https://www.engagewr.ca/prospectpark/thanks-for-your-questions", + "https://www.engagewr.ca/prospectpark/what-we-heard-and-next-steps", + "https://www.engagewr.ca/queen-street-w-design-assignment", + "https://www.engagewr.ca/queens-boulevard-westmount-to-belmont", + "https://www.engagewr.ca/queens-boulevard-westmount-to-belmont/letter-to-residents", + "https://www.engagewr.ca/queens-bush-road", + "https://www.engagewr.ca/queenvictoria", + "https://www.engagewr.ca/queenvictoria/city-of-kitchener-is-launching-an-initiative-to-determine-the-future-of-the-queen-victoria-statue-2", + "https://www.engagewr.ca/queenvictoria/how-we-will-engage-community-members", + "https://www.engagewr.ca/queenvictoria/key-questions-and-themes-of-ask-jay-anything-session", + "https://www.engagewr.ca/queenvictoria/kitchener-learning-from-phase-1-preparing-for-phase-2-of-queen-victoria-statue-engagement", + "https://www.engagewr.ca/queenvictoria/nov-1-ask-jay-anything-on-instagram-live", + "https://www.engagewr.ca/queenvictoria/nov-24-witnessing-circle-registration-closed", + "https://www.engagewr.ca/queenvictoria/queen-victoria-statue-community-discussion-rescheduled-for-thursday-nov-24", + "https://www.engagewr.ca/queenvictoria/registration-for-the-second-queen-victoria-statue-community-discussion-will-be-rescheduled", + "https://www.engagewr.ca/queenvictoria/report-to-council-dec-16", + "https://www.engagewr.ca/randall-drain-culvert-replacement", + "https://www.engagewr.ca/rbjschlegelpark", + "https://www.engagewr.ca/rbjschlegelpark/construction-complete-washrooms-and-courts-fully-open", + "https://www.engagewr.ca/rbjschlegelpark/courts-closed-oct-5-for-three-weeks", + "https://www.engagewr.ca/rbjschlegelpark/what-we-heard", + "https://www.engagewr.ca/recreation-programming", + "https://www.engagewr.ca/recreation-programming/let-discuss-more", + "https://www.engagewr.ca/redevelopment-of-82-wilson", + "https://www.engagewr.ca/redevelopment-of-82-wilson/construction-timeline-update", + "https://www.engagewr.ca/redevelopment-of-82-wilson/construction-update-fall-2024", + "https://www.engagewr.ca/redevelopment-of-82-wilson/demolition-of-the-existing-building", + "https://www.engagewr.ca/redevelopment-of-82-wilson/neighbourhood-meeting-on-aug-8-2022", + "https://www.engagewr.ca/redevelopment-of-82-wilson/new-affordable-seniors-rental-units-available-82-wilson-ave", + "https://www.engagewr.ca/redevelopment-of-82-wilson/tender-for-builder-awarded", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/region-of-waterloo-international-airport-ykf-master-plan-2023", + "https://www.engagewr.ca/reimaging-wellesley-arena-and-community-centre-lands", + "https://www.engagewr.ca/reimaging-wellesley-arena-and-community-centre-lands/let-us-know-what-youre-thinking", + "https://www.engagewr.ca/rental-housing-incentive", + "https://www.engagewr.ca/rental-housing-incentive/rental-housing-incentive-brochure", + "https://www.engagewr.ca/review-of-adult-entertainment-bylaws", + "https://www.engagewr.ca/review-of-adult-entertainment-bylaws/project-delayed-indefinitely", + "https://www.engagewr.ca/riverland-area-ii-gp-ltd-riverland-area-2-phase-5-breslau", + "https://www.engagewr.ca/road-construction", + "https://www.engagewr.ca/roadreconstruction", + "https://www.engagewr.ca/roadreconstruction/2022-completed-projects", + "https://www.engagewr.ca/roadreconstruction/2023-completed-projects", + "https://www.engagewr.ca/roadreconstruction/completed-projects-2024", + "https://www.engagewr.ca/roadside-tree-planting", + "https://www.engagewr.ca/rockway", + "https://www.engagewr.ca/rockway-fairway", + "https://www.engagewr.ca/rockway/criteria-new-older-adult-facility-approved-council", + "https://www.engagewr.ca/rockway/how-to-get-involved", + "https://www.engagewr.ca/rockway/thank-you-for-taking-part", + "https://www.engagewr.ca/rockway/what-we-heard", + "https://www.engagewr.ca/rosemount-islington-sherwood", + "https://www.engagewr.ca/rosemount-islington-sherwood/introduction-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/letter-to-residents", + "https://www.engagewr.ca/rosemount-islington-sherwood/project-information-and-first-public-engagement", + "https://www.engagewr.ca/rosemount-islington-sherwood/reconnection-letter-2024-construction", + "https://www.engagewr.ca/rosemount-islington-sherwood/sherwood-avenue-krug-to-suffolk-stage-3-sod-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/sherwood-islington-and-rosemount-stage-1-sod-placement", + "https://www.engagewr.ca/rosemount-islington-sherwood/sod-placement-notice", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-1-sod-acceptance-letter-2", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-2-acceptance-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-2-sod-placement-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-2-surface-works-and-driveway-access-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-3-surface-works-and-driveway-access-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-5-road-reconstruction-of-islington-avenue", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-5-sod-care-now-shifts-property-owners-islington-avenue", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-5-sod-placement-notice", + "https://www.engagewr.ca/rosemount-islington-sherwood/surface-works-and-driveway-access-sherwood-islington-and-rosemount-reconstruction-stage-1", + "https://www.engagewr.ca/roseville-road-edworthy-side-road-roundabout", + "https://www.engagewr.ca/rossfordcrescent", + "https://www.engagewr.ca/rossfordcrescent/cold-weather-temporary-water-supply", + "https://www.engagewr.ca/rossfordcrescent/contractor-intro-and-pre-condition-survey-information", + "https://www.engagewr.ca/rossfordcrescent/letter-to-residents", + "https://www.engagewr.ca/rossfordcrescent/rossford-stage-1", + "https://www.engagewr.ca/rossfordcrescent/stage-1-construction-rossford-south-leg-markwood-to-gzowski-park-entrance-scheduled-to-start-week-of-july-4-2022", + "https://www.engagewr.ca/rossfordcrescent/update-on-project-status-for-phase-2", + "https://www.engagewr.ca/rossfordcrescent/update-on-project-status-for-stage-1", + "https://www.engagewr.ca/rossfordcrescent/update-on-project-status-for-stage-1-2", + "https://www.engagewr.ca/roundabout-safety", + "https://www.engagewr.ca/rowlibraryreview", + "https://www.engagewr.ca/roy-schmidt-rd-and-conservation-dr", + "https://www.engagewr.ca/rusholme-road-westmount-road-dunbar-road", + "https://www.engagewr.ca/rusholme-road-westmount-road-dunbar-road/surveyors-neighbourhood", + "https://www.engagewr.ca/sanitary-master-plan", + "https://www.engagewr.ca/sanitary-master-plan/notice-of-completion-environmental-assessment-study", + "https://www.engagewr.ca/sanitary-master-plan/notice-of-online-public-consultation-centre", + "https://www.engagewr.ca/sanitary-master-plan/notice-of-public-consultation-centre", + "https://www.engagewr.ca/sanitary-master-plan/notice-of-study-commencement", + "https://www.engagewr.ca/sanitary-master-plan/sanitary-master-plan-complete", + "https://www.engagewr.ca/sanitarymasterplan", + "https://www.engagewr.ca/sanitarymasterplan/city-of-kitchener-approves-integrated-sanitary-master-plan-asks-residents-to-do-their-part-to-keep-our-pipes-clear-2", + "https://www.engagewr.ca/sanitarymasterplan/integrated-sanitary-master-plan-complete", + "https://www.engagewr.ca/sanitarymasterplan/integrated-sanitary-master-plan-virtual-public-information-centre-will-start-on-december-6-2023", + "https://www.engagewr.ca/sanitarymasterplan/join-the-virtual-public-information-centre-2-city-of-kitchener-integrated-master-plan-starting-today", + "https://www.engagewr.ca/sanitarymasterplan/notice-of-study-commencement-integrated-sanitary-master-plan", + "https://www.engagewr.ca/sanitarymasterplan/notice-of-virtual-public-information-centre-1-city-of-kitchener-integrated-sanitary-master-plan", + "https://www.engagewr.ca/sanitarymasterplan/reformatted-virtual-public-information-centre", + "https://www.engagewr.ca/sanitarymasterplan/summary-report-for-first-pic-now-available", + "https://www.engagewr.ca/sanitarymasterplan/summary-report-for-second-pic-now-available", + "https://www.engagewr.ca/sanitarymasterplan/virtual-public-information-centre-1", + "https://www.engagewr.ca/sanitarymasterplan/virtual-public-information-centre-2", + "https://www.engagewr.ca/sawmill-road-and-ebycrest-road", + "https://www.engagewr.ca/schaefer-reconstruction", + "https://www.engagewr.ca/schaefer-reconstruction-1", + "https://www.engagewr.ca/schaefer-reconstruction-1/project-information", + "https://www.engagewr.ca/schaefer-reconstruction/project-information", + "https://www.engagewr.ca/scheifele-bridge-superstructure-replacement", + "https://www.engagewr.ca/scheifele-bridge-superstructure-replacement/november-2023-update", + "https://www.engagewr.ca/schlegel-urban-developments-corp", + "https://www.engagewr.ca/schlegel-urban-developments-corp-1", + "https://www.engagewr.ca/schneider-creek-path", + "https://www.engagewr.ca/schneider-creek-path/engagement-period-extended", + "https://www.engagewr.ca/schneidercreekea", + "https://www.engagewr.ca/schneidercreekea/first-public-information-centre-materials-now-available", + "https://www.engagewr.ca/schneidercreekea/first-public-information-centre-tomorrow", + "https://www.engagewr.ca/schneidercreekea/frequently-asked-questions-posted", + "https://www.engagewr.ca/schneidercreekea/notice-of-commencement-and-public-information-centre", + "https://www.engagewr.ca/schneidercreekea/notice-of-completion", + "https://www.engagewr.ca/schneidercreekea/project-update-from-the-second-public-information-centre-2", + "https://www.engagewr.ca/schneidercreekea/share-your-feedback-until-jan-1-2024", + "https://www.engagewr.ca/schneidercreekea/tell-us-what-you-think", + "https://www.engagewr.ca/schneidercreekea/upcoming-public-information-centre", + "https://www.engagewr.ca/schneidercreekea/upcoming-public-information-centre-3", + "https://www.engagewr.ca/schneidercreekea/what-we-heard-at-the-third-public-information-centre", + "https://www.engagewr.ca/schneidershoemakercreeks", + "https://www.engagewr.ca/schneidershoemakercreeks/design-presentation-materials-delayed-to-dec-2", + "https://www.engagewr.ca/schneidershoemakercreeks/presentation-now-available", + "https://www.engagewr.ca/schneidershoemakercreeks/schneider-creek-and-shoemaker-creek-design-presentation-available-on-november-25", + "https://www.engagewr.ca/schneidershoemakercreeks/soil-and-groundwater-testing-this-fall", + "https://www.engagewr.ca/schneidershoemakercreeks/technical-difficulties-design-presentation-delayed", + "https://www.engagewr.ca/search", + "https://www.engagewr.ca/secondavenue", + "https://www.engagewr.ca/secondavenue/construction-postponed-to-2023", + "https://www.engagewr.ca/secondavenue/final-project-design-details-2", + "https://www.engagewr.ca/secondavenue/introduction-and-precondition-survey", + "https://www.engagewr.ca/secondavenue/letter-to-residents", + "https://www.engagewr.ca/secondavenue/second-avenue-driveway-access-concrete-works", + "https://www.engagewr.ca/secondavenue/second-avenue-stage-one-sod-end-of-warranty-letter", + "https://www.engagewr.ca/secondavenue/second-avenue-stage-two-sod-end-of-warranty-letter", + "https://www.engagewr.ca/secondavenue/second-avenue-stage-two-sod-start-of-warranty-letter", + "https://www.engagewr.ca/secondavenue/sod-start-of-warranty-stage-one", + "https://www.engagewr.ca/sewer-use-bylaw-update", + "https://www.engagewr.ca/shakespeare-drive-reconstruction", + "https://www.engagewr.ca/shakespeare-drive-reconstruction/notice-reconstruction", + "https://www.engagewr.ca/shared-micromobility-program", + "https://www.engagewr.ca/shoemakergreenway", + "https://www.engagewr.ca/shoemakergreenway/construction-starting-soon-at-shoemaker-greenway-park", + "https://www.engagewr.ca/shoemakergreenway/forum", + "https://www.engagewr.ca/shoemakergreenway/now-available-information-session-recording", + "https://www.engagewr.ca/shoemakergreenway/previous-page-content-fall-2021", + "https://www.engagewr.ca/shoemakergreenway/previous-page-content-summer-2021", + "https://www.engagewr.ca/shoemakergreenway/shoemaker-greenway-park-phase-2-engagement-summary", + "https://www.engagewr.ca/shoemakergreenway/update-on-shoemaker-greenway", + "https://www.engagewr.ca/shorttermrentals", + "https://www.engagewr.ca/shorttermrentals/council-decides-against-licensing-short-term-rentals", + "https://www.engagewr.ca/shorttermrentals/short-term-rental-bylaw-report-goes-council-june-2", + "https://www.engagewr.ca/sidewalkdesigns", + "https://www.engagewr.ca/snowplow", + "https://www.engagewr.ca/snowplow/announcing-the-winning-names", + "https://www.engagewr.ca/snowplow/help-us-name-our-snow-plows-for-next-winter", + "https://www.engagewr.ca/snowplow/public-works-week", + "https://www.engagewr.ca/snowplow/voting-now-open", + "https://www.engagewr.ca/snowplow2024", + "https://www.engagewr.ca/snowplow2024/meet-the-plows-on-may-23", + "https://www.engagewr.ca/snowplow2024/voting-open-until-mar-4", + "https://www.engagewr.ca/snowplow2024/winning-names-announced", + "https://www.engagewr.ca/snyder-s-road-waterloo-street-nafziger-road-roundabout", + "https://www.engagewr.ca/snyders-road-west-and-foundry-street-reconstruction", + "https://www.engagewr.ca/snyders-road-west-and-foundry-street-reconstruction/snydersrd-update", + "https://www.engagewr.ca/soler", + "https://www.engagewr.ca/soperpark", + "https://www.engagewr.ca/southdaleavenue", + "https://www.engagewr.ca/southdaleavenue/city-acceptance-of-sod", + "https://www.engagewr.ca/southdaleavenue/contractor-intro", + "https://www.engagewr.ca/southdaleavenue/contractor-introduction", + "https://www.engagewr.ca/southdaleavenue/letter-to-residents", + "https://www.engagewr.ca/southdaleavenue/sod-placement-on-may-10-2023", + "https://www.engagewr.ca/southdaleavenue/surface-works", + "https://www.engagewr.ca/southdaleavenue/update-on-project-status-december-2022", + "https://www.engagewr.ca/spadina-road-west-patricia-avenue-belmont-avenue-west", + "https://www.engagewr.ca/spadina-road-west-patricia-avenue-belmont-avenue-west/surveyors-area", + "https://www.engagewr.ca/speed-management", + "https://www.engagewr.ca/speed-management/approved-30km-speed-limit-for-residential-streets", + "https://www.engagewr.ca/speed-management/approved-speed-management-plan", + "https://www.engagewr.ca/speed-management/estimated-travel-time", + "https://www.engagewr.ca/speed-management/project-background", + "https://www.engagewr.ca/speed-management/proposed-30-kmh-implementation-plan", + "https://www.engagewr.ca/speed-management/speed-limit-options", + "https://www.engagewr.ca/sportsparades", + "https://www.engagewr.ca/sportsparades/how-to-share-your-feedback-and-ideas", + "https://www.engagewr.ca/sportsparades/moving-forward-sports-parades-history", + "https://www.engagewr.ca/sportsparades/sports-parades-history-what-we-heard", + "https://www.engagewr.ca/st-george-street", + "https://www.engagewr.ca/st-george-street/construction-begins-sept-16-2024", + "https://www.engagewr.ca/st-george-street/letter-to-residents", + "https://www.engagewr.ca/st-george-street/sod-acceptance-notice", + "https://www.engagewr.ca/st-george-street/sod-placement", + "https://www.engagewr.ca/st-george-street/surface-works-notice-nov-7-to-8", + "https://www.engagewr.ca/st-moritz-park", + "https://www.engagewr.ca/st-moritz-park/earth-day-kickoff", + "https://www.engagewr.ca/st-moritz-park/get-ready", + "https://www.engagewr.ca/st-moritz-park/ideas", + "https://www.engagewr.ca/st-moritz-park/survey", + "https://www.engagewr.ca/st-moritz-park/what-we-learned", + "https://www.engagewr.ca/station-area-mixed-use-employment-zone", + "https://www.engagewr.ca/stirling-and-courtland-culvert", + "https://www.engagewr.ca/stirling-and-courtland-culvert/construction-extended-to-december-2023", + "https://www.engagewr.ca/stirling-and-courtland-culvert/contractor-introduction-and-project-start-details", + "https://www.engagewr.ca/stirling-and-courtland-culvert/update-on-bridge-rehabilitation-project", + "https://www.engagewr.ca/stirling-avenue-south", + "https://www.engagewr.ca/stirling-avenue-south/letter-to-residents", + "https://www.engagewr.ca/stirling-avenue-south/questionnaire-now-open", + "https://www.engagewr.ca/stirlingavenuesouth", + "https://www.engagewr.ca/stirlingavenuesouth/letter-to-residents", + "https://www.engagewr.ca/stirlingavenuesouth/stirling-and-homer-watson-is-now-open", + "https://www.engagewr.ca/stjacobswastewater", + "https://www.engagewr.ca/stjacobswastewater/stjacobs-WWTP-public-meeting-1", + "https://www.engagewr.ca/strasburg-new-dundee-road-roundabout", + "https://www.engagewr.ca/strategic-plan-wilmot", + "https://www.engagewr.ca/survivor-garden", + "https://www.engagewr.ca/sydneyavenue", + "https://www.engagewr.ca/sydneyavenue/contractor-introduction-parking-and-pre-condition-inspection", + "https://www.engagewr.ca/sydneyavenue/letter-to-residents", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-reconnection-letter", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-reconnection-letter-2", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-stage-one-end-of-warranty-letter", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-stage-two-sod-start-of-warranty-letter", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-start-of-sod-warranty-stage-one", + "https://www.engagewr.ca/taxi-bylaw-review", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/trac", + "https://www.engagewr.ca/trac/participation-in-trac-meetings", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/transportation-and-mobility-master-plan", + "https://www.engagewr.ca/trillium-valley-park-pond-48", + "https://www.engagewr.ca/trillium-valley-park-pond-48/construction-update", + "https://www.engagewr.ca/trussler-road", + "https://www.engagewr.ca/udm-refresh", + "https://www.engagewr.ca/udm-refresh/amendments-adopted", + "https://www.engagewr.ca/union-reconstruction", + "https://www.engagewr.ca/union-reconstruction/additional-project-questions-and-answers", + "https://www.engagewr.ca/union-reconstruction/construction-planning-update", + "https://www.engagewr.ca/union-reconstruction/delay-to-start-of-construction", + "https://www.engagewr.ca/union-reconstruction/design-alternatives-for-union-street-east-reconstruction", + "https://www.engagewr.ca/union-reconstruction/july-2023-project-update", + "https://www.engagewr.ca/union-reconstruction/new-union-street-design-update", + "https://www.engagewr.ca/union-reconstruction/project-update-march-1-2024", + "https://www.engagewr.ca/union-reconstruction/project-update-may-2025", + "https://www.engagewr.ca/victoria-boullee-reconstruction", + "https://www.engagewr.ca/victoria-boullee-reconstruction/boullee-st-closure", + "https://www.engagewr.ca/victoria-street-improvements-kitchener", + "https://www.engagewr.ca/victoria-street-improvements-kitchener/construction-start-july-16-2025", + "https://www.engagewr.ca/victoria-street-modifications", + "https://www.engagewr.ca/victoriaparkmp", + "https://www.engagewr.ca/victoriaparkmp/did-we-miss-anything", + "https://www.engagewr.ca/victoriaparkmp/help-shape-future-victoria-park", + "https://www.engagewr.ca/victoriaparkmp/how-we-will-develop-the-master-plan-2", + "https://www.engagewr.ca/victoriaparkmp/map", + "https://www.engagewr.ca/victoriaparkmp/new-innovative-technology-helps-guide-the-future-of-victoria-park-2", + "https://www.engagewr.ca/victoriaparkmp/new-topic-feedback-thank-you-event-august-30", + "https://www.engagewr.ca/victoriaparkmp/phase-2-engagement-update", + "https://www.engagewr.ca/victoriaparkmp/sensors-in-victoria-park", + "https://www.engagewr.ca/victoriaparkmp/story", + "https://www.engagewr.ca/victoriaparkmp/usersurvey", + "https://www.engagewr.ca/visionzero", + "https://www.engagewr.ca/visionzero/2024-hot-spot-improvements", + "https://www.engagewr.ca/visionzero/city-s-vision-zero-strategy-succeeding-in-creating-safer-streets", + "https://www.engagewr.ca/visionzero/city-seeks-feedback-on-plans-to-increase-road-safety", + "https://www.engagewr.ca/visionzero/draft-vision-zero-strategy-to-go-to-council-dec-6", + "https://www.engagewr.ca/visionzero/kitchener-council-approves-a-new-vision-for-safer-streets", + "https://www.engagewr.ca/visionzero/kitchener-launches-vision-zero-street-safety-education-campaign", + "https://www.engagewr.ca/visionzero/kitchener-makes-progress-towards-vision-zero-goal", + "https://www.engagewr.ca/visionzero/kitcheners-streets-are-slower-safer-vision-zero-work-continues", + "https://www.engagewr.ca/visionzero/new-vision-zero-dashboard-and-ask-us-a-question", + "https://www.engagewr.ca/visionzero/share-your-driving-and-street-safety-tips", + "https://www.engagewr.ca/visionzero/traffic-collisions-are-not-accidents", + "https://www.engagewr.ca/visionzero/vision-zero-survey-launches", + "https://www.engagewr.ca/voisinbordencreeks", + "https://www.engagewr.ca/voisinbordencreeks/creek-restoration-and-tree-removals", + "https://www.engagewr.ca/voisinbordencreeks/join-the-smart-yards-walking-tour-at-the-open-house", + "https://www.engagewr.ca/voisinbordencreeks/open-house-materials-available-share-your-feedback", + "https://www.engagewr.ca/voisinbordencreeks/please-join-us-at-our-open-house-on-may-22", + "https://www.engagewr.ca/voisinbordencreeks/what-we-heard-about-the-design-options", + "https://www.engagewr.ca/ward2parknetwork", + "https://www.engagewr.ca/ward2parknetwork/city-of-kitchener-looking-for-feedback-on-a-parks-network-in-idlewood-area", + "https://www.engagewr.ca/ward2parknetwork/construction-complete-opening-celebration-sept-27", + "https://www.engagewr.ca/ward2parknetwork/final-park-concepts-open-house-scheduled-december-13th", + "https://www.engagewr.ca/ward2parknetwork/final-park-designs-and-open-house-presentation-boards", + "https://www.engagewr.ca/ward2parknetwork/kinzie-and-oaten-parks-open-construction-on-idlewood-starts-mid-july", + "https://www.engagewr.ca/ward2parknetwork/kinzie-park-playground-is-moving-to-the-other-side", + "https://www.engagewr.ca/ward2parknetwork/oaten-park-construction-update", + "https://www.engagewr.ca/ward2parknetwork/project-update", + "https://www.engagewr.ca/ward2parknetwork/project-update-construction-to-begin-at-oaten-park", + "https://www.engagewr.ca/ward2parknetwork/reaching-out-for-final-thoughts", + "https://www.engagewr.ca/ward2parknetwork/second-consultation-open-for-idlewood-kinzie-oaten-park-network", + "https://www.engagewr.ca/ward2parknetwork/summer-2024-update", + "https://www.engagewr.ca/ward2parknetwork/video-of-park-designs-now-available", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/waterloo-budget-2024-2026", + "https://www.engagewr.ca/waterloo-budget-2024-2026/budget-community-engagement-update", + "https://www.engagewr.ca/waterloo-budget-2024-2026/budget-pressures-and-opportunities", + "https://www.engagewr.ca/waterloo-budget-2024-2026/city-of-waterloo-budget-day-is-monday-february-12-2024", + "https://www.engagewr.ca/waterloo-budget-2024-2026/efficiencies-and-improvements", + "https://www.engagewr.ca/waterloo-budget-2024-2026/faq-why-can-t-the-city-keep-tax-increases-to-the-rate-of-inflation", + "https://www.engagewr.ca/waterloo-budget-2024-2026/fire-prevention-education-and-response-for-community-safety", + "https://www.engagewr.ca/waterloo-budget-2024-2026/how-the-budget-works", + "https://www.engagewr.ca/waterloo-budget-2024-2026/investing-in-active-transportation-infrastructure", + "https://www.engagewr.ca/waterloo-budget-2024-2026/minimizing-the-financial-impact", + "https://www.engagewr.ca/waterloo-budget-2024-2026/more-sidewalk-clearing-to-improve-winter-mobility-for-everyone", + "https://www.engagewr.ca/waterloo-budget-2024-2026/planning-for-affordable-housing", + "https://www.engagewr.ca/waterloo-budget-2024-2026/strategic-stories", + "https://www.engagewr.ca/waterloo-budget-2024-2026/transforming-our-facilities-for-net-zero", + "https://www.engagewr.ca/waterloo-budget-2024-2026/transitioning-from-web-content-to-digital-service", + "https://www.engagewr.ca/waterloo-haf-initiative-1", + "https://www.engagewr.ca/waterloo-haf-initiative-1/city-is", + "https://www.engagewr.ca/waterloo-haf-initiative-1/city-owned-lands-for-affordable-housing", + "https://www.engagewr.ca/waterloo-haf-initiative-1/city-waterloo-finalizes-land-transfer-habitat-humanitybuild-now-one-canadas-largest-affordable-housing-projects", + "https://www.engagewr.ca/waterloo-haf-initiative-1/community-feedback-and-next-steps", + "https://www.engagewr.ca/waterloo-haf-initiative-1/council-identifies-habitat-for-humanity-build-now-as-preferred-candidate-for-the-affordable-and-attainable-housing-development-a", + "https://www.engagewr.ca/waterloo-haf-initiative-1/mzo-has-been-posted", + "https://www.engagewr.ca/waterloo-haf-initiative-1/public-meeting-2", + "https://www.engagewr.ca/waterloo-haf-initiative-1/request-for-a-minister-s-zoning-order-at-2025-university-avenue-east-is-granted", + "https://www.engagewr.ca/waterloo-haf-initiative-2", + "https://www.engagewr.ca/waterloo-haf-initiative-2/city-updated-official-plan-and-zoning-law", + "https://www.engagewr.ca/waterloo-haf-initiative-3", + "https://www.engagewr.ca/waterloo-haf-initiative-3/council-have-directed-next-steps", + "https://www.engagewr.ca/waterloo-haf-initiative-3/gsp-group-retained-prepare-medium-rise-plan-sugarbush-south", + "https://www.engagewr.ca/waterloo-haf-initiative-3/july-18-virtual-neighbourhood-meeting-2", + "https://www.engagewr.ca/waterloo-haf-initiative-3/meeting-august-15-2024", + "https://www.engagewr.ca/waterloo-haf-initiative-4", + "https://www.engagewr.ca/waterloo-haf-initiative-5", + "https://www.engagewr.ca/waterloo-haf-initiative-6", + "https://www.engagewr.ca/waterloo-haf-initiative-6/additional-residential-unit-grant-program-goes-council", + "https://www.engagewr.ca/waterloo-haf-initiative-6/enable-four-units-and-four-storeys-low-density-residential-properties", + "https://www.engagewr.ca/waterloo-haf-initiative-7", + "https://www.engagewr.ca/waterloo-haf-initiative-7/august-7-public-engagement-session", + "https://www.engagewr.ca/waterloo-haf-initiative-7/official-plan-policies-approved", + "https://www.engagewr.ca/waterloo-haf-initiative-7/presentation-and-video-recording-january-22-public-engagement-session", + "https://www.engagewr.ca/waterloo-haf-initiative-7/presentation-and-video-recording-july-22-public-engagement-session-are-available", + "https://www.engagewr.ca/waterloo-haf-initiative-7/project-update-dec-19-2024", + "https://www.engagewr.ca/waterloo-haf-initiative-7/public-engagement-summary", + "https://www.engagewr.ca/waterloo-haf-initiative-7/public-information-session", + "https://www.engagewr.ca/waterloo-haf-initiative-7/second-drafts-released", + "https://www.engagewr.ca/waterloo-haf-initiative-8", + "https://www.engagewr.ca/waterloo-haf-initiative-8/council-approves-city-staffs-intention-grant-additional-parking-reductions-affordable-housing-provider", + "https://www.engagewr.ca/waterloo-haf-initiative-8/informal-public-meeting-june-23-2025", + "https://www.engagewr.ca/waterloo-heritage-register-review", + "https://www.engagewr.ca/waterloo-heritage-register-review/council-supports-5-notices-intention-designate", + "https://www.engagewr.ca/waterloo-heritage-register-review/public-meeting-scheduled-monday-february-24-2025", + "https://www.engagewr.ca/waterloo-improvement-plan", + "https://www.engagewr.ca/waterloo-improvement-plan/survey", + "https://www.engagewr.ca/waterloo-official-plan", + "https://www.engagewr.ca/waterloo-official-plan/beechwood-park-cultural-heritage-landscape-review", + "https://www.engagewr.ca/waterloo-official-plan/city-growth-structure-and-form", + "https://www.engagewr.ca/waterloo-official-plan/commercial-and-employment-policy-study-review-draft-summary-report", + "https://www.engagewr.ca/waterloo-official-plan/draft-updated-official-plan-june-2024", + "https://www.engagewr.ca/waterloo-official-plan/economic-development-and-innovation", + "https://www.engagewr.ca/waterloo-official-plan/environment-and-climate-change", + "https://www.engagewr.ca/waterloo-official-plan/housing-affordability-and-equity", + "https://www.engagewr.ca/waterloo-official-plan/neighbourhoods-communities-and-culture", + "https://www.engagewr.ca/waterloo-official-plan/notice-public-open-house-and-public-meeting", + "https://www.engagewr.ca/waterloo-official-plan/official-plan-amendment-58-posted-environmental-registry-ontario", + "https://www.engagewr.ca/waterloo-official-plan/official-plan-issue-briefs", + "https://www.engagewr.ca/waterloo-official-plan/official-plan-review-library-pop-up-sessions", + "https://www.engagewr.ca/waterloo-official-plan/opa-58-official-plan-review-phase-1-adopted-by-city-council-2", + "https://www.engagewr.ca/waterloo-official-plan/planning-processes-and-public-consultation", + "https://www.engagewr.ca/waterloo-official-plan/public-open-house-june-17-2021", + "https://www.engagewr.ca/waterloo-official-plan/retail-habits-survey", + "https://www.engagewr.ca/waterloo-official-plan/special-public-meeting-for-official-plan-review", + "https://www.engagewr.ca/waterloo-official-plan/transportation-and-mobility", + "https://www.engagewr.ca/waterloo-official-plan/understanding-planning-in-waterloo", + "https://www.engagewr.ca/waterloo-official-plan/updated-official-plan-review-phase-1-official-plan-amendment-58", + "https://www.engagewr.ca/waterloo-official-plan/vision-and-strategic-plan", + "https://www.engagewr.ca/waterloo-park", + "https://www.engagewr.ca/waterloo-park-circuit", + "https://www.engagewr.ca/waterloo-park-circuit/council-approves-phase-1", + "https://www.engagewr.ca/waterloo-park-circuit/join-the-conversation", + "https://www.engagewr.ca/waterloo-park-circuit/open-house-info", + "https://www.engagewr.ca/waterloo-park/colouring", + "https://www.engagewr.ca/waterloo-park/previous-plan", + "https://www.engagewr.ca/waterloo-rental", + "https://www.engagewr.ca/waterloo-rental/bylaw-updated", + "https://www.engagewr.ca/waterloo-rental/proposed-rental-apartment-bylaw", + "https://www.engagewr.ca/waterloo-rental/short-term-rentals-info-session", + "https://www.engagewr.ca/waterloo-rental/survey-closed", + "https://www.engagewr.ca/waterloo-rental/thank-you-for-sharing-your-feedback-with-us", + "https://www.engagewr.ca/waterloo-rental/what-we-learned", + "https://www.engagewr.ca/waterloo-rental/what-we-learned-and-next-steps", + "https://www.engagewr.ca/waterloo-st-reconstruction", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-1", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-2", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-3", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-4", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-5", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-6", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-7", + "https://www.engagewr.ca/waterloo-st-reconstruction/landscape-encroachments-on-city-boulevards", + "https://www.engagewr.ca/waterloo-st-reconstruction/leaf-collection", + "https://www.engagewr.ca/waterloo-st-reconstruction/loose-leaf-collection", + "https://www.engagewr.ca/waterloo-st-reconstruction/notice-regarding-preservation-of-on-street-parking-on-waterloo-street-after-reconstruction", + "https://www.engagewr.ca/waterloo-st-reconstruction/notice-regarding-the-removal-of-on-street-parking-from-waterloo-street-following-construction", + "https://www.engagewr.ca/waterloo-st-reconstruction/phase-2-construction-update-may-23-to-26", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-december-15-2023", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-december-8-2023", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-delayed-start-of-construction", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-delayed-start-of-construction-2", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-for-may-31-2024", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-for-may-6-2024", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-march-15-2024", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-tree-removal-and-pruning", + "https://www.engagewr.ca/waterloo-st-reconstruction/public-meeting", + "https://www.engagewr.ca/waterloo/development-planning", + "https://www.engagewr.ca/waterloocycling", + "https://www.engagewr.ca/waterloohafactions", + "https://www.engagewr.ca/watersupply", + "https://www.engagewr.ca/wateryoungproject", + "https://www.engagewr.ca/wayfinding", + "https://www.engagewr.ca/wayfinding/how-to-get-involved", + "https://www.engagewr.ca/wayfinding/what-we-heard-about-wayfinding-and-branding-walking-cycling-and-rolling", + "https://www.engagewr.ca/wbtrail", + "https://www.engagewr.ca/weigel-SWM-Pond", + "https://www.engagewr.ca/weigel-drain-headwall-project", + "https://www.engagewr.ca/wellesleywater", + "https://www.engagewr.ca/west-montrose", + "https://www.engagewr.ca/west-montrose/construction-starting-august-11", + "https://www.engagewr.ca/west-montrose/project-update-august-2024", + "https://www.engagewr.ca/westheightspark", + "https://www.engagewr.ca/westheightspark/join-us-at-a-community-workshop-on-nov-26", + "https://www.engagewr.ca/westheightspark/join-us-june-3-community-walk-and-talk-westheights-park", + "https://www.engagewr.ca/westheightspark/workshop-june-5-learn-more-and-share-your-vision", + "https://www.engagewr.ca/westheightspark/workshop-materials-now-available-comment-until-july-19", + "https://www.engagewr.ca/westhill", + "https://www.engagewr.ca/westhill/project-updates", + "https://www.engagewr.ca/westwood-drive", + "https://www.engagewr.ca/westwood-drive/letter-to-residents", + "https://www.engagewr.ca/westwood-drive/public-information-and-questionnaire", + "https://www.engagewr.ca/westwoodpark", + "https://www.engagewr.ca/westwoodpark/construction-delayed-2", + "https://www.engagewr.ca/westwoodpark/construction-start", + "https://www.engagewr.ca/westwoodpark/new-frequently-asked-questions", + "https://www.engagewr.ca/westwoodpark/new-pet-waste-containers", + "https://www.engagewr.ca/westwoodpark/new-time-sept-19-park-opening-celebration-at-4-p-m", + "https://www.engagewr.ca/westwoodpark/next-steps-hydroseeding-and-planting", + "https://www.engagewr.ca/westwoodpark/online-forum", + "https://www.engagewr.ca/westwoodpark/phase-2-construction-2", + "https://www.engagewr.ca/westwoodpark/phase-2-construction-work-is-now-underway", + "https://www.engagewr.ca/westwoodpark/playground-now-open", + "https://www.engagewr.ca/westwoodpark/previous-page-content-summer-2021", + "https://www.engagewr.ca/westwoodpark/save-the-date-sept-19", + "https://www.engagewr.ca/westwoodpark/second-phase-of-construction-begins-in-june", + "https://www.engagewr.ca/westwoodpark/update-on-phase-1", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park-2", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park-3", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park-4", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park-construction", + "https://www.engagewr.ca/westwoodpark/watch-construction-progress", + "https://www.engagewr.ca/westwoodpark/westwood-park-construction-complete", + "https://www.engagewr.ca/westwoodpark/westwood-park-construction-progressing-on-schedule", + "https://www.engagewr.ca/white-elm-park", + "https://www.engagewr.ca/white-elm-park/construction-complete", + "https://www.engagewr.ca/white-elm-park/construction-starting-soon", + "https://www.engagewr.ca/white-elm-park/survey-closed", + "https://www.engagewr.ca/white-elm-park/vote-on-your-favourite-playground-design", + "https://www.engagewr.ca/white-elm-park/what-we-heard-about-the-white-elm-playground", + "https://www.engagewr.ca/white-elm-park/winning-playground-design", + "https://www.engagewr.ca/wilfred-and-prospect", + "https://www.engagewr.ca/wilfred-and-prospect/letter-to-residents", + "https://www.engagewr.ca/wilfred-and-prospect/questionnaire-now-open", + "https://www.engagewr.ca/wilmot-citizen-of-the-year-2025", + "https://www.engagewr.ca/wilsonavenue", + "https://www.engagewr.ca/wilsonavenue/construction-introduction-letter", + "https://www.engagewr.ca/wilsonavenue/newspost", + "https://www.engagewr.ca/wilsonavenue/public-information-and-questionnaire-2", + "https://www.engagewr.ca/wilsonavenue/stage-3a-surface-works-begin-nov-2024", + "https://www.engagewr.ca/wilsonavenue/surface-works-begin-sept-30-2024", + "https://www.engagewr.ca/wilsonvaniertraynor", + "https://www.engagewr.ca/wilsonvaniertraynor/april-20-construction-in-vanier-park", + "https://www.engagewr.ca/wilsonvaniertraynor/construction-at-vanier-and-traynor-parks-is-complete", + "https://www.engagewr.ca/wilsonvaniertraynor/construction-starting-soon-at-vanier-park-and-traynor-park", + "https://www.engagewr.ca/wilsonvaniertraynor/final-concepts-and-project-update", + "https://www.engagewr.ca/wilsonvaniertraynor/how-should-we-include-a-willow-log-in-the-new-wilson-park-seating-area", + "https://www.engagewr.ca/wilsonvaniertraynor/how-we-used-the-willow-trees-in-the-new-wilson-park-seating-area", + "https://www.engagewr.ca/wilsonvaniertraynor/june-7-2023-community-planting", + "https://www.engagewr.ca/wilsonvaniertraynor/now-available-information-session-recording", + "https://www.engagewr.ca/wilsonvaniertraynor/online-forum", + "https://www.engagewr.ca/wilsonvaniertraynor/park-opening-celebration-sept-14", + "https://www.engagewr.ca/wilsonvaniertraynor/previous-page-content-fall-2021", + "https://www.engagewr.ca/wilsonvaniertraynor/previous-page-content-summer-2021", + "https://www.engagewr.ca/wilsonvaniertraynor/update-on-the-wilson-vanier-and-traynor-park-network", + "https://www.engagewr.ca/wilsonvaniertraynor/update-on-traynor-park", + "https://www.engagewr.ca/wilsonvaniertraynor/update-on-vanier-park", + "https://www.engagewr.ca/wilsonvaniertraynor/vanier-construction-update", + "https://www.engagewr.ca/window-replacement", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/woolwich-community-projects", + "https://www.engagewr.ca/woolwich-ctmp", + "https://www.engagewr.ca/woolwich-ctmp/join-our-second-online-workshop-complete-survey", + "https://www.engagewr.ca/woolwich-ctmp/news-survey1", + "https://www.engagewr.ca/woolwich-ctmp/notice-of-commencement", + "https://www.engagewr.ca/woolwich-ctmp/notice-public-workshop-1", + "https://www.engagewr.ca/woolwich-ctmp/phase-1-report-completed-comprehensive-transportation-mobility-plan", + "https://www.engagewr.ca/woolwich-ctmp/public-workshop-1-video-recording", + "https://www.engagewr.ca/woolwich-haf", + "https://www.engagewr.ca/woolwich-haf/successful-completion-first-annual-reporting-period-housing-accelerator-fund", + "https://www.engagewr.ca/woolwich-muudg", + "https://www.engagewr.ca/woolwich-muudg/2412", + "https://www.engagewr.ca/woolwich-muudg/draft-mixed-use-urban-design-guidelines-feedback", + "https://www.engagewr.ca/woolwich-muudg/draft-mixed-use-urban-design-guidelines-now-available", + "https://www.engagewr.ca/woolwich-muudg/final-mixed-use-urban-design-guidelines-draft-available", + "https://www.engagewr.ca/woolwich-muudg/muudg-survey1", + "https://www.engagewr.ca/woolwich-muudg/open-house-1", + "https://www.engagewr.ca/woolwich-muudg/person-open-house-2", + "https://www.engagewr.ca/wreds", + "https://www.engagewr.ca/wreds/2025-strategy-to-councils-for-review", + "https://www.engagewr.ca/wreds/celebrating-our-economic-potential-2", + "https://www.engagewr.ca/wreds/engagement-results", + "https://www.engagewr.ca/wreds/first-round-of-public-engagement", + "https://www.engagewr.ca/wreds/newcomers-and-cultural-communities", + "https://www.engagewr.ca/wreds/next-round-of-engagement-sessions-now-available-for-registration", + "https://www.engagewr.ca/wreds/youth-workshop-what-do-you-want-your-community-to-look-like", + "https://www.engagewr.ca/wrh-courtland-shelley-redevelopment", + "https://www.engagewr.ca/wrh-courtland-shelley-redevelopment/project-update-spring-2024", + "https://www.engagewr.ca/wrh-mooregate-redevelopment", + "https://www.engagewr.ca/wrh-mooregate-redevelopment/project-update-spring-2024", + "https://www.engagewr.ca/www-engagewr-ca-446-albert-st", + "https://www.engagewr.ca/ywcacambridgeshelter", + "https://www.engagewr.ca/zca0423" + ], + "crawlErrors": { + "https://www.engagewr.ca/projects": "Get \"https://www.engagewr.ca/projects\": context deadline exceeded (Client.Timeout exceeded while awaiting headers)" + }, + "linkStatuses": [ + { + "url": "https://www.engagewr.ca/cambridge-ca-fwreview", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/schaefer-reconstruction", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloo-heritage-register-review", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/st-moritz-park", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/prime-ministers-path", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/churchill-park-rocketship-playground-renewal", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.regionofwaterloo.ca/en/regional-government/agendas-minutes-and-webcasts.aspx", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/father-david-bauer-drive-play-area", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/.", + "statusCode": 404, + "ok": false + }, + { + "url": "https://www.engagewr.ca/cedar-creek-floodplain-study", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/new-wilmot-official-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloo-official-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/davenport-road-multi-use-path-connection", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/inclusionary-zoning", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/cooper-street-reconstruction-survey", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/udm-refresh", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/albert-watermain", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/childrens-services-systems-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/country-hills-park", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/sewer-use-bylaw-update", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.microsoft.com/edge", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.regionofwaterloo.ca/en/regional-government/communicate-with-council.aspx", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/blue-beech-link-spraypad", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/future-of-trees-waterloo", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/cemeteryplan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/older-adult", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/lions-canamera-spray-pad", + "statusCode": 200, + "ok": true + }, + { + "url": "http://www.engagewr.ca/", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/cambridge-preston-secondary-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://calendar.regionofwaterloo.ca/council", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/bechtel-courts", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/community-services-master-plan-wilmot", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/union-reconstruction", + "statusCode": 200, + "ok": true + }, + { + "url": "https://support.apple.com/downloads/safari", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/woolwich", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/noise-by-law-review", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/digitalkitchener", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/login", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.ipc.on.ca/", + "statusCode": 403, + "ok": false + }, + { + "url": "https://www.engagewr.ca/building-safer-communities", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/account", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/woolwich-community-projects", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/housing-needs-assessment-2", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloo-improvement-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/clair-creek-at-keats-way", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/white-elm-park", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/projects", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/register", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/neighbourhood-bikeways", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/grt-business-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/kingsdale", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/ainslie-street-improvements", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.regionofwaterloo.ca/Modules/News/Search.aspx?feedId=d190b4c1-d9d7-4cb8-bc36-f10bb4423ef7", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.regionofwaterloo.ca/en/regional-government/committees.aspx", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.socialpinpoint.com/terms-and-conditions", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/LTWMS", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/lexington-road-street-study", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/meadowlane-pond", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.socialpinpoint.com/", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/kitchener", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/margaret-ave-park", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/former-kraus-lands", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/accessibility", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/backyard-bbq-community-event-survey", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/transportation-and-mobility-master-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/main-street-reconstruction-design", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/fountain-street-reconstruction", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/encroachment-bylaw-review", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/engage-wilmot", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/queen-street-w-design-assignment", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/get-readi-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://getfirefox.com/", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/terms-use", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.waterloo.ca/en/government/indigenous-reconciliation.aspx", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/2026-mayors-budget", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/Stage2ION", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloo-park-circuit", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/mill-race-park-pedestrian-bridges", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloo-st-reconstruction", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.google.com/chrome", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/moore-avenue-south-reconstruction-1", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/carts", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/region-of-waterloo", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/engage-wellesley", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/stjacobswastewater", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/newcomer", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/speed-management", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/west-montrose", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/translation-disclaimer", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.regionofwaterloo.ca/en/regional-government/elections.aspx", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/roadreconstruction", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/victoriaparkmp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.regionofwaterloo.ca/en/regional-government/budget-and-finance-archives.aspx", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/frederick-street-shelter", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/official-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloo-budget-2024-2026", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/combatting-hate", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/blenheim-road-reconstruction-survey", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/myap-multi-year-accessibility-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.priv.gc.ca/.", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/arts-culture", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/moderation", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/cambridgerec", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.regionofwaterloo.ca/en/regional-government/live-webcast.aspx", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/copper-st-dog-park", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/centrevillechicopee", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/privacy-policy", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloohafactions", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.socialpinpoint.com/privacy-policy", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/queens-bush-road", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/development-planning-projects", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/login/forgot_password", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/nostalgia-survey", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/kitchener2051", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/sanitary-master-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/great-places-2023", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/ourplanforhuron", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/planning-applications-and-projects", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/mobility-zones-around-ion-stations", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/multi-use-sports-courts-churchill-and-weaver", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.regionofwaterloo.ca/en/regional-government/strategic-plan-2023-2027.aspx?_mid_=28240", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloo-rental", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/end-chronic-homelessness", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/high-performance-development-standards", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/engage-cambridge", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/sidewalkdesigns", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/beaver-creek-road-and-conservation-drive-reconstruction", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/new-website-migration", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/infrastructure-projects-bridges-roads-water-and-sewer", + "statusCode": 200, + "ok": true + }, + { + "url": "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "statusCode": 403, + "ok": false + }, + { + "url": "https://www.engagewr.ca/eby-farm-playground", + "statusCode": 200, + "ok": true + }, + { + "url": "http://www.engagewr.ca/privacy-policy", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/posey-line-culvert-replacement", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/jumpstart-accessible-multi-sport-court", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/trillium-valley-park-pond-48", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/shakespeare-drive-reconstruction", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/hespeler-heritage-conservation-district-study-and-plan", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/moore-avenue-south-reconstruction", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/placesandspaces", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/2025-plan-and-budget", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/AtTheTable", + "statusCode": 200, + "ok": true + }, + { + "url": "http://www.wellesley.ca/.", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloo-park", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/review-of-adult-entertainment-bylaws", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/galt-core-heritage-conservation-district", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/roundabout-safety", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.engagewr.ca/waterloo", + "statusCode": 200, + "ok": true + } + ], + "pageOutlinks": { + "http://www.engagewr.ca/privacy-policy": [ + "http://www.engagewr.ca/", + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/woolwich", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/woolwich", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/accessibility": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/account": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/forgot_password", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/engage-cambridge": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/2026-mayors-budget", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/arts-culture", + "https://www.engagewr.ca/blenheim-road-reconstruction-survey", + "https://www.engagewr.ca/cambridge-ca-fwreview", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street", + "https://www.engagewr.ca/cambridge-preston-secondary-plan", + "https://www.engagewr.ca/cambridgerec", + "https://www.engagewr.ca/cemeteryplan", + "https://www.engagewr.ca/churchill-park-rocketship-playground-renewal", + "https://www.engagewr.ca/cooper-street-reconstruction-survey", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/galt-core-heritage-conservation-district", + "https://www.engagewr.ca/hespeler-heritage-conservation-district-study-and-plan", + "https://www.engagewr.ca/high-performance-development-standards", + "https://www.engagewr.ca/housing-needs-assessment-2", + "https://www.engagewr.ca/inclusionary-zoning", + "https://www.engagewr.ca/jumpstart-accessible-multi-sport-court", + "https://www.engagewr.ca/lions-canamera-spray-pad", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/main-street-reconstruction-design", + "https://www.engagewr.ca/mill-race-park-pedestrian-bridges", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/multi-use-sports-courts-churchill-and-weaver", + "https://www.engagewr.ca/myap-multi-year-accessibility-plan", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning", + "https://www.engagewr.ca/new-website-migration", + "https://www.engagewr.ca/noise-by-law-review", + "https://www.engagewr.ca/older-adult", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/queen-street-w-design-assignment", + "https://www.engagewr.ca/sidewalkdesigns", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/engage-wellesley": [ + "http://www.engagewr.ca/privacy-policy", + "http://www.wellesley.ca/", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/backyard-bbq-community-event-survey", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/high-performance-development-standards", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/official-plan", + "https://www.engagewr.ca/posey-line-culvert-replacement", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/queens-bush-road", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/transportation-and-mobility-master-plan", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/engage-wilmot": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/community-services-master-plan-wilmot", + "https://www.engagewr.ca/encroachment-bylaw-review", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/new-wilmot-official-plan", + "https://www.engagewr.ca/prime-ministers-path", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/sewer-use-bylaw-update", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/kitchener": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/AtTheTable", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/centrevillechicopee", + "https://www.engagewr.ca/country-hills-park", + "https://www.engagewr.ca/digitalkitchener", + "https://www.engagewr.ca/great-places-2023", + "https://www.engagewr.ca/kingsdale", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/kitchener2051", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/meadowlane-pond", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/newcomer", + "https://www.engagewr.ca/ourplanforhuron", + "https://www.engagewr.ca/placesandspaces", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/review-of-adult-entertainment-bylaws", + "https://www.engagewr.ca/roadreconstruction", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/victoriaparkmp", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/login": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/forgot_password", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/forgot_password", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/moderation": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/privacy-policy": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/region-of-waterloo": [ + "http://www.engagewr.ca/privacy-policy", + "https://calendar.regionofwaterloo.ca/council", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/2025-plan-and-budget", + "https://www.engagewr.ca/LTWMS", + "https://www.engagewr.ca/Stage2ION", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/ainslie-street-improvements", + "https://www.engagewr.ca/building-safer-communities", + "https://www.engagewr.ca/carts", + "https://www.engagewr.ca/childrens-services-systems-plan", + "https://www.engagewr.ca/combatting-hate", + "https://www.engagewr.ca/end-chronic-homelessness", + "https://www.engagewr.ca/frederick-street-shelter", + "https://www.engagewr.ca/grt-business-plan", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/nostalgia-survey", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/roundabout-safety", + "https://www.engagewr.ca/stjacobswastewater", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/west-montrose", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.regionofwaterloo.ca/Modules/News/Search.aspx?feedId=d190b4c1-d9d7-4cb8-bc36-f10bb4423ef7", + "https://www.regionofwaterloo.ca/en/regional-government/agendas-minutes-and-webcasts.aspx", + "https://www.regionofwaterloo.ca/en/regional-government/budget-and-finance-archives.aspx", + "https://www.regionofwaterloo.ca/en/regional-government/committees.aspx", + "https://www.regionofwaterloo.ca/en/regional-government/communicate-with-council.aspx", + "https://www.regionofwaterloo.ca/en/regional-government/elections.aspx", + "https://www.regionofwaterloo.ca/en/regional-government/live-webcast.aspx", + "https://www.regionofwaterloo.ca/en/regional-government/strategic-plan-2023-2027.aspx?_mid_=28240", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/register": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/terms-use": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/translation-disclaimer": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ], + "https://www.engagewr.ca/waterloo": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/albert-watermain", + "https://www.engagewr.ca/beaver-creek-road-and-conservation-drive-reconstruction", + "https://www.engagewr.ca/bechtel-courts", + "https://www.engagewr.ca/blue-beech-link-spraypad", + "https://www.engagewr.ca/cedar-creek-floodplain-study", + "https://www.engagewr.ca/clair-creek-at-keats-way", + "https://www.engagewr.ca/copper-st-dog-park", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection", + "https://www.engagewr.ca/development-planning-projects", + "https://www.engagewr.ca/eby-farm-playground", + "https://www.engagewr.ca/father-david-bauer-drive-play-area", + "https://www.engagewr.ca/former-kraus-lands", + "https://www.engagewr.ca/fountain-street-reconstruction", + "https://www.engagewr.ca/future-of-trees-waterloo", + "https://www.engagewr.ca/get-readi-plan", + "https://www.engagewr.ca/lexington-road-street-study", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/margaret-ave-park", + "https://www.engagewr.ca/mobility-zones-around-ion-stations", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/moore-avenue-south-reconstruction", + "https://www.engagewr.ca/moore-avenue-south-reconstruction-1", + "https://www.engagewr.ca/neighbourhood-bikeways", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/sanitary-master-plan", + "https://www.engagewr.ca/schaefer-reconstruction", + "https://www.engagewr.ca/shakespeare-drive-reconstruction", + "https://www.engagewr.ca/speed-management", + "https://www.engagewr.ca/st-moritz-park", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/trillium-valley-park-pond-48", + "https://www.engagewr.ca/udm-refresh", + "https://www.engagewr.ca/union-reconstruction", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/waterloo-budget-2024-2026", + "https://www.engagewr.ca/waterloo-heritage-register-review", + "https://www.engagewr.ca/waterloo-improvement-plan", + "https://www.engagewr.ca/waterloo-official-plan", + "https://www.engagewr.ca/waterloo-park", + "https://www.engagewr.ca/waterloo-park-circuit", + "https://www.engagewr.ca/waterloo-rental", + "https://www.engagewr.ca/waterloo-st-reconstruction", + "https://www.engagewr.ca/waterloohafactions", + "https://www.engagewr.ca/white-elm-park", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions", + "https://www.waterloo.ca/en/government/indigenous-reconciliation.aspx" + ], + "https://www.engagewr.ca/woolwich": [ + "http://www.engagewr.ca/privacy-policy", + "https://getfirefox.com/", + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx", + "https://support.apple.com/downloads/safari", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/accessibility", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/high-performance-development-standards", + "https://www.engagewr.ca/infrastructure-projects-bridges-roads-water-and-sewer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/planning-applications-and-projects", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/projects", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/woolwich-community-projects", + "https://www.google.com/chrome", + "https://www.ipc.on.ca/", + "https://www.microsoft.com/edge", + "https://www.priv.gc.ca/", + "https://www.socialpinpoint.com/", + "https://www.socialpinpoint.com/privacy-policy", + "https://www.socialpinpoint.com/terms-and-conditions" + ] + }, + "linkSources": { + "http://www.engagewr.ca/": [ + "http://www.engagewr.ca/privacy-policy" + ], + "http://www.engagewr.ca/privacy-policy": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "http://www.wellesley.ca/": [ + "https://www.engagewr.ca/engage-wellesley" + ], + "https://calendar.regionofwaterloo.ca/council": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://getfirefox.com/": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://regionofwaterloo.sharepoint.com/sites/CommunicationsandEngagementSystemsPlanning/Shared%20Documents/General/EngageWR/Transition%20to%20Social%20PinPoint/Privacy%20and%20Terms%20of%20Use%20EngageWR%20.docx": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://support.apple.com/downloads/safari": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/2025-plan-and-budget": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/2026-mayors-budget": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/AtTheTable": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/LTWMS": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/Stage2ION": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/accessibility": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/account": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/ainslie-street-improvements": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/albert-watermain": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/arts-culture": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/backyard-bbq-community-event-survey": [ + "https://www.engagewr.ca/engage-wellesley" + ], + "https://www.engagewr.ca/beaver-creek-road-and-conservation-drive-reconstruction": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/bechtel-courts": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/blenheim-road-reconstruction-survey": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/blue-beech-link-spraypad": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/building-safer-communities": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/cambridge-ca-fwreview": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/cambridge-preston-secondary-plan": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/cambridgerec": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/carts": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/cedar-creek-floodplain-study": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/cemeteryplan": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/centrevillechicopee": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/childrens-services-systems-plan": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/churchill-park-rocketship-playground-renewal": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/clair-creek-at-keats-way": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/combatting-hate": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/community-services-master-plan-wilmot": [ + "https://www.engagewr.ca/engage-wilmot" + ], + "https://www.engagewr.ca/cooper-street-reconstruction-survey": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/copper-st-dog-park": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/country-hills-park": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/davenport-road-multi-use-path-connection": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/development-planning-projects": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/digitalkitchener": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/eby-farm-playground": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/encroachment-bylaw-review": [ + "https://www.engagewr.ca/engage-wilmot" + ], + "https://www.engagewr.ca/end-chronic-homelessness": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/engage-cambridge": [ + "https://www.engagewr.ca/", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca" + ], + "https://www.engagewr.ca/engage-wellesley": [ + "https://www.engagewr.ca/", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca" + ], + "https://www.engagewr.ca/engage-wilmot": [ + "https://www.engagewr.ca/", + "https://www.engagewr.ca", + "https://www.engagewr.ca/engage-wilmot" + ], + "https://www.engagewr.ca/father-david-bauer-drive-play-area": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/former-kraus-lands": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/fountain-street-reconstruction": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/frederick-street-shelter": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/future-of-trees-waterloo": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/galt-core-heritage-conservation-district": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/get-readi-plan": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/great-places-2023": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/grt-business-plan": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/hespeler-heritage-conservation-district-study-and-plan": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/high-performance-development-standards": [ + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich" + ], + "https://www.engagewr.ca/housing-needs-assessment-2": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/inclusionary-zoning": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/infrastructure-projects-bridges-roads-water-and-sewer": [ + "https://www.engagewr.ca/woolwich" + ], + "https://www.engagewr.ca/jumpstart-accessible-multi-sport-court": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/kingsdale": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/kitchener": [ + "https://www.engagewr.ca/", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca" + ], + "https://www.engagewr.ca/kitchener2051": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/lexington-road-street-study": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/lions-canamera-spray-pad": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/login": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/login/forgot_password": [ + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/login" + ], + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/main-street-reconstruction-design": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/margaret-ave-park": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/meadowlane-pond": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/mill-race-park-pedestrian-bridges": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/mobility-zones-around-ion-stations": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/moderation": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/moore-avenue-south-reconstruction": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/moore-avenue-south-reconstruction-1": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/multi-use-sports-courts-churchill-and-weaver": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/myap-multi-year-accessibility-plan": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/neighbourhood-bikeways": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/new-website-migration": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/new-wilmot-official-plan": [ + "https://www.engagewr.ca/engage-wilmot" + ], + "https://www.engagewr.ca/newcomer": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/noise-by-law-review": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/nostalgia-survey": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/official-plan": [ + "https://www.engagewr.ca/engage-wellesley" + ], + "https://www.engagewr.ca/older-adult": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/ourplanforhuron": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/placesandspaces": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/planning-applications-and-projects": [ + "https://www.engagewr.ca/woolwich" + ], + "https://www.engagewr.ca/posey-line-culvert-replacement": [ + "https://www.engagewr.ca/engage-wellesley" + ], + "https://www.engagewr.ca/prime-ministers-path": [ + "https://www.engagewr.ca/engage-wilmot" + ], + "https://www.engagewr.ca/privacy-policy": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/projects": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/queen-street-w-design-assignment": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/queens-bush-road": [ + "https://www.engagewr.ca/engage-wellesley" + ], + "https://www.engagewr.ca/region-of-waterloo": [ + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca" + ], + "https://www.engagewr.ca/register": [ + "https://www.engagewr.ca/", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot" + ], + "https://www.engagewr.ca/review-of-adult-entertainment-bylaws": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/roadreconstruction": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/roundabout-safety": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/sanitary-master-plan": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/schaefer-reconstruction": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/sewer-use-bylaw-update": [ + "https://www.engagewr.ca/engage-wilmot" + ], + "https://www.engagewr.ca/shakespeare-drive-reconstruction": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/sidewalkdesigns": [ + "https://www.engagewr.ca/engage-cambridge" + ], + "https://www.engagewr.ca/speed-management": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/st-moritz-park": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/stjacobswastewater": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/terms-use": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/translation-disclaimer": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.engagewr.ca/transportation-and-mobility-master-plan": [ + "https://www.engagewr.ca/engage-wellesley" + ], + "https://www.engagewr.ca/trillium-valley-park-pond-48": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/udm-refresh": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/union-reconstruction": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/victoriaparkmp": [ + "https://www.engagewr.ca/kitchener" + ], + "https://www.engagewr.ca/waterloo": [ + "https://www.engagewr.ca/", + "https://www.engagewr.ca", + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/waterloo-budget-2024-2026": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/waterloo-heritage-register-review": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/waterloo-improvement-plan": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/waterloo-official-plan": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/waterloo-park": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/waterloo-park-circuit": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/waterloo-rental": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/waterloo-st-reconstruction": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/waterloohafactions": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/west-montrose": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.engagewr.ca/white-elm-park": [ + "https://www.engagewr.ca/waterloo" + ], + "https://www.engagewr.ca/woolwich": [ + "https://www.engagewr.ca/", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca" + ], + "https://www.engagewr.ca/woolwich-community-projects": [ + "https://www.engagewr.ca/woolwich" + ], + "https://www.google.com/chrome": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.ipc.on.ca/": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.microsoft.com/edge": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.priv.gc.ca/": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.regionofwaterloo.ca/Modules/News/Search.aspx?feedId=d190b4c1-d9d7-4cb8-bc36-f10bb4423ef7": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.regionofwaterloo.ca/en/regional-government/agendas-minutes-and-webcasts.aspx": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.regionofwaterloo.ca/en/regional-government/budget-and-finance-archives.aspx": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.regionofwaterloo.ca/en/regional-government/committees.aspx": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.regionofwaterloo.ca/en/regional-government/communicate-with-council.aspx": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.regionofwaterloo.ca/en/regional-government/elections.aspx": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.regionofwaterloo.ca/en/regional-government/live-webcast.aspx": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.regionofwaterloo.ca/en/regional-government/strategic-plan-2023-2027.aspx?_mid_=28240": [ + "https://www.engagewr.ca/region-of-waterloo" + ], + "https://www.socialpinpoint.com/": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.socialpinpoint.com/privacy-policy": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.socialpinpoint.com/terms-and-conditions": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/region-of-waterloo", + "https://www.engagewr.ca/kitchener", + "https://www.engagewr.ca/engage-wellesley", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/engage-cambridge", + "https://www.engagewr.ca/woolwich", + "https://www.engagewr.ca/terms-use", + "https://www.engagewr.ca/moderation", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/translation-disclaimer", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/register", + "https://www.engagewr.ca/waterloo", + "https://www.engagewr.ca/engage-wilmot", + "https://www.engagewr.ca/accessibility" + ], + "https://www.waterloo.ca/en/government/indigenous-reconciliation.aspx": [ + "https://www.engagewr.ca/waterloo" + ] + }, + "missingInSitemap": [ + "http://www.engagewr.ca/privacy-policy", + "https://www.engagewr.ca", + "https://www.engagewr.ca/", + "https://www.engagewr.ca/account", + "https://www.engagewr.ca/login", + "https://www.engagewr.ca/login/logout/LOGOUT_TOKEN", + "https://www.engagewr.ca/register" + ], + "inSitemapNotCrawled": [ + "https://www.engagewr.ca/1-columbia-st-w", + "https://www.engagewr.ca/1-dunbar-rd", + "https://www.engagewr.ca/115-119-park-47-norman", + "https://www.engagewr.ca/137-141-woolwich-st", + "https://www.engagewr.ca/143-columbia-street-w", + "https://www.engagewr.ca/145-lincoln-rd", + "https://www.engagewr.ca/150-152-albert-st", + "https://www.engagewr.ca/155-park-st", + "https://www.engagewr.ca/155-university-ave-w", + "https://www.engagewr.ca/1665-Scotch-Line", + "https://www.engagewr.ca/170-180-columbia-st-w", + "https://www.engagewr.ca/177-179-albert-st", + "https://www.engagewr.ca/18-20-hickory-st", + "https://www.engagewr.ca/180-king-street-south-z-23-05", + "https://www.engagewr.ca/20-university-ave-e", + "https://www.engagewr.ca/200-weber-st-n", + "https://www.engagewr.ca/2023-27-strategic-plan", + "https://www.engagewr.ca/2023-27-strategic-plan/what-s-happening-this-week", + "https://www.engagewr.ca/2023admiralroad", + "https://www.engagewr.ca/2023admiralroad/construction-begins-april-22-2025", + "https://www.engagewr.ca/2023admiralroad/construction-begins-in-april", + "https://www.engagewr.ca/2023admiralroad/field-survey-announced", + "https://www.engagewr.ca/2023admiralroad/project-information-now-available", + "https://www.engagewr.ca/2023admiralroad/reconnect-letter", + "https://www.engagewr.ca/2023admiralroad/stage-1-sod-care-now-shifts-property-owners-roxborough-and-marlborough-avenues", + "https://www.engagewr.ca/2023admiralroad/stage-2-surface-works-construction-begins-aug-7", + "https://www.engagewr.ca/2023admiralroad/tree-management-plan", + "https://www.engagewr.ca/2023admiralroad/updated-tree-planting-list", + "https://www.engagewr.ca/2024-plan-and-budget", + "https://www.engagewr.ca/2024-plan-and-budget/come-talk-to-us-community-engagement-events", + "https://www.engagewr.ca/2024-playgrounds", + "https://www.engagewr.ca/2024-playgrounds/phase-two-news", + "https://www.engagewr.ca/2024-playgrounds/whats-next-after-phase-1", + "https://www.engagewr.ca/2025-budget", + "https://www.engagewr.ca/2025-plan-and-budget", + "https://www.engagewr.ca/2025-zbl-amendment", + "https://www.engagewr.ca/2025-zbl-amendment/township-launches-zoning-law-housekeeping-amendment", + "https://www.engagewr.ca/2026-mayors-budget", + "https://www.engagewr.ca/215-229-lexington-rd", + "https://www.engagewr.ca/22-12-regina-and-erb-street", + "https://www.engagewr.ca/22-church-street-west", + "https://www.engagewr.ca/22-church-street-west/3039", + "https://www.engagewr.ca/22-church-street-west/elmira-property-purchase", + "https://www.engagewr.ca/22-church-street-west/news-22church-rfp", + "https://www.engagewr.ca/22-church-street-west/township-seeks-feedback-proposed-sale-downtown-elmira-properties", + "https://www.engagewr.ca/2415-university-ave-e", + "https://www.engagewr.ca/249-253-sunview-st", + "https://www.engagewr.ca/273-and-275-sunview-street", + "https://www.engagewr.ca/275-erb-st-e", + "https://www.engagewr.ca/277-and-279-hazel-st", + "https://www.engagewr.ca/30-Florapine-Road", + "https://www.engagewr.ca/309-311-hawthorn-st-holding-removal", + "https://www.engagewr.ca/310-316-erb-st-w", + "https://www.engagewr.ca/316-king-st-n", + "https://www.engagewr.ca/325-northfield-drive-east", + "https://www.engagewr.ca/329-and-331-spruce-st", + "https://www.engagewr.ca/333-albert-st", + "https://www.engagewr.ca/354-king-st-n", + "https://www.engagewr.ca/359-369-erb-st-w", + "https://www.engagewr.ca/380-hagey-blvd", + "https://www.engagewr.ca/400-millennium-blvd", + "https://www.engagewr.ca/435-king-st-n", + "https://www.engagewr.ca/435-king-st-n-and-450-460-weber-st-n", + "https://www.engagewr.ca/475-485-king-st-n", + "https://www.engagewr.ca/50-university-ave-e", + "https://www.engagewr.ca/508-beechwood-dr", + "https://www.engagewr.ca/525-conestogo-road", + "https://www.engagewr.ca/525-to-565-conestogo-rd-w", + "https://www.engagewr.ca/556-576-conservation-dr", + "https://www.engagewr.ca/6-14-dietz-avenue-north", + "https://www.engagewr.ca/650-660-erb-st-w", + "https://www.engagewr.ca/651-663-erb-st-w", + "https://www.engagewr.ca/675-conservation-dr", + "https://www.engagewr.ca/720-erbsville-rd", + "https://www.engagewr.ca/85-89-columbia-300-hemlock", + "https://www.engagewr.ca/9-33-47-erb-st-w", + "https://www.engagewr.ca/91-97-milford-avenue", + "https://www.engagewr.ca/AMCC-expansion", + "https://www.engagewr.ca/AMCC-expansion/phase-1", + "https://www.engagewr.ca/AMCC-expansion/phase-1-1", + "https://www.engagewr.ca/AMCC-expansion/phase-2", + "https://www.engagewr.ca/AtTheTable", + "https://www.engagewr.ca/AtTheTable/accountable-and-transparent", + "https://www.engagewr.ca/AtTheTable/booths", + "https://www.engagewr.ca/AtTheTable/draw", + "https://www.engagewr.ca/AtTheTable/evaluate", + "https://www.engagewr.ca/AtTheTable/examples", + "https://www.engagewr.ca/AtTheTable/fairs", + "https://www.engagewr.ca/AtTheTable/hostyourown", + "https://www.engagewr.ca/AtTheTable/online", + "https://www.engagewr.ca/AtTheTable/relationship-building", + "https://www.engagewr.ca/AtTheTable/workshops", + "https://www.engagewr.ca/AtTheTable/youth", + "https://www.engagewr.ca/Gaukel-Street", + "https://www.engagewr.ca/Gaukel-Street/updates", + "https://www.engagewr.ca/LTWMS", + "https://www.engagewr.ca/SportsAffiliation", + "https://www.engagewr.ca/Stage2ION", + "https://www.engagewr.ca/University-Ave", + "https://www.engagewr.ca/accessibility-plan", + "https://www.engagewr.ca/activa-holdings-inc-barnswallow-drive-church-street-west-elmira", + "https://www.engagewr.ca/active-planning-applications", + "https://www.engagewr.ca/affordable-housing-bechtel", + "https://www.engagewr.ca/affordable-housing-bechtel/a-developer-team-is-recommended", + "https://www.engagewr.ca/affordable-housing-bechtel/bechtel-open-house", + "https://www.engagewr.ca/affordable-housing-bechtel/building-permit-approved-for-bechtel", + "https://www.engagewr.ca/affordable-housing-bechtel/come-and-have-your-say", + "https://www.engagewr.ca/affordable-housing-bechtel/geotechnical-investigation-jan-19", + "https://www.engagewr.ca/affordable-housing-bechtel/site-plan-application", + "https://www.engagewr.ca/affordable-housing-bechtel/site-plan-approval-for-bechtel", + "https://www.engagewr.ca/affordable-housing-bechtel/the-containers-for-the-new-bechtel-homes-have-arrived", + "https://www.engagewr.ca/affordable-housing-bechtel/the-containers-have-arrived", + "https://www.engagewr.ca/affordable-housing-bechtel/the-expression-of-interest-has-been-posted", + "https://www.engagewr.ca/affordable-housing-bechtel/update-on-bechtel", + "https://www.engagewr.ca/affordable-housing-bechtel/update-on-the-timeline", + "https://www.engagewr.ca/affordable-housing-bechtel/you-are-invited-to-the-virtual-open-house-for-bechtel-on-february-23-at-10am", + "https://www.engagewr.ca/affordable-housing-beechwood", + "https://www.engagewr.ca/affordable-housing-beechwood/a-developer-is-being-recommended", + "https://www.engagewr.ca/affordable-housing-beechwood/committee-of-adjustment-application", + "https://www.engagewr.ca/affordable-housing-beechwood/committee-of-adjustment-application-correction-to-information-notice-sent-to-neighbouring-property-owners", + "https://www.engagewr.ca/affordable-housing-beechwood/communication-from-southside-group", + "https://www.engagewr.ca/affordable-housing-beechwood/deadline-for-proposals-had-been-extended", + "https://www.engagewr.ca/affordable-housing-beechwood/environmental-assessment-timeline", + "https://www.engagewr.ca/affordable-housing-beechwood/environmental-assessment-update", + "https://www.engagewr.ca/affordable-housing-beechwood/hydro-excavation-on-site", + "https://www.engagewr.ca/affordable-housing-beechwood/moving-forward", + "https://www.engagewr.ca/affordable-housing-beechwood/neighbourhood-meetings-and-design-feedback", + "https://www.engagewr.ca/affordable-housing-beechwood/preliminary-design-feedback-and-next-steps", + "https://www.engagewr.ca/affordable-housing-beechwood/proposals-are-being-reviewed", + "https://www.engagewr.ca/affordable-housing-beechwood/rfp-has-been-posted-to-the-region-of-waterloos-website-you-can-find-the-link-here", + "https://www.engagewr.ca/affordable-housing-beechwood/site-design-option-are-being-created", + "https://www.engagewr.ca/affordable-housing-beechwood/site-work-and-parking", + "https://www.engagewr.ca/affordable-housing-beechwood/survey-still-open", + "https://www.engagewr.ca/affordable-housing-beechwood/technicians-and-consultants-on-site", + "https://www.engagewr.ca/affordable-housing-beechwood/upcoming-neighbourhood-meetings", + "https://www.engagewr.ca/affordable-housing-kingscourt", + "https://www.engagewr.ca/affordable-housing-kingscourt/420-kingscourt-now-has-a-builder", + "https://www.engagewr.ca/affordable-housing-kingscourt/building-permit-approved-for-420-kingscourt-drive", + "https://www.engagewr.ca/affordable-housing-kingscourt/committee-of-adjustment-meeting-with-the-city-of-waterloo-february-13-3pm", + "https://www.engagewr.ca/affordable-housing-kingscourt/construction-timeline-update", + "https://www.engagewr.ca/affordable-housing-kingscourt/construction-update-fall-2024", + "https://www.engagewr.ca/affordable-housing-kingscourt/neighbourhood-meeting-held-on-january-18-2022", + "https://www.engagewr.ca/affordable-housing-kingscourt/neighbourhood-meeting-jan-20-7-8pm", + "https://www.engagewr.ca/affordable-housing-kingscourt/the-tender-for-kingscourt-has-now-been-posted", + "https://www.engagewr.ca/ainslie-street-improvements", + "https://www.engagewr.ca/albert-st-and-hemlock-st", + "https://www.engagewr.ca/albert-watermain", + "https://www.engagewr.ca/albert-watermain/notice-of-public-information-centre-2", + "https://www.engagewr.ca/albert-watermain/public-information-session-2", + "https://www.engagewr.ca/alpinepark", + "https://www.engagewr.ca/alpinepark/alpine-construction-update", + "https://www.engagewr.ca/alpinepark/alpine-park-phase-2-engagement-summary", + "https://www.engagewr.ca/alpinepark/alpine-woodlot-trail-closures", + "https://www.engagewr.ca/alpinepark/construction-of-alpine-park-complete", + "https://www.engagewr.ca/alpinepark/construction-starting-soon-at-alpine-park", + "https://www.engagewr.ca/alpinepark/forum", + "https://www.engagewr.ca/alpinepark/now-available-2", + "https://www.engagewr.ca/alpinepark/previous-page-content-fall-2021", + "https://www.engagewr.ca/alpinepark/previous-page-content-summer-2021", + "https://www.engagewr.ca/alpinepark/project-updates", + "https://www.engagewr.ca/alpinepark/update-alpine-woodlot-trails-2", + "https://www.engagewr.ca/alpinepark/update-on-alpine-park", + "https://www.engagewr.ca/alpinepark/update-on-alpine-park-2", + "https://www.engagewr.ca/alpinepark/update-on-progress-at-alpine-park", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/community-steering-committee", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/end-of-year-update", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/join-a-working-group-for-the-waterloo-region-alternate-destination-clinics-project", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/mission-vision-and-values", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/project-update", + "https://www.engagewr.ca/alternate-destination-clinics-mental-health/project-update-2", + "https://www.engagewr.ca/anti-racism", + "https://www.engagewr.ca/anti-racism/2021-community-innovation-grant", + "https://www.engagewr.ca/anti-racism/anti-racism-advisory-working-group-biographies-2022", + "https://www.engagewr.ca/anti-racism/anti-racism-advisory-working-group-update-on-activities", + "https://www.engagewr.ca/anti-racism/anti-racism-virtual-community-town-hall-july-19-2022", + "https://www.engagewr.ca/anti-racism/august-12-2020-town-hall-summary-and-anti-racism-advisory-working-group-next-steps", + "https://www.engagewr.ca/anti-racism/december-18th-first-anti-racism-advisory-working-group-meeting", + "https://www.engagewr.ca/anti-racism/july-15-2020", + "https://www.engagewr.ca/anti-racism/july-21-2020-new-date-added-for-town-hall", + "https://www.engagewr.ca/anti-racism/national-indigenous-history-month-2022", + "https://www.engagewr.ca/anti-racism/november-27th-anti-racism-advisory-working-group-arawg-members-selected", + "https://www.engagewr.ca/anti-racism/october-15th-update-on-anti-racism-advisory-working-group-applications", + "https://www.engagewr.ca/anti-racism/october-30th-update-on-anti-racism-advisory-working-group-applications", + "https://www.engagewr.ca/anti-racism/pride-2022-waterloo-region-national-pride-month", + "https://www.engagewr.ca/anti-racism/project-updates", + "https://www.engagewr.ca/anti-racism/sample-title", + "https://www.engagewr.ca/anti-racism/september-17th-2020-selection-committee-update-and-anti-racism-advisory-working-group-application", + "https://www.engagewr.ca/anti-racism/statement-from-arawg-co-convenors-kamloops-residential-school", + "https://www.engagewr.ca/arthur-street-and-bypass-ea", + "https://www.engagewr.ca/arts-and-culture-masterplan", + "https://www.engagewr.ca/arts-culture", + "https://www.engagewr.ca/asset-management", + "https://www.engagewr.ca/athleticawards", + "https://www.engagewr.ca/athleticawards/council", + "https://www.engagewr.ca/backyard-bbq-community-event-survey", + "https://www.engagewr.ca/backyard-bbq-community-event-survey/test", + "https://www.engagewr.ca/backyard-bbq-community-event-survey/what-does-backyard-bbq-mean-you", + "https://www.engagewr.ca/badentrunk", + "https://www.engagewr.ca/badentrunk/gingerich-road-closure", + "https://www.engagewr.ca/barnswallow-drive-reconstruction-project", + "https://www.engagewr.ca/beaver-creek-rd-and-conservation-dr", + "https://www.engagewr.ca/beaver-creek-rd-and-conservation-dr-2", + "https://www.engagewr.ca/beaver-creek-road-and-conservation-drive-reconstruction", + "https://www.engagewr.ca/beaver-creek-road-and-conservation-drive-reconstruction/notice-reconstruction", + "https://www.engagewr.ca/bechtel-courts", + "https://www.engagewr.ca/belmont", + "https://www.engagewr.ca/belmont/belmont-village-urban-corridor-study-wrap-up", + "https://www.engagewr.ca/belmont/join-us-at-an-upcoming-walkshop", + "https://www.engagewr.ca/belmont/join-us-at-the-virtual-community-check-in-on-november-30th-2", + "https://www.engagewr.ca/belmont/join-us-nov-30-for-a-virtual-community-check-in", + "https://www.engagewr.ca/benton-and-frederick-cycling", + "https://www.engagewr.ca/beverlystreet", + "https://www.engagewr.ca/blackbridge", + "https://www.engagewr.ca/blair-creek-drive", + "https://www.engagewr.ca/blair-creek-drive/notice-of-commencement", + "https://www.engagewr.ca/blair-creek-drive/notice-of-completion", + "https://www.engagewr.ca/blair-creek-drive/public-information-centre", + "https://www.engagewr.ca/blair-creek-drive/public-information-centre-announcement", + "https://www.engagewr.ca/blair-creek-drive/report-to-council", + "https://www.engagewr.ca/bleams-rd", + "https://www.engagewr.ca/blenheim-road-reconstruction-survey", + "https://www.engagewr.ca/blue-beech-link-spraypad", + "https://www.engagewr.ca/blue-beech-link-spraypad/spring-2024-update", + "https://www.engagewr.ca/blue-beech-link-spraypad/spring-2025-update", + "https://www.engagewr.ca/blue-beech-link-spraypad/summer-2025-update", + "https://www.engagewr.ca/blue-beech-link-spraypad/survey-closed-1", + "https://www.engagewr.ca/blue-beech-link-spraypad/winning-design", + "https://www.engagewr.ca/brammyards", + "https://www.engagewr.ca/brammyards/council-supports-vision-for-the-future-of-bramm-yards", + "https://www.engagewr.ca/brammyards/report-to-council-june-13", + "https://www.engagewr.ca/brammyards/work-underway-prepare-bramm-yards-future-development", + "https://www.engagewr.ca/breslau-drain-no-1", + "https://www.engagewr.ca/breslau-secondary-plan-update", + "https://www.engagewr.ca/breslau-wet-well-upgrades-class-environmental-assessment", + "https://www.engagewr.ca/bridgeport-and-weber", + "https://www.engagewr.ca/broadview-avenue", + "https://www.engagewr.ca/broadview-avenue/construction-begins-may-30-2025", + "https://www.engagewr.ca/broadview-avenue/survey-now-open", + "https://www.engagewr.ca/broadview-avenue/surveyors-in-the-ne", + "https://www.engagewr.ca/brucestreet", + "https://www.engagewr.ca/brucestreet/bruce-street-concrete-works-driveway-access-letter", + "https://www.engagewr.ca/brucestreet/bruce-street-sod-start-of-warranty-letter", + "https://www.engagewr.ca/brucestreet/final-project-design-details-2", + "https://www.engagewr.ca/brucestreet/introduction-and-precondition-survey", + "https://www.engagewr.ca/brucestreet/stage-two-sod-end-of-warranty-letter", + "https://www.engagewr.ca/budget-2024", + "https://www.engagewr.ca/budget2026", + "https://www.engagewr.ca/building-safer-communities", + "https://www.engagewr.ca/building-safer-communities/2024-funded-projects", + "https://www.engagewr.ca/building-safer-communities/2025-grant-application", + "https://www.engagewr.ca/building-safer-communities/2025-grant-recipients", + "https://www.engagewr.ca/building-safer-communities/apply-to-join-the-guiding-council-2", + "https://www.engagewr.ca/building-safer-communities/bsc-grant-extension", + "https://www.engagewr.ca/building-safer-communities/building-safer-communities-funded-projects-2", + "https://www.engagewr.ca/building-safer-communities/building-safer-communities-update", + "https://www.engagewr.ca/building-safer-communities/call-for-funding-proposals", + "https://www.engagewr.ca/building-safer-communities/call-for-funding-proposals-2025", + "https://www.engagewr.ca/building-safer-communities/extension-for-bsc-call-for-proposals", + "https://www.engagewr.ca/building-safer-communities/extension-for-guiding-council-application", + "https://www.engagewr.ca/building-safer-communities/march-18th-iftar-registration", + "https://www.engagewr.ca/building-safer-communities/ydmapplication2025", + "https://www.engagewr.ca/building-safer-communities/youth-decision-making-team-application-launch-applications-now-closed-2", + "https://www.engagewr.ca/building-safer-communities/youth-decision-making-team-application-update", + "https://www.engagewr.ca/burn-montrose-metzloff-carlton", + "https://www.engagewr.ca/burn-montrose-metzloff-carlton/construction-starts-month-read-more-details", + "https://www.engagewr.ca/burn-montrose-metzloff-carlton/questionnaire-now-open-until-sept-16", + "https://www.engagewr.ca/burn-montrose-metzloff-carlton/surveyors-in-the-area", + "https://www.engagewr.ca/cachet-homes-victoria-inc", + "https://www.engagewr.ca/cambridge-50th-logo", + "https://www.engagewr.ca/cambridge-ca-fwreview", + "https://www.engagewr.ca/cambridge-community-satisfaction-survey-2022", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive/council-meeting-579-grand-ridge-drive", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive/neighbourhood-meeting-thursday-february-6-2025", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive/thank-you-for-attending-the-neighbourhood-meeting", + "https://www.engagewr.ca/cambridge-haf-project-0-grand-ridge-drive/traffic-and-safety-study-available-0579-grand-ridge-drive", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street/council-meeting-25-chalmers-street", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street/neighbourhood-meeting-monday-february-3-2025", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street/thank-you-for-attending-the-neighbourhood-meeting", + "https://www.engagewr.ca/cambridge-haf-project-25-chalmers-street/traffic-impact-study-available-25-chalmers-street-south", + "https://www.engagewr.ca/cambridge-maple-grove-road", + "https://www.engagewr.ca/cambridge-maple-grove-road/online-public-consultation-centre", + "https://www.engagewr.ca/cambridge-maple-grove-road/public-consultation-centre", + "https://www.engagewr.ca/cambridge-preston-secondary-plan", + "https://www.engagewr.ca/cambridge-to-union-passenger-rail", + "https://www.engagewr.ca/cambridgeavenue", + "https://www.engagewr.ca/cambridgeavenue/city-acceptance-of-sod-on-july-11-2023", + "https://www.engagewr.ca/cambridgeavenue/contractor-introduction-april-11-22", + "https://www.engagewr.ca/cambridgeavenue/project-information-june-2021", + "https://www.engagewr.ca/cambridgeavenue/sod-placement-2", + "https://www.engagewr.ca/cambridgeavenue/update-on-project-status-dec-2022", + "https://www.engagewr.ca/cambridgerec", + "https://www.engagewr.ca/carts", + "https://www.engagewr.ca/cedar-creek-floodplain-study", + "https://www.engagewr.ca/cedar-creek-floodplain-study/public-meeting", + "https://www.engagewr.ca/cedar-creek-floodplain-study/updated-draft-floodplain-mapping", + "https://www.engagewr.ca/cemeteryplan", + "https://www.engagewr.ca/centrevillechicopee", + "https://www.engagewr.ca/centrevillechicopee/city-of-kitchener-looking-for-feedback-on-centreville-chicopee-community-centre-outdoor-spaces", + "https://www.engagewr.ca/centrevillechicopee/construction-delayed-to-2024", + "https://www.engagewr.ca/centrevillechicopee/construction-delayed-to-2025", + "https://www.engagewr.ca/centrevillechicopee/construction-starts-this-fall", + "https://www.engagewr.ca/centrevillechicopee/construction-underway-centreville-chicopee", + "https://www.engagewr.ca/centrevillechicopee/exciting-progress-centreville-chicopee-community-centre", + "https://www.engagewr.ca/chapel-melrose-sheridan", + "https://www.engagewr.ca/chapel-melrose-sheridan/chapel-street-construction-begins-week-read-details", + "https://www.engagewr.ca/chapel-melrose-sheridan/letter-to-residents", + "https://www.engagewr.ca/chapel-melrose-sheridan/questionnaire-deadline-extended-to-sept-16", + "https://www.engagewr.ca/chapel-melrose-sheridan/questionnaire-now-open", + "https://www.engagewr.ca/charles-street-terminal-redevelopment", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/design-consultant-rfp", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/downtown-kitchener-community-survey-live-until-march-1-2024", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/new-short-term-parking", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/project-updates", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/second-round-of-engagement-kicks-off-august-5-2022", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/second-survey-now-closed", + "https://www.engagewr.ca/charles-street-terminal-redevelopment/the-region-of-waterloo-is-currently-seeking-public-applications-for-community-connector-position-s-for-the-charles-street-termin", + "https://www.engagewr.ca/cherrypark", + "https://www.engagewr.ca/cherrypark/cherry-festival-recap-and-cherry-park-upgrades", + "https://www.engagewr.ca/cherrypark/cherry-park-virtual-open-house-is-now-closed", + "https://www.engagewr.ca/cherrypark/join-us-at-the-cherry-park-festival", + "https://www.engagewr.ca/cherrypark/one-week-left-to-give-your-feedback", + "https://www.engagewr.ca/cherrypark/please-join-us-at-our-open-house-on-june-20", + "https://www.engagewr.ca/cherrypark/please-join-us-online-or-in-person-this-summer", + "https://www.engagewr.ca/cherrypark/virtual-open-house-launches", + "https://www.engagewr.ca/cherrypark/what-we-heard-from-you-this-past-summer", + "https://www.engagewr.ca/childrens-services-access-and-inclusion-plan", + "https://www.engagewr.ca/childrens-services-access-and-inclusion-plan/community-engagement-event-wait-list", + "https://www.engagewr.ca/childrens-services-access-and-inclusion-plan/community-engagement-for-the-early-years", + "https://www.engagewr.ca/childrens-services-access-and-inclusion-plan/community-engagement-for-the-early-years-and-child-care-event-may-16-2024-2", + "https://www.engagewr.ca/childrens-services-systems-plan", + "https://www.engagewr.ca/childrens-services-systems-plan/progress-updates", + "https://www.engagewr.ca/childrens-services-systems-plan/test", + "https://www.engagewr.ca/churchill-park-rocketship-playground-renewal", + "https://www.engagewr.ca/cip", + "https://www.engagewr.ca/city-of-waterloo-2020-2022-draft-budget", + "https://www.engagewr.ca/cityownedtrees", + "https://www.engagewr.ca/cityownedtrees/city-owned-trees-bylaw-report-goes-council-june-2", + "https://www.engagewr.ca/cityownedtrees/public-tree-law-updates-approved-council", + "https://www.engagewr.ca/clair-creek-at-keats-way", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-1", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-2", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-3", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-4", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-5", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-6", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-7", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-dec-8-2023", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-november-9", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-october-19-watermain-break", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-october-23-closure-of-keats-way-and-karen-keats-walk", + "https://www.engagewr.ca/clair-creek-at-keats-way/construction-update-september-26", + "https://www.engagewr.ca/clair-creek-at-keats-way/enbridge-gas-upgrades-complete-and-summary-of-upcoming-work-in-the-area", + "https://www.engagewr.ca/clair-creek-at-keats-way/halloween-construction-update-october-31", + "https://www.engagewr.ca/clair-creek-at-keats-way/keats-way-construction-begins-monday-september-18", + "https://www.engagewr.ca/clair-creek-at-keats-way/keats-way-construction-to-begin-in-september", + "https://www.engagewr.ca/clair-creek-at-keats-way/keats-way-construction-update", + "https://www.engagewr.ca/clair-creek-at-keats-way/neighbourhood-meeting-dec1", + "https://www.engagewr.ca/clair-creek-at-keats-way/neighbourhood-meeting-follow-up", + "https://www.engagewr.ca/clair-creek-at-keats-way/notice-of-construction-channel-rehabilitation", + "https://www.engagewr.ca/clair-creek-at-keats-way/project-updates", + "https://www.engagewr.ca/clair-creek-at-keats-way/storm-bypass-construction-and-channel-rehabilitation-update", + "https://www.engagewr.ca/clair-creek-at-keats-way/upcoming-construction-to-rehabilitate-banks-of-tributary-channel-to-clair-creek-and-completion-of-storm-bypass-sewer", + "https://www.engagewr.ca/clair-creek-at-keats-way/update-dec-2021", + "https://www.engagewr.ca/climate-action-and-sustainability", + "https://www.engagewr.ca/columbia-st-w-and-albert-st", + "https://www.engagewr.ca/combatting-hate", + "https://www.engagewr.ca/community-improvement-plan", + "https://www.engagewr.ca/community-improvement-plan/do-you-have-questions-or-thoughts-draft-cip", + "https://www.engagewr.ca/community-improvement-plan/final-cip-here-application-period-opens-june-3rd-2025", + "https://www.engagewr.ca/community-services-master-plan-wilmot", + "https://www.engagewr.ca/communitycanopychandler", + "https://www.engagewr.ca/communitycanopychandler/apply-to-have-a-free-tree-planted-on-your-private-property-2", + "https://www.engagewr.ca/communitycanopychandler/how-to-help-increase-the-tree-canopy-in-chandler-mowat", + "https://www.engagewr.ca/communitycanopychandler/kick-off-summer-with-us-july-5", + "https://www.engagewr.ca/communitycanopychandler/share-your-feedback-on-the-community-canopy-planting-plan-2", + "https://www.engagewr.ca/communitycanopychandler/survey-and-map-closing-soon", + "https://www.engagewr.ca/communitycanopychandler/thank-you-for-growing-a-greener-kitchener", + "https://www.engagewr.ca/communitycanopychandler/visit-us-at-chandler-mowat-community-centre", + "https://www.engagewr.ca/conestoga-college-bus-stops", + "https://www.engagewr.ca/connaught-street", + "https://www.engagewr.ca/connaught-street/construction-begins-month-read-more-details", + "https://www.engagewr.ca/connaught-street/letter-to-residents", + "https://www.engagewr.ca/connaught-street/test", + "https://www.engagewr.ca/conradcentre", + "https://www.engagewr.ca/conradcentre/council-approves-new-operating-model-for-conrad-centre-2", + "https://www.engagewr.ca/conradcentre/oct-28-report-to-council", + "https://www.engagewr.ca/conwayandwayne", + "https://www.engagewr.ca/conwayandwayne/contractor-introduction-parking-and-pre-condition-inspection", + "https://www.engagewr.ca/conwayandwayne/contractor-introduction-precondition-survey-and-parking-phase-3", + "https://www.engagewr.ca/conwayandwayne/letter-to-residents", + "https://www.engagewr.ca/conwayandwayne/sod-replacement-due-to-construction-2", + "https://www.engagewr.ca/conwayandwayne/surface-works-and-driveway-access-2", + "https://www.engagewr.ca/conwayandwayne/surface-works-and-driveway-access-phase-1", + "https://www.engagewr.ca/conwayandwayne/wayne-drive-surface-works-and-driveway-access", + "https://www.engagewr.ca/cooper-street-reconstruction-survey", + "https://www.engagewr.ca/copper-st-dog-park", + "https://www.engagewr.ca/copper-st-dog-park/construction-has-started", + "https://www.engagewr.ca/copper-st-dog-park/news-feed", + "https://www.engagewr.ca/copper-st-dog-park/spring-2025-update", + "https://www.engagewr.ca/country-hills-park", + "https://www.engagewr.ca/country-hills-park/corrected-open-house-date-july-24-2024", + "https://www.engagewr.ca/country-hills-park/country-hills-open-house-materials-and-final-survey", + "https://www.engagewr.ca/country-hills-park/country-hills-park-open-house-today-share-your-feedback-2", + "https://www.engagewr.ca/country-hills-park/field-studies-in-november-2", + "https://www.engagewr.ca/country-hills-park/first-survey-now-open", + "https://www.engagewr.ca/country-hills-park/healthy-yards-webinar-series", + "https://www.engagewr.ca/country-hills-park/join-us-at-the-july-24-country-hills-park-open-house", + "https://www.engagewr.ca/country-hills-park/let-s-talk-park-improvements-at-country-hills-park-january-28-and-february-2", + "https://www.engagewr.ca/country-hills-park/missing-the-open-house-answer-our-survey", + "https://www.engagewr.ca/country-hills-park/newsfeed-post", + "https://www.engagewr.ca/country-hills-park/one-week-until-the-open-house", + "https://www.engagewr.ca/country-hills-park/open-house-materials-available-share-your-feedback", + "https://www.engagewr.ca/country-hills-park/open-house-wednesday-rain-or-shine", + "https://www.engagewr.ca/country-hills-park/please-join-us-at-our-open-house-on-nov-22", + "https://www.engagewr.ca/country-hills-park/preliminary-concept-from-2016-stormwater-master-plan", + "https://www.engagewr.ca/country-hills-park/register-for-the-july-17-open-house", + "https://www.engagewr.ca/country-hills-park/save-date-april-1-open-house", + "https://www.engagewr.ca/country-hills-park/save-the-date-november-22-2023-open-house", + "https://www.engagewr.ca/country-hills-park/survey-deadline-extended-to-february-12-2023", + "https://www.engagewr.ca/country-hills-park/two-weeks-left-to-answer-the-design-survey", + "https://www.engagewr.ca/country-hills-park/upgrades-country-hills-park-begin-construction-late-august", + "https://www.engagewr.ca/country-hills-park/video-presentations-now-available", + "https://www.engagewr.ca/country-hills-park/what-we-heard-about-construction-and-how-we-engaged", + "https://www.engagewr.ca/country-hills-park/what-we-heard-about-the-final-design-option", + "https://www.engagewr.ca/country-hills-park/what-we-heard-from-our-first-open-house-and-survey", + "https://www.engagewr.ca/country-hills-park/what-we-heard-from-the-winter-2023-surveys-and-pop-up-events", + "https://www.engagewr.ca/country-hills-park/wrapping-up-field-assessment-phase", + "https://www.engagewr.ca/countryside-ponds", + "https://www.engagewr.ca/countryside-ponds/first-survey-now-open", + "https://www.engagewr.ca/countryside-ponds/healthy-yards-webinar-series", + "https://www.engagewr.ca/countryside-ponds/missed-the-open-house-answer-our-survey", + "https://www.engagewr.ca/countryside-ponds/newsfeed-post", + "https://www.engagewr.ca/countryside-ponds/one-week-until-the-open-house", + "https://www.engagewr.ca/countryside-ponds/preliminary-concept-from-2016-stormwater-master-plan", + "https://www.engagewr.ca/countryside-ponds/save-the-date-oct-29-open-house", + "https://www.engagewr.ca/countryside-ponds/what-we-heard-about-the-design-options", + "https://www.engagewr.ca/countryside-ponds/what-we-heard-from-the-winter-2023-survey-2", + "https://www.engagewr.ca/countryside-ponds/wrapping-up-field-assessment-phase", + "https://www.engagewr.ca/cricketstrategy", + "https://www.engagewr.ca/cricketstrategy/answer-the-survey", + "https://www.engagewr.ca/cricketstrategy/cricket-strategy-what-we-heard-report", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection/construction-update-spring-2021", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection/project-update-april-2025", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection/project-update-february-16-2024", + "https://www.engagewr.ca/davenport-road-multi-use-path-connection/updated-faqs", + "https://www.engagewr.ca/deerpark-crescent", + "https://www.engagewr.ca/deerpark-crescent/letter-to-residents", + "https://www.engagewr.ca/deerpark-crescent/questionnaire-open-until-aug-8-2025", + "https://www.engagewr.ca/development-planning-projects", + "https://www.engagewr.ca/development-planning-projects/apps-with-decisions", + "https://www.engagewr.ca/digitalkitchener", + "https://www.engagewr.ca/digitalkitchener/ccstaff", + "https://www.engagewr.ca/digitalkitchener/connect-share-and-shape-future-tech-kitchener", + "https://www.engagewr.ca/digitalkitchener/connect-share-and-win-join-digital-kitchener-person-session", + "https://www.engagewr.ca/digitalkitchener/follow-up", + "https://www.engagewr.ca/digitalkitchener/residents", + "https://www.engagewr.ca/digitalkitchener/staff", + "https://www.engagewr.ca/digitalkitchener/tech", + "https://www.engagewr.ca/digitalkitchener/tell-us-what-matters-most-you", + "https://www.engagewr.ca/digitalkitchener/what-we-heard-you", + "https://www.engagewr.ca/doddslane", + "https://www.engagewr.ca/doddslane/letter-to-residents", + "https://www.engagewr.ca/dodge-drive", + "https://www.engagewr.ca/dodge-drive/may-2024-update", + "https://www.engagewr.ca/doon", + "https://www.engagewr.ca/downtown-cambridge-truck-diversion-study", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/city-of-kitchener-completes-tree-and-paver-replacement-project-along-king-street-with-support-from-feddev-ontario", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/construction-complete-inspection-to-follow", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/downtown-tree-and-paver-update", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/information-session-mar-3", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/july-lane-closures-and-restrictions", + "https://www.engagewr.ca/downtown-tree-and-paver-replacement/more-information-now-available", + "https://www.engagewr.ca/dtkvision", + "https://www.engagewr.ca/dtkvision/do-it-yourself-diy-workshop-deadline-extend-to-april-16", + "https://www.engagewr.ca/dtkvision/how-to-get-involved", + "https://www.engagewr.ca/dtkvision/report-to-council", + "https://www.engagewr.ca/dtkvision/share-your-thoughts-on-the-draft-dtk-vision", + "https://www.engagewr.ca/dtkvision/share-your-vision-and-help-transform-the-future-of-downtown-kitchener-2", + "https://www.engagewr.ca/dtkvision/vision-for-downtown-kitchener-focuses-on-vibrancy-connection", + "https://www.engagewr.ca/dtkvision/what-we-heard-about-the-dtk-vision", + "https://www.engagewr.ca/duke-street-cycling-improvements", + "https://www.engagewr.ca/duke-street-reconstruction", + "https://www.engagewr.ca/dundeesecondaryplan", + "https://www.engagewr.ca/dundeesecondaryplan/big-moves", + "https://www.engagewr.ca/dundeesecondaryplan/join-tonight-s-public-meeting-or-share-feedback-online", + "https://www.engagewr.ca/dundeesecondaryplan/june-9th-public-engagement-meeting-video-recording", + "https://www.engagewr.ca/dundeesecondaryplan/learn-more-and-share-your-feedback-until-june-27", + "https://www.engagewr.ca/dundeesecondaryplan/notice-of-commencement", + "https://www.engagewr.ca/dundeesecondaryplan/notice-of-commencement-and-public-engagement-meeting", + "https://www.engagewr.ca/dundeesecondaryplan/project-update-new-study-area", + "https://www.engagewr.ca/dundeesecondaryplan/public-engagement-meeting-may-28-2025", + "https://www.engagewr.ca/dunke-street-culvert", + "https://www.engagewr.ca/east-side-lands", + "https://www.engagewr.ca/eastavenue", + "https://www.engagewr.ca/eastavenue/construction-begins-may-6-2024", + "https://www.engagewr.ca/eastavenue/construction-begins-this-month", + "https://www.engagewr.ca/eastavenue/project-information-and-first-public-engagement", + "https://www.engagewr.ca/eastbridge-green-spraypad", + "https://www.engagewr.ca/eastbridge-green-spraypad/spray-pad-open", + "https://www.engagewr.ca/eastbridge-green-spraypad/spring-2024-update", + "https://www.engagewr.ca/eastbridge-green-spraypad/spring-2025-update", + "https://www.engagewr.ca/eastbridge-green-spraypad/survey-closed", + "https://www.engagewr.ca/eastbridge-green-spraypad/winning-design-chosen", + "https://www.engagewr.ca/eastgaltchl", + "https://www.engagewr.ca/eby-farm-playground", + "https://www.engagewr.ca/eby-farm-playground/council-approved-funding-to-begin-construction", + "https://www.engagewr.ca/eby-farm-playground/phase-1-complete", + "https://www.engagewr.ca/eby-farm-playground/phase-2-why-are-we-making-these-changes", + "https://www.engagewr.ca/eby-farmstead", + "https://www.engagewr.ca/eby-farmstead/animal-display-comparators", + "https://www.engagewr.ca/eby-farmstead/history-of-animals-in-waterloo-park", + "https://www.engagewr.ca/eby-farmstead/marti-test-subpage", + "https://www.engagewr.ca/eby-farmstead/take-our-survey", + "https://www.engagewr.ca/eby-farmstead/the-current-herd", + "https://www.engagewr.ca/eby-farmstead/what-we-did-2", + "https://www.engagewr.ca/eby-farmstead/what-we-heard", + "https://www.engagewr.ca/edith-macintosh", + "https://www.engagewr.ca/edith-macintosh/december-1-update", + "https://www.engagewr.ca/edith-macintosh/project-updates", + "https://www.engagewr.ca/elgin-reconstruction", + "https://www.engagewr.ca/enablingfourunits", + "https://www.engagewr.ca/enablingfourunits/add-your-comments-online-or-at-an-open-house", + "https://www.engagewr.ca/enablingfourunits/draft-zoning-regulations-now-available", + "https://www.engagewr.ca/enablingfourunits/enabling-four-units-approved-by-council", + "https://www.engagewr.ca/enablingfourunits/followup", + "https://www.engagewr.ca/enablingfourunits/join-us-to-learn-more-about-the-enabling-four-units-project", + "https://www.engagewr.ca/enablingfourunits/new-information-about-adding-additional-dwelling-units", + "https://www.engagewr.ca/enablingfourunits/official-plan-and-zoning-by-law-amendments-now-in-effect", + "https://www.engagewr.ca/enablingfourunits/one-year-follow-survey", + "https://www.engagewr.ca/enablingfourunits/open-house-posters-now-available", + "https://www.engagewr.ca/enablingfourunits/proposed-official-plan-and-zoning-by-law-reports-now-available", + "https://www.engagewr.ca/enablingfourunits/public-meeting-on-draft-zoning-amendments-mar-25", + "https://www.engagewr.ca/enablingfourunits/virtual-public-meeting-recording-now-available", + "https://www.engagewr.ca/encroachment-bylaw-review", + "https://www.engagewr.ca/end-chronic-homelessness", + "https://www.engagewr.ca/end-chronic-homelessness/end-chronic-homelessness-news-feed", + "https://www.engagewr.ca/end-chronic-homelessness/funding-allocated-for-the-region-s-plan-to-end-chronic-homelessness-2", + "https://www.engagewr.ca/end-chronic-homelessness/media-release-share-your-voice-as-a-community-how-can-we-end-chronic-homelessness", + "https://www.engagewr.ca/end-chronic-homelessness/mid-project-key-findings-report-2", + "https://www.engagewr.ca/end-chronic-homelessness/news-feed", + "https://www.engagewr.ca/end-chronic-homelessness/prioritization-plan-end-chronic-homelessness-pech-work", + "https://www.engagewr.ca/end-chronic-homelessness/social-development-centre-waterloo-region-video-introduction-to-the-plan-to-end-chronic-homelessness", + "https://www.engagewr.ca/end-chronic-homelessness/video-community", + "https://www.engagewr.ca/end-chronic-homelessness/video-overlap-associates-social-development-centre-waterloo-region-sdcwr-and-region-of-waterloo-staff-co-present-an-update-to-co", + "https://www.engagewr.ca/end-chronic-homelessness/video-report-to-community", + "https://www.engagewr.ca/engage-north-dumfries", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/construction-updates-june-2024", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/december-2024-year-end-update", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/design-improvement-march-2023", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/fall-2020-public-input", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/project-update", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/project-update-phased-approach", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/project-updates", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/public-meeting", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/public-meeting-questions", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/test", + "https://www.engagewr.ca/engagewr.ca/king-victoria-transit-hub/virtual-public-meeting-presentation", + "https://www.engagewr.ca/erb-columbia-wilmot", + "https://www.engagewr.ca/erb-st-and-wilmot-line", + "https://www.engagewr.ca/erbsville-north-planning", + "https://www.engagewr.ca/ericktraplin", + "https://www.engagewr.ca/ericktraplin/erick-traplin-day-sunday-can-we-use-your-photo", + "https://www.engagewr.ca/fads", + "https://www.engagewr.ca/fads/final-update-facility-accessibility-design-standards", + "https://www.engagewr.ca/fads/thank-you-for-contributing", + "https://www.engagewr.ca/fairfieldavenue", + "https://www.engagewr.ca/fairfieldavenue/letter-to-residents", + "https://www.engagewr.ca/farrier-drive-farrier-place", + "https://www.engagewr.ca/farrier-drive-farrier-place/letter-to-residents", + "https://www.engagewr.ca/farrier-drive-farrier-place/questionnaire-now-open", + "https://www.engagewr.ca/father-david-bauer-dr-and-merchant-dr", + "https://www.engagewr.ca/father-david-bauer-drive-play-area", + "https://www.engagewr.ca/father-david-bauer-drive-play-area/natural-play-area", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/fergus-avenue-end-of-sod-warranty-stage-two", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/fergus-avenue-end-of-stage-one-sod-warranty-2", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/fergus-avenue-start-of-sod-warranty-stage-two", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/letter-to-residents", + "https://www.engagewr.ca/fergus-avenue-weber-street-east-to-thaler-avenue/sod-replacement-stage-one-2", + "https://www.engagewr.ca/fhstudy", + "https://www.engagewr.ca/fifeavenue", + "https://www.engagewr.ca/fifeavenue/construction-begins-september-2024", + "https://www.engagewr.ca/fifeavenue/intersection-closure-frederick-street-ann-street", + "https://www.engagewr.ca/fifeavenue/letter-to-residents", + "https://www.engagewr.ca/fifeavenue/new-stage-3-construction-begins-month", + "https://www.engagewr.ca/fifeavenue/phase-2-surface-works-begin-month", + "https://www.engagewr.ca/fifeavenue/project-information-and-new-resident-surveys", + "https://www.engagewr.ca/fireworks", + "https://www.engagewr.ca/fireworks/city-waterloo-amend-fireworks-bylaw-address-ongoing-concerns", + "https://www.engagewr.ca/fireworks/kitchener-city-council-approves-ban-sale-fireworks", + "https://www.engagewr.ca/fireworks/report-kitchener-city-council-april-14-2025", + "https://www.engagewr.ca/fireworks/township-north-dumfries-increases-fines-fireworks-violations", + "https://www.engagewr.ca/former-kraus-lands", + "https://www.engagewr.ca/former-kraus-lands/for-sale", + "https://www.engagewr.ca/former-kraus-lands/land-surplus", + "https://www.engagewr.ca/former-kraus-lands/proposed-plan", + "https://www.engagewr.ca/fountain-street-reconstruction", + "https://www.engagewr.ca/fountain-street-reconstruction/project-update-july-2025", + "https://www.engagewr.ca/fountain-street-reconstruction/public-information-session", + "https://www.engagewr.ca/four-units-four-storeys", + "https://www.engagewr.ca/four-units-four-storeys/formal-public-meeting-tonight-at-6-30pm", + "https://www.engagewr.ca/four-units-four-storeys/have-your-voice-heard-at-the-formal-public-meeting", + "https://www.engagewr.ca/four-units-four-storeys/have-your-voice-heard-on-the-four-units-four-storeys-initiative", + "https://www.engagewr.ca/four-units-four-storeys/join-us-at-the-formal-public-meeting-on-december-9th-at-6-30pm", + "https://www.engagewr.ca/four-units-four-storeys/join-us-for-a-virtual-public-meeting-on-october-30th", + "https://www.engagewr.ca/four-units-four-storeys/staff-report-is-now-available", + "https://www.engagewr.ca/four-units-four-storeys/thank-you-for-coming-to-the-virtual-public-meeting", + "https://www.engagewr.ca/four-units-four-storeys/waterloo-council-approves-four-units-four-storeys", + "https://www.engagewr.ca/four-units-four-storeys/what-can-additional-residential-units-do-you", + "https://www.engagewr.ca/four-units-four-storeys/what-kind-of-additions-can-i-make-to-my-home", + "https://www.engagewr.ca/franklin-blvd-improvements", + "https://www.engagewr.ca/franklinstreetsouth", + "https://www.engagewr.ca/franklinstreetsouth/contractor-intro", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-noise-exemption-and-extended-work-hours", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-reconnection-letter", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-sod-end-of-warranty-stage-one", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-sod-end-of-warranty-stage-two", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-sod-start-of-warranty-stage-three", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-sod-start-of-warranty-stage-two", + "https://www.engagewr.ca/franklinstreetsouth/franklin-street-south-stage-three-end-of-sod-warranty-letter", + "https://www.engagewr.ca/franklinstreetsouth/project-info", + "https://www.engagewr.ca/franklinstreetsouth/public-information", + "https://www.engagewr.ca/franklinstreetsouth/sod-replacement-stage-one-wilson-avenue-to-kingsway-drive", + "https://www.engagewr.ca/frederick-street-shelter", + "https://www.engagewr.ca/frederick-street-shelter/news-feed", + "https://www.engagewr.ca/frederickstreet", + "https://www.engagewr.ca/frederickstreet/construction-begins-march-31-2025", + "https://www.engagewr.ca/frederickstreet/construction-begins-september-2024", + "https://www.engagewr.ca/frederickstreet/frederick-street-construction-continues-stage-3-begins-next-week", + "https://www.engagewr.ca/frederickstreet/frederick-street-surface-works-begin-june-23-2025", + "https://www.engagewr.ca/frederickstreet/letter-to-residents", + "https://www.engagewr.ca/frederickstreet/sod-placement-notice-bruce-street-nearly-river-road", + "https://www.engagewr.ca/frederickstreet/stage-4-construction-begins-august-25-2025", + "https://www.engagewr.ca/frederickstreet/surface-works-begin-nov-25", + "https://www.engagewr.ca/frederickstreet/update-frederick-street-construction-bruce-street-victoria-street-north", + "https://www.engagewr.ca/frederickstreet/update-on-construction", + "https://www.engagewr.ca/future-of-trees-waterloo", + "https://www.engagewr.ca/galt-core-heritage-conservation-district", + "https://www.engagewr.ca/general-amendments-2024", + "https://www.engagewr.ca/george-street-high-street-and-charles-street-reconstruction-project", + "https://www.engagewr.ca/get-readi-plan", + "https://www.engagewr.ca/get-readi-plan/news-feed", + "https://www.engagewr.ca/govstack-themes-survey", + "https://www.engagewr.ca/grants", + "https://www.engagewr.ca/great-places-2023", + "https://www.engagewr.ca/great-places-2023/announcing-the-people-s-choice", + "https://www.engagewr.ca/great-places-2023/great-places-awards-celebrate-outstanding-development-projects-in-kitchener", + "https://www.engagewr.ca/great-places-2023/register-to-attend-the-great-places-awards", + "https://www.engagewr.ca/greenfieldtraynor", + "https://www.engagewr.ca/greenfieldtraynor/contractor-introduction-letter", + "https://www.engagewr.ca/greenfieldtraynor/letter-to-residents", + "https://www.engagewr.ca/greenfieldtraynor/sod-letter-greenfield", + "https://www.engagewr.ca/greenfieldtraynor/sod-letter-traynor", + "https://www.engagewr.ca/greenhouse-reduction-pathway-feasibility-study", + "https://www.engagewr.ca/greenhouseroad-ea", + "https://www.engagewr.ca/growingtogether", + "https://www.engagewr.ca/growingtogether/city-kitchener-enables-35000-new-homes-growing-together-east-policy", + "https://www.engagewr.ca/growingtogether/join-us-at-a-workshop-this-summer", + "https://www.engagewr.ca/growingtogether/share-your-feedback-on-the-draft-land-use-and-zoning-2", + "https://www.engagewr.ca/growingtogether/staff-office-hours", + "https://www.engagewr.ca/growingtogether/staff-report-and-attachments-now-available", + "https://www.engagewr.ca/growingtogetherwest", + "https://www.engagewr.ca/growingtogetherwest/additional-engagement-opportunity", + "https://www.engagewr.ca/growingtogetherwest/growing-together-west-update", + "https://www.engagewr.ca/growingtogetherwest/join-us-to-learn-more-about-the-draft-approach-to-growth-and-change-in-kitchener-s-major-transit-station-areas", + "https://www.engagewr.ca/growingtogetherwest/join-us-to-learn-more-about-the-growth-around-kitchener-s-major-transit-station-areas", + "https://www.engagewr.ca/growingtogetherwest/june-2023-status-update", + "https://www.engagewr.ca/growingtogetherwest/kitchener-takes-bold-action-on-housing-with-growing-together-plan-and-inclusionary-zoning-bylaw", + "https://www.engagewr.ca/growingtogetherwest/share-your-feedback-on-our-draft-approach-to-growth-and-change", + "https://www.engagewr.ca/growingtogetherwest/share-your-feedback-on-our-draft-official-plan-amendment-and-zoning-by-law-regulations", + "https://www.engagewr.ca/growingtogetherwest/staff-report-and-meeting-agenda", + "https://www.engagewr.ca/growingtogetherwest/staff-report-going-to-council-mar-18", + "https://www.engagewr.ca/growingtogetherwest/thank-you-for-your-feedback", + "https://www.engagewr.ca/grt-business-plan", + "https://www.engagewr.ca/grt-business-plan/business-plan-pop-up-sessions", + "https://www.engagewr.ca/grt-business-plan/grt-business-plan-launch", + "https://www.engagewr.ca/grt-business-plan/township-transit-virtual-sessions", + "https://www.engagewr.ca/halter-avenue-isley-drive-and-notre-dame-avenue-reconstruction-project", + "https://www.engagewr.ca/harryclasspool", + "https://www.engagewr.ca/harryclasspool/final-update-harry-class-pool-upgrades", + "https://www.engagewr.ca/harryclasspool/how-to-get-involved", + "https://www.engagewr.ca/harryclasspool/what-we-heard", + "https://www.engagewr.ca/heidelberg-park-revitalization", + "https://www.engagewr.ca/hespeler-heritage-conservation-district-study-and-plan", + "https://www.engagewr.ca/hespeler-heritage-conservation-district-study-and-plan-1", + "https://www.engagewr.ca/hespelercoreparking", + "https://www.engagewr.ca/hickory-and-hemlock", + "https://www.engagewr.ca/hidden-valley-flood-ea", + "https://www.engagewr.ca/hidden-valley-flood-ea/notice-of-commencement", + "https://www.engagewr.ca/hidden-valley-flood-ea/notice-of-study-completion", + "https://www.engagewr.ca/hidden-valley-flood-ea/public-information-centre-materials-now-available", + "https://www.engagewr.ca/hidden-valley-flood-ea/public-information-centre-oct-12-2023", + "https://www.engagewr.ca/hiddenvalley", + "https://www.engagewr.ca/hiddenvalley/council-approves-amendments-hidden-valley-land-use-implementation-project", + "https://www.engagewr.ca/hiddenvalley/environmental-impact-study", + "https://www.engagewr.ca/hiddenvalley/hidden-valley-health-impact-assessment", + "https://www.engagewr.ca/hiddenvalley/newsfeed-post", + "https://www.engagewr.ca/hiddenvalley/open-house-information-now-available", + "https://www.engagewr.ca/hiddenvalley/report-to-council", + "https://www.engagewr.ca/hiddenvalley/source-water-protection", + "https://www.engagewr.ca/high-performance-development-standards", + "https://www.engagewr.ca/highland", + "https://www.engagewr.ca/highland-and-delaware", + "https://www.engagewr.ca/highland-and-delaware/contractor-introduction-parking-and-pre-condition-inspection", + "https://www.engagewr.ca/highland-and-delaware/highland-road-east-and-delaware-avenue-reconstruction-tree-management-protection", + "https://www.engagewr.ca/highland-and-delaware/highland-road-stage-1-end-of-sod-warranty-letter", + "https://www.engagewr.ca/highland-and-delaware/kitchener-s-highland-road-undergoes-complete-street-transformation-with-new-continuous-sidewalks", + "https://www.engagewr.ca/highland-and-delaware/letter-to-residents", + "https://www.engagewr.ca/highland-and-delaware/project-details-and-project-presentation-boards", + "https://www.engagewr.ca/highland-and-delaware/reconnection-letter", + "https://www.engagewr.ca/highland-and-delaware/sod-replacement-letter", + "https://www.engagewr.ca/highland-and-delaware/stage-2-surface-works", + "https://www.engagewr.ca/highland-and-delaware/stage-2b-sod-acceptance", + "https://www.engagewr.ca/highland-and-delaware/surface-works", + "https://www.engagewr.ca/highland-and-delaware/xx", + "https://www.engagewr.ca/highland/project-updates", + "https://www.engagewr.ca/highland/request-for-proposals-has-been-posted", + "https://www.engagewr.ca/homes-for-all-summit", + "https://www.engagewr.ca/housing-needs-assessment-2", + "https://www.engagewr.ca/housing-needs-assessment-2/housing-needs-assessment", + "https://www.engagewr.ca/housing-needs-assessment-2/housing-needs-assessment-federal-template", + "https://www.engagewr.ca/idlewood-stormwater", + "https://www.engagewr.ca/idlewood-stormwater/correction-to-survey-2", + "https://www.engagewr.ca/idlewood-stormwater/first-survey-now-open", + "https://www.engagewr.ca/idlewood-stormwater/join-our-open-house-on-may-1", + "https://www.engagewr.ca/idlewood-stormwater/join-the-nurture-nature-workshop-at-the-open-house", + "https://www.engagewr.ca/idlewood-stormwater/newsfeed-post", + "https://www.engagewr.ca/idlewood-stormwater/one-week-left-to-answer-the-design-survey", + "https://www.engagewr.ca/idlewood-stormwater/pic-materials-available-answer-our-survey", + "https://www.engagewr.ca/idlewood-stormwater/preliminary-concept-from-2016-stormwater-masterplan", + "https://www.engagewr.ca/idlewood-stormwater/what-we-heard-from-the-winter-2023-survey", + "https://www.engagewr.ca/idlewood-stormwater/what-we-heard-from-you-and-our-next-steps", + "https://www.engagewr.ca/idlewood-stormwater/where-is-idlewood-greenway", + "https://www.engagewr.ca/idlewood-stormwater/wrapping-up-field-assessment-phase", + "https://www.engagewr.ca/inclusionary-zoning", + "https://www.engagewr.ca/inclusionary-zoning-amendment", + "https://www.engagewr.ca/inclusionary-zoning/answer-our-survey-on-inclusionary-zoning", + "https://www.engagewr.ca/inclusionary-zoning/development-community-engagement", + "https://www.engagewr.ca/inclusionary-zoning/inclusionary-zoning-policy-and-discussion-paper-set-to-go-to-kitchener-council-on-june-19-and-waterloo-council-on-june-26", + "https://www.engagewr.ca/inclusionary-zoning/inclusionary-zoning-report-to-be-presented-to-kitchener-city-council", + "https://www.engagewr.ca/inclusionary-zoning/jan-23-public-meeting-on-inclusionary-zoning", + "https://www.engagewr.ca/inclusionary-zoning/kitchener-council-approves-inclusionary-zoning-for-2026", + "https://www.engagewr.ca/inclusionary-zoning/kitchener-takes-bold-action-on-housing-with-growing-together-plan-and-inclusionary-zoning-bylaw", + "https://www.engagewr.ca/inclusionary-zoning/public-meeting-jan-29-2024", + "https://www.engagewr.ca/inclusionary-zoning/public-meeting-takes-place-in-waterloo-on-june-24", + "https://www.engagewr.ca/inclusionary-zoning/send-us-your-thoughts-and-feedback-on-the-discussion-paper", + "https://www.engagewr.ca/inclusionary-zoning/staff-report-going-to-council-mar-18", + "https://www.engagewr.ca/inclusionary-zoning/staff-report-going-to-kitchener-city-council-on-december-2", + "https://www.engagewr.ca/inclusionary-zoning/staff-report-waterloo-city-council-mar-3", + "https://www.engagewr.ca/inclusionary-zoning/waterloo-city-council-defers-implementation-inclusionary-zoning", + "https://www.engagewr.ca/indianroad", + "https://www.engagewr.ca/indianroad/letter-to-residents", + "https://www.engagewr.ca/indianroad/students-and-staff-host-feast-to-reflect-on-renaming-process", + "https://www.engagewr.ca/infrastructure-projects-bridges-roads-water-and-sewer", + "https://www.engagewr.ca/initiative-9-redevelopment-places-worship-housing", + "https://www.engagewr.ca/interim-housing-solutions", + "https://www.engagewr.ca/interim-housing-solutions/updates", + "https://www.engagewr.ca/johnston-patrick-wellington", + "https://www.engagewr.ca/johnston-patrick-wellington/letter-to-residents", + "https://www.engagewr.ca/josephandstewart", + "https://www.engagewr.ca/josephandstewart/2nd-public-information-letter", + "https://www.engagewr.ca/josephandstewart/construction-on-pause-until-summer-2023", + "https://www.engagewr.ca/josephandstewart/construction-scheduled-to-start-july-4-2022", + "https://www.engagewr.ca/josephandstewart/contractor-intro", + "https://www.engagewr.ca/josephandstewart/letter-to-residents", + "https://www.engagewr.ca/jumpstart-accessible-multi-sport-court", + "https://www.engagewr.ca/king-and-coronation-improvements", + "https://www.engagewr.ca/king-and-coronation-improvements/project-updates", + "https://www.engagewr.ca/king-street-east", + "https://www.engagewr.ca/king-street-east/project-introduction-and-surveyor-information", + "https://www.engagewr.ca/king-street-shelter", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-community-meeting-june-20", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-community-meeting-sept-12", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-may-30-2024-update", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-neighbourhood-meeting-january-23", + "https://www.engagewr.ca/king-street-shelter/king-street-emergency-shelter-update-july-16-2024", + "https://www.engagewr.ca/king-street-shelter/king-street-shelter-closure-update-january-2025", + "https://www.engagewr.ca/king-street-shelter/king-street-shelter-closure-update-march-2025", + "https://www.engagewr.ca/king-street-shelter/project-updates", + "https://www.engagewr.ca/kingsdale", + "https://www.engagewr.ca/kingsdale/join-us-at-the-summer-splash-bash-and-movie-night", + "https://www.engagewr.ca/kingsdale/strengths", + "https://www.engagewr.ca/kingsdale/tell-us-what-strengths-you-see-kingsdale-neighbourhood-and-share-your-gifts", + "https://www.engagewr.ca/kitchener-budget-2024", + "https://www.engagewr.ca/kitchener-budget-2024/draft-2024-budget-continues-trend-of-delivering-value-for-kitchener-residents", + "https://www.engagewr.ca/kitchener-budget-2024/get-involved-in-the-2024-budget-process-2", + "https://www.engagewr.ca/kitchener-budget-2024/kitchener-s-finalized-2024-budget-includes-key-investments-to-advance-community-priorities-2", + "https://www.engagewr.ca/kitchener-budget-2025", + "https://www.engagewr.ca/kitchener-budget-2025/deadline-extended-to-nov-26", + "https://www.engagewr.ca/kitchener-budget-2025/draft-documents-now-available-survey-closes-nov-20", + "https://www.engagewr.ca/kitchener-budget-2025/kitchener-adopts-budget-that-invests-in-infrastructure-delivers-value", + "https://www.engagewr.ca/kitchener-lancaster-street", + "https://www.engagewr.ca/kitchener-new-dundee-road-roundabout", + "https://www.engagewr.ca/kitchener-wastewater-treatment-plant", + "https://www.engagewr.ca/kitchener2051", + "https://www.engagewr.ca/kitchener2051/approaches-growth-workshop", + "https://www.engagewr.ca/kitchener2051/approaches-growth-workshop-and-matching-online-activity", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/1-getting-around", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/2-coffee-time", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/3-right-fit", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/4-to-do", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/5-unwind", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/6-dinner-time", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/7-experience", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/8-night-out", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/big-reveal", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/core-assumptions", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/scenarios", + "https://www.engagewr.ca/kitchener2051/approaches-to-growth/week-in-the-life", + "https://www.engagewr.ca/kitchener2051/block-party", + "https://www.engagewr.ca/kitchener2051/community-conversation-kit", + "https://www.engagewr.ca/kitchener2051/continuing-the-conversation-with-launch-on-the-go-2", + "https://www.engagewr.ca/kitchener2051/deadline-extended-to-complete-online-activities", + "https://www.engagewr.ca/kitchener2051/help-plan-your-community-take-part-in-online-activities", + "https://www.engagewr.ca/kitchener2051/host-conversation-shape-kitchener-2051-person-or-over-free-pizza", + "https://www.engagewr.ca/kitchener2051/kitchener-2051-continues-completion-technical-studies", + "https://www.engagewr.ca/kitchener2051/kitchener-2051-engagement-snapshot", + "https://www.engagewr.ca/kitchener2051/kitchener-2051-speakers-series-2", + "https://www.engagewr.ca/kitchener2051/open-call-for-applicants-kitchener-2051-community-working-group", + "https://www.engagewr.ca/kitchener2051/priorities", + "https://www.engagewr.ca/kitchener2051/prioritize-kitchener-2051s-emerging-directions-approaches-growth-update", + "https://www.engagewr.ca/kitchener2051/see-you-at-the-gaukel-block-party-this-saturday-oct-5", + "https://www.engagewr.ca/kitchener2051/speakers-series-ability-and-mobility", + "https://www.engagewr.ca/kitchener2051/speakerseries1", + "https://www.engagewr.ca/kitchener2051/thanks-to-all-who-applied", + "https://www.engagewr.ca/kitchener2051/welcome-to-kitchener-2051", + "https://www.engagewr.ca/kitchener2051cwg", + "https://www.engagewr.ca/kitchener2051cwg/forum", + "https://www.engagewr.ca/kitchener2051cwg/international-volunteer-day-december-5", + "https://www.engagewr.ca/kitchener2051cwg/november-2024-meeting", + "https://www.engagewr.ca/kitchenermarket", + "https://www.engagewr.ca/kitchenermarket/university-and-college-students-visit-our-pop-up-booth", + "https://www.engagewr.ca/kitchenermarket/what-we-heard", + "https://www.engagewr.ca/kitchenermarket2023", + "https://www.engagewr.ca/kitchenermarket2023/thank-you", + "https://www.engagewr.ca/kitchenermarket2023/what-we-heard", + "https://www.engagewr.ca/kite-flying-vs-kite-fighting", + "https://www.engagewr.ca/kite-flying-vs-kite-fighting/do-you-have-any-thoughts-kite-fighting", + "https://www.engagewr.ca/kutransition", + "https://www.engagewr.ca/kutransition/120-years-of-energy-innovation", + "https://www.engagewr.ca/kutransition/council-endorses-guiding-principles-for-kitchener-utilities-clean-energy-transition-strategy-2", + "https://www.engagewr.ca/kutransition/kitchener-utilities-takes-next-steps-to-evolve-business-model-and-develop-clean-energy-transition-strategy-2", + "https://www.engagewr.ca/kutransition/possible-pathways-for-kitchener-s-energy-future", + "https://www.engagewr.ca/kutransition/progress-ku-clean-energy-transition-continues-city-explores-possible-business-activities", + "https://www.engagewr.ca/kutransition/report-on-phase-one-to-go-to-council", + "https://www.engagewr.ca/kutransition/reports-now-available", + "https://www.engagewr.ca/kutransition/take-part-in-kitchener-utilities-clean-energy-transition", + "https://www.engagewr.ca/kutransition/the-city-s-climate-commitments", + "https://www.engagewr.ca/kw-westmount-road", + "https://www.engagewr.ca/laneway50146", + "https://www.engagewr.ca/laneway50146/letter-to-residents", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction/construction-update-may-27-2024", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction/phase-2-construction-update-may-23-to-26", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction/public-information-session-2", + "https://www.engagewr.ca/langford-and-quickfall-reconstruction/public-information-session-3", + "https://www.engagewr.ca/langs-development", + "https://www.engagewr.ca/langs-development/city-accepts-application-for-official-plan-and-zoning-by-law-amendments", + "https://www.engagewr.ca/langs-development/project-receives-site-plan-approval-2", + "https://www.engagewr.ca/langs-development/project-update-building-permit-issued-2", + "https://www.engagewr.ca/langs-development/project-update-council-approves-project-builder", + "https://www.engagewr.ca/langs-development/project-update-fall-2024-beginning-of-construction", + "https://www.engagewr.ca/lauris", + "https://www.engagewr.ca/lauris/project-updates", + "https://www.engagewr.ca/lauris/region-of-waterloo-launches-request-for-proposal-process-for-development-partner-in-mixed-income-housing-project-at-30-lauris-av", + "https://www.engagewr.ca/lauris/two-parcels-for-sale", + "https://www.engagewr.ca/lawrenceavenue", + "https://www.engagewr.ca/lawrenceavenue/construction-begins-june-10-2024", + "https://www.engagewr.ca/lawrenceavenue/letter-to-residents", + "https://www.engagewr.ca/lawrenceavenue/project-details-and-first-open-house", + "https://www.engagewr.ca/lawrenceavenue/surface-works-notice-more-information", + "https://www.engagewr.ca/lexington-road-street-study", + "https://www.engagewr.ca/lexington-road-street-study/public-meeting", + "https://www.engagewr.ca/lexington-road-street-study/public-meeting-details", + "https://www.engagewr.ca/lexington-road-street-study/what-we-learned", + "https://www.engagewr.ca/linden-drive-playground", + "https://www.engagewr.ca/lions-canamera-spray-pad", + "https://www.engagewr.ca/lodginghouse", + "https://www.engagewr.ca/lodginghouse/council-amends-official-plan-and-zoning-by-law-to-permit-lodging-houses-city-wide-2", + "https://www.engagewr.ca/lodginghouse/council-approves-lodging-house-by-law", + "https://www.engagewr.ca/lodginghouse/lodging-house-bylaw-approved-new-short-term-rental-bylaw-coming", + "https://www.engagewr.ca/lodginghouse/report-going-to-council-june-3", + "https://www.engagewr.ca/lodginghouse/report-on-lodging-house-bylaw-goes-to-council-aug-12", + "https://www.engagewr.ca/longfellow-reconstruction", + "https://www.engagewr.ca/longfellow-reconstruction/design-options-for-feedback", + "https://www.engagewr.ca/longfellow-reconstruction/final-design", + "https://www.engagewr.ca/longfellow-reconstruction/reconstruction-design-phase", + "https://www.engagewr.ca/longfellow-reconstruction/retaining-wall-options", + "https://www.engagewr.ca/longfellow-reconstruction/retaining-wall-selection", + "https://www.engagewr.ca/longfellow-reconstruction/update-following-december-4-council-delegation", + "https://www.engagewr.ca/lowerdoon", + "https://www.engagewr.ca/lowerdoon/deadline-extended", + "https://www.engagewr.ca/lowerdoon/join-us-for-a-may-10-community-engagement-event", + "https://www.engagewr.ca/lowerdoon/join-us-oct-23-for-a-virtual-open-house", + "https://www.engagewr.ca/lowerdoon/lower-doon-land-use-changes-approved", + "https://www.engagewr.ca/lowerdoon/open-house-materials-now-available", + "https://www.engagewr.ca/mackay-crescent", + "https://www.engagewr.ca/mackay-crescent/design-options-for-potential-new-sidewalk", + "https://www.engagewr.ca/mackay-crescent/preferred-option-selected", + "https://www.engagewr.ca/mackay-crescent/trail-closure-update", + "https://www.engagewr.ca/mackay-crescent/virtual-public-information-centre-1", + "https://www.engagewr.ca/mackay-crescent/virtual-public-information-centre-2", + "https://www.engagewr.ca/mackenzieavenue", + "https://www.engagewr.ca/mackenzieavenue/introduction-letter", + "https://www.engagewr.ca/mackenzieavenue/letter-to-residents", + "https://www.engagewr.ca/mackenzieavenue/project-details", + "https://www.engagewr.ca/mackenzieavenue/stage-1-and-2-sod-placement-letter", + "https://www.engagewr.ca/mackenzieavenue/stage-1-and-stage-2-surface-works-and-driveway-access-letter", + "https://www.engagewr.ca/mackenzieavenue/updated-project-information", + "https://www.engagewr.ca/madwest-breslau-limited", + "https://www.engagewr.ca/main-street-reconstruction-design", + "https://www.engagewr.ca/maple-street-revitalization", + "https://www.engagewr.ca/maple-street-revitalization/woolwich-secures-properties-redevelopment-elmira", + "https://www.engagewr.ca/margaret-ave-park", + "https://www.engagewr.ca/margaret-ave-park/get-ready", + "https://www.engagewr.ca/margaret-ave-park/ideas-and-stories", + "https://www.engagewr.ca/margaret-ave-park/kickoff", + "https://www.engagewr.ca/margaret-ave-park/survey", + "https://www.engagewr.ca/margaret-ave-park/what-we-learned", + "https://www.engagewr.ca/maryhill-heritage-park-community-centre-playground", + "https://www.engagewr.ca/mccc", + "https://www.engagewr.ca/mccc/about-phase-1", + "https://www.engagewr.ca/mccc/business-case-approved-moving-on-to-phase-2", + "https://www.engagewr.ca/mccc/council-approves-public-art-commission-mill-courtland-community-centre", + "https://www.engagewr.ca/mccc/expansion-mill-courtland-community-centre-begins", + "https://www.engagewr.ca/mccc/join-us-sept-10-to-view-share-ideas-and-vote-on-design-concepts", + "https://www.engagewr.ca/mccc/mill-courtland-community-centre-closed-starting-july-2-2025", + "https://www.engagewr.ca/mccc/mill-courtland-community-centre-expansion-idea-boards", + "https://www.engagewr.ca/mccc/public-art-opportunity-at-mill-courtland", + "https://www.engagewr.ca/mccc/report-the-story-of-a-local-community-centre", + "https://www.engagewr.ca/mccc/share-your-thoughts-on-mccc-public-art-proposals", + "https://www.engagewr.ca/mclennan-lions", + "https://www.engagewr.ca/meadowlane-pond", + "https://www.engagewr.ca/meadowlane-pond/community-resource-group-deadline-yard-naturalization-workshop", + "https://www.engagewr.ca/meadowlane-pond/current-consultation-process-overview", + "https://www.engagewr.ca/meadowlane-pond/field-studies-in-november-2", + "https://www.engagewr.ca/meadowlane-pond/first-survey-now-open", + "https://www.engagewr.ca/meadowlane-pond/healthy-yards-webinar-series", + "https://www.engagewr.ca/meadowlane-pond/jan-2023-update-on-meadowlane-park", + "https://www.engagewr.ca/meadowlane-pond/join-us-at-the-july-16-meadowlane-park-open-house", + "https://www.engagewr.ca/meadowlane-pond/let-s-talk-stormwater-at-meadowlane-park", + "https://www.engagewr.ca/meadowlane-pond/meadowlane-construction-progressing-schedule", + "https://www.engagewr.ca/meadowlane-pond/meadowlane-park-open-house-on-november-8-2023", + "https://www.engagewr.ca/meadowlane-pond/new-frequently-asked-questions-posted", + "https://www.engagewr.ca/meadowlane-pond/newsfeed-post", + "https://www.engagewr.ca/meadowlane-pond/open-house-materials-and-final-survey", + "https://www.engagewr.ca/meadowlane-pond/open-house-today-moved-to-school-parking-lot", + "https://www.engagewr.ca/meadowlane-pond/open-house-tomorrow-rain-or-shine", + "https://www.engagewr.ca/meadowlane-pond/responding-to-hill-concerns", + "https://www.engagewr.ca/meadowlane-pond/save-date-march-25-open-house", + "https://www.engagewr.ca/meadowlane-pond/save-the-date-july-16-open-house", + "https://www.engagewr.ca/meadowlane-pond/save-the-date-november-8-2023-open-house", + "https://www.engagewr.ca/meadowlane-pond/share-your-feedback-on-the-future-design-of-meadowlane-park", + "https://www.engagewr.ca/meadowlane-pond/share-your-feedback-on-the-stormwater-measures", + "https://www.engagewr.ca/meadowlane-pond/survey-deadline-extended-to-dec-15", + "https://www.engagewr.ca/meadowlane-pond/survey-deadline-extended-to-february-12-2023", + "https://www.engagewr.ca/meadowlane-pond/two-weeks-left-to-answer-the-design-survey", + "https://www.engagewr.ca/meadowlane-pond/upgrades-meadowlane-park-begin-construction-early-july", + "https://www.engagewr.ca/meadowlane-pond/video-presentations-now-available", + "https://www.engagewr.ca/meadowlane-pond/what-s-next-for-meadowlane-park", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-about-construction-and-how-we-engaged", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-about-the-final-design-option", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-from-our-first-open-house", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-from-summer-park-drop-ins", + "https://www.engagewr.ca/meadowlane-pond/what-we-heard-from-the-meadowlane-park-survey-and-winter-park-events-2", + "https://www.engagewr.ca/meadowlane-pond/wrapping-up-field-assessment-phase", + "https://www.engagewr.ca/memories-of-galt-arena-gardens", + "https://www.engagewr.ca/merneravenue", + "https://www.engagewr.ca/merneravenue/letter-to-residents", + "https://www.engagewr.ca/mfesp-update", + "https://www.engagewr.ca/mill-race-park-pedestrian-bridges", + "https://www.engagewr.ca/millwood-carlyle-park", + "https://www.engagewr.ca/millwood-carlyle-park/carlyle-park-construction-progressing-schedule", + "https://www.engagewr.ca/millwood-carlyle-park/carlyle-park-final-design-and-construction-summer", + "https://www.engagewr.ca/millwood-carlyle-park/design-survey-closes-this-week", + "https://www.engagewr.ca/millwood-carlyle-park/healthy-yards-webinar-series", + "https://www.engagewr.ca/millwood-carlyle-park/join-us-at-an-open-house-nov-21", + "https://www.engagewr.ca/millwood-carlyle-park/millwood-and-carlyle-parks-open-house-today-share-your-feedback", + "https://www.engagewr.ca/millwood-carlyle-park/missed-the-open-house-answer-our-survey", + "https://www.engagewr.ca/millwood-carlyle-park/new-timeline-carlyle-park-playground-opening", + "https://www.engagewr.ca/millwood-carlyle-park/newsfeed-post", + "https://www.engagewr.ca/millwood-carlyle-park/one-week-until-the-open-house", + "https://www.engagewr.ca/millwood-carlyle-park/open-house-materials-available-share-your-feedback", + "https://www.engagewr.ca/millwood-carlyle-park/please-join-us-at-our-open-house-on-nov-21", + "https://www.engagewr.ca/millwood-carlyle-park/preliminary-concept-from-2016-stormwater-master-plan", + "https://www.engagewr.ca/millwood-carlyle-park/projected-expanded-to-include-carlyle-park", + "https://www.engagewr.ca/millwood-carlyle-park/save-the-date-oct-9-open-house", + "https://www.engagewr.ca/millwood-carlyle-park/stay-tuned-open-house-october-2024", + "https://www.engagewr.ca/millwood-carlyle-park/survey-now-open", + "https://www.engagewr.ca/millwood-carlyle-park/topographic-surveys-taking-place", + "https://www.engagewr.ca/millwood-carlyle-park/two-weeks-left-to-answer-the-design-survey", + "https://www.engagewr.ca/millwood-carlyle-park/what-we-heard-about-the-design-options", + "https://www.engagewr.ca/millwood-carlyle-park/what-we-heard-from-our-first-open-house", + "https://www.engagewr.ca/millwood-carlyle-park/what-we-heard-winter-2023-survey-in-millwood-park-and-carlyle-park", + "https://www.engagewr.ca/mobility-zones-around-ion-stations", + "https://www.engagewr.ca/montgomerycourts", + "https://www.engagewr.ca/montgomerycourts/feedback", + "https://www.engagewr.ca/montgomerycourts/join-us-aug-5-share-feedback-court-improvements", + "https://www.engagewr.ca/montgomerycourts/share-your-feedback-montgomery-park-courts", + "https://www.engagewr.ca/moore-avenue-south-reconstruction", + "https://www.engagewr.ca/moore-avenue-south-reconstruction-1", + "https://www.engagewr.ca/moore-avenue-south-reconstruction-1/notice-reconstruction", + "https://www.engagewr.ca/moore-avenue-south-reconstruction-1/notice-regarding-alterations-and-encroachments-city-boulevards", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/elizabeth-ziegler-school-access-during-construction-2", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/phase-2-construction-update-may-23-to-26", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/project-update-december-8-2023", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/project-update-january-8-2024", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/public-meeting", + "https://www.engagewr.ca/moore-avenue-south-reconstruction/public-meeting-2", + "https://www.engagewr.ca/multi-use-sports-courts-churchill-and-weaver", + "https://www.engagewr.ca/myap-multi-year-accessibility-plan", + "https://www.engagewr.ca/myers-road-reconstruction", + "https://www.engagewr.ca/myers-road-reconstruction/august-2024-update", + "https://www.engagewr.ca/myers-road-reconstruction/june-2024-update", + "https://www.engagewr.ca/myers-road-reconstruction/project-updates", + "https://www.engagewr.ca/neighbourhood-bikeways", + "https://www.engagewr.ca/neighbourhood-chalk", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-cambridge-centre-kiosk", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-cambridge-farmers-market", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-david-durward-centre", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-hespeler-scout-house", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-hespeler-village-market", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-langs", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/community-drop-ins-preston-towne-market", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/office-hour-drop-ins-city-hall", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/office-hour-drop-ins-city-hall-1", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/public-meeting", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/workshop-form-based-residential-zoning", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/workshop-form-based-residential-zoning-1", + "https://www.engagewr.ca/new-comprehensive-zoning-by-law-with-form-based-residential-zoning/workshop-form-based-residential-zoning-2", + "https://www.engagewr.ca/new-housing-rental-units", + "https://www.engagewr.ca/new-housing-rental-units/new-housing-rental-units-82-wilson-ave-rental-units", + "https://www.engagewr.ca/new-housing-rental-units/new-housing-rental-units-drop-in-session", + "https://www.engagewr.ca/new-park-spaces-in-northdale", + "https://www.engagewr.ca/new-website-migration", + "https://www.engagewr.ca/new-wilmot-official-plan", + "https://www.engagewr.ca/newcomer", + "https://www.engagewr.ca/newcomer/story", + "https://www.engagewr.ca/newcomer/survey", + "https://www.engagewr.ca/newcomer/what-were-hearing-emerging-themes-newcomer-engagement", + "https://www.engagewr.ca/noise-by-law-review", + "https://www.engagewr.ca/noise-bylaw-update", + "https://www.engagewr.ca/noise-bylaw-update/draft-report", + "https://www.engagewr.ca/noise-bylaw-update/summary", + "https://www.engagewr.ca/noise-bylaw-update/thanks-for-taking-our-survey", + "https://www.engagewr.ca/northfield-and-weber-h-removal", + "https://www.engagewr.ca/northfield-dr-and-weber-st-n", + "https://www.engagewr.ca/northstrasburgcreek", + "https://www.engagewr.ca/northstrasburgcreek/join-the-virtual-open-house-on-apr-4", + "https://www.engagewr.ca/northstrasburgcreek/one-week-left-to-give-your-feedback", + "https://www.engagewr.ca/northstrasburgcreek/open-house-materials-available-share-your-feedback", + "https://www.engagewr.ca/northstrasburgcreek/virtual-open-house-available-nov-29", + "https://www.engagewr.ca/northstrasburgcreek/virtual-open-house-available-today", + "https://www.engagewr.ca/northstrasburgcreek/virtual-open-house-now-available", + "https://www.engagewr.ca/northstrasburgcreek/virtual-open-house-starts-june-24-2", + "https://www.engagewr.ca/northstrasburgcreek/watch-our-presentation-and-share-your-feedback", + "https://www.engagewr.ca/nostalgia-survey", + "https://www.engagewr.ca/official-plan", + "https://www.engagewr.ca/official-plan-review", + "https://www.engagewr.ca/official-plan-review/background-reports-released-2", + "https://www.engagewr.ca/official-plan-review/charting-woolwich-s-path-forward-environmental-scan-completed-policy-directions-report-on-the-horizon", + "https://www.engagewr.ca/official-plan-review/coming-soon-establishing-a-community-vision-goals", + "https://www.engagewr.ca/official-plan-review/coming-soon-focus-group-sessions", + "https://www.engagewr.ca/official-plan-review/coming-soon-meeting-with-woolwich-seniors-association", + "https://www.engagewr.ca/official-plan-review/council-meeting-update", + "https://www.engagewr.ca/official-plan-review/council-update", + "https://www.engagewr.ca/official-plan-review/exciting-results-from-the-woolwich-official-plan-focus-group-sessions-2", + "https://www.engagewr.ca/official-plan-review/focus-group-sessions-for-stakeholders", + "https://www.engagewr.ca/official-plan-review/meeting-with-the-ontario-federation-of-agriculture", + "https://www.engagewr.ca/official-plan-review/policy-directions-report-releasing-soon", + "https://www.engagewr.ca/official-plan-review/section-26-special-council-meeting", + "https://www.engagewr.ca/official-plan-review/township-s-new-vision", + "https://www.engagewr.ca/official-plan-review/unveiling-the-new-woolwich-official-plan-cover", + "https://www.engagewr.ca/official-plan-review/we-want-to-hear-from-you", + "https://www.engagewr.ca/official-plan-review/woolwich-s-official-plan-in-final-stages-2", + "https://www.engagewr.ca/official-plan/agriculture", + "https://www.engagewr.ca/official-plan/employment", + "https://www.engagewr.ca/official-plan/growth-management", + "https://www.engagewr.ca/older-adult", + "https://www.engagewr.ca/oldmillsps", + "https://www.engagewr.ca/olympic-drive", + "https://www.engagewr.ca/olympic-drive/information-about-upcoming-surface-works", + "https://www.engagewr.ca/olympic-drive/letter-to-residents", + "https://www.engagewr.ca/olympic-drive/project-information-and-questionnaire", + "https://www.engagewr.ca/opa-27-and-westhill-district-plan-amendment", + "https://www.engagewr.ca/ottawa-street-trunk-sanitary-sewer", + "https://www.engagewr.ca/ottawa-street-trunk-sanitary-sewer/construction-begins-april-14-2025", + "https://www.engagewr.ca/ottawa-street-trunk-sanitary-sewer/extended-work-hours-ottawa-street-trunk-sanitary-sewer-construction", + "https://www.engagewr.ca/ourplanforhuron", + "https://www.engagewr.ca/ourplanforhuron/first-forum", + "https://www.engagewr.ca/ourplanforhuron/new-huron-natural-area-survey-and-walking-tour-plus-progress-updates", + "https://www.engagewr.ca/ourplanforhuron/share-your-feedback-through-our-new-self-guided-and-virtual-tours", + "https://www.engagewr.ca/ourplanforhuron/stop1", + "https://www.engagewr.ca/ourplanforhuron/stop10", + "https://www.engagewr.ca/ourplanforhuron/stop11", + "https://www.engagewr.ca/ourplanforhuron/stop2", + "https://www.engagewr.ca/ourplanforhuron/stop3", + "https://www.engagewr.ca/ourplanforhuron/stop4", + "https://www.engagewr.ca/ourplanforhuron/stop5", + "https://www.engagewr.ca/ourplanforhuron/stop6", + "https://www.engagewr.ca/ourplanforhuron/stop7", + "https://www.engagewr.ca/ourplanforhuron/stop8", + "https://www.engagewr.ca/ourplanforhuron/stop9", + "https://www.engagewr.ca/outdoor-shelter", + "https://www.engagewr.ca/outdoor-shelter/community-education-session", + "https://www.engagewr.ca/outdoor-shelter/construction-update", + "https://www.engagewr.ca/outdoor-shelter/erbs-rd-hybrid-shelter-community-meeting-may-6-2026", + "https://www.engagewr.ca/outdoor-shelter/news-and-updates", + "https://www.engagewr.ca/outdoor-shelter/one-year-evaluation-and-recommendation-report-2", + "https://www.engagewr.ca/outdoor-shelter/public-tours", + "https://www.engagewr.ca/outdoor-shelter/update-erbs-road-hybrid-shelter-may-15-2025", + "https://www.engagewr.ca/outdoor-shelter/update-on-erb-s-road-hybrid-shelter-december-11-2024", + "https://www.engagewr.ca/outdoor-shelter/update-on-erb-s-road-hybrid-shelter-october-24-2024", + "https://www.engagewr.ca/oxford-waterloo-road-bridge", + "https://www.engagewr.ca/oxford-waterloo-road-bridge/comments", + "https://www.engagewr.ca/parking", + "https://www.engagewr.ca/parking-ZBA", + "https://www.engagewr.ca/parking/open-house-delayed", + "https://www.engagewr.ca/parkland-strategy", + "https://www.engagewr.ca/parkland-strategy/comments", + "https://www.engagewr.ca/patricia-avenue-reconstruction", + "https://www.engagewr.ca/patricia-avenue-reconstruction/construction-beginning-apr-2", + "https://www.engagewr.ca/patricia-avenue-reconstruction/contractor-introduction-on-street-parking-and-pre-condition-inspection", + "https://www.engagewr.ca/patricia-avenue-reconstruction/detour-map-during-highland-rd-w-intersection-closure", + "https://www.engagewr.ca/patricia-avenue-reconstruction/detour-map-henry-sturm-trail", + "https://www.engagewr.ca/patricia-avenue-reconstruction/notice-of-intersection-work-and-closure-of-highland-rd-w-regional-road", + "https://www.engagewr.ca/patricia-avenue-reconstruction/project-details", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-1-from-henry-sturm-greenway-to-highland-road-e-surface-works-2", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-1-henry-sturm-to-highland-road-w-sod-acceptance-october-2-2023", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-1-sod-placement-on-august-3-2023", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-3-sod-placement", + "https://www.engagewr.ca/patricia-avenue-reconstruction/stage-4-sod-placement", + "https://www.engagewr.ca/patricia-avenue-reconstruction/surface-works-and-driveway-access", + "https://www.engagewr.ca/patricia-avenue-reconstruction/surveyors-in-the-area", + "https://www.engagewr.ca/patricia-avenue-reconstruction/tree-management", + "https://www.engagewr.ca/paving-program", + "https://www.engagewr.ca/pedestrianfirstmarket", + "https://www.engagewr.ca/pedestrianfirstmarket/fall-2023-update", + "https://www.engagewr.ca/pedestrianfirstmarket/project-now-complete", + "https://www.engagewr.ca/pedestrianfirstmarket/updates", + "https://www.engagewr.ca/peel-street-bridge-pedestrian-conversion", + "https://www.engagewr.ca/permanent-indigenous-space", + "https://www.engagewr.ca/permanent-indigenous-space/article", + "https://www.engagewr.ca/petersburg-water-system", + "https://www.engagewr.ca/placesandspaces", + "https://www.engagewr.ca/placesandspaces/infographic-on-kitchener-splashpads-and-water-usage", + "https://www.engagewr.ca/placesandspaces/infographic-on-kitchener-sports-courts-and-sports-fields", + "https://www.engagewr.ca/placesandspaces/join-us-at-the-kitchener-2051-block-party", + "https://www.engagewr.ca/placesandspaces/kitchener-parks-public-engagement-moves-to-pet-use-sponsorship-and-use-of-alternative-spaces", + "https://www.engagewr.ca/placesandspaces/kitchener-seeks-input-to-create-more-inclusive-and-welcoming-parks", + "https://www.engagewr.ca/placesandspaces/lets-play-at-kitcheners-first-ever-downtown-park-pop-up", + "https://www.engagewr.ca/placesandspaces/may-12-places-and-spaces-report-kitchener-city-council-now-available", + "https://www.engagewr.ca/placesandspaces/new-factsheet-on-dogs-in-kitchener", + "https://www.engagewr.ca/placesandspaces/places-and-spaces-kitchener-wants-your-feedback-on-our-parks-and-open-spaces", + "https://www.engagewr.ca/placesandspaces/places-approved-kitchener-city-council", + "https://www.engagewr.ca/placesandspaces/places-report-going-council-apr-14", + "https://www.engagewr.ca/placesandspaces/report-council-rescheduled-may-12", + "https://www.engagewr.ca/placesandspaces/share-your-feedback-on-spaces", + "https://www.engagewr.ca/placesandspaces/share-your-feedback-this-may-on-our-final-topics", + "https://www.engagewr.ca/placesandspaces/share-your-ideas-and-feedback-until-jan-13", + "https://www.engagewr.ca/placesandspaces/share-your-thoughts-on-these-new-topics", + "https://www.engagewr.ca/placesandspaces/spaces-and-parkland-dedication-bylaw-update-june-28-2022", + "https://www.engagewr.ca/placesandspaces/spaces-and-parkland-dedication-update-august-24-2022", + "https://www.engagewr.ca/placesandspaces/spaces-public-consultation-virtual-webinar-may-12-2022-recording", + "https://www.engagewr.ca/placesandspaces/spaces-strategy-to-be-presented-to-council", + "https://www.engagewr.ca/placesandspaces/two-public-question", + "https://www.engagewr.ca/placesandspaces/update-and-next-steps", + "https://www.engagewr.ca/placesandspaces/update-on-spaces-strategy-and-park-dedications", + "https://www.engagewr.ca/placesandspaces/what-makes-a-great-park-places-and-spaces-engagement-phase-2-now-open", + "https://www.engagewr.ca/placesandspaces/winter-update", + "https://www.engagewr.ca/planning-applications-and-projects", + "https://www.engagewr.ca/polocorp-inc", + "https://www.engagewr.ca/posey-line-culvert-replacement", + "https://www.engagewr.ca/prime-ministers-path", + "https://www.engagewr.ca/private-tree-by-law-public-consultation", + "https://www.engagewr.ca/proposed-roundabout-at-dickie-settlement-and-roseville-road", + "https://www.engagewr.ca/proposed-roundabout-at-fischerhallman-and-new-dundee", + "https://www.engagewr.ca/prospectpark", + "https://www.engagewr.ca/prospectpark/healthy-yards-webinar-series", + "https://www.engagewr.ca/prospectpark/join-us-june-18-prospect-park-open-house", + "https://www.engagewr.ca/prospectpark/project-update", + "https://www.engagewr.ca/prospectpark/project-update-2", + "https://www.engagewr.ca/prospectpark/prospect-park-virtual-open-house-now-closed", + "https://www.engagewr.ca/prospectpark/prospect-virtual-open-house-extended-july-6-2025", + "https://www.engagewr.ca/prospectpark/thanks-for-your-questions", + "https://www.engagewr.ca/prospectpark/what-we-heard-and-next-steps", + "https://www.engagewr.ca/queen-street-w-design-assignment", + "https://www.engagewr.ca/queens-boulevard-westmount-to-belmont", + "https://www.engagewr.ca/queens-boulevard-westmount-to-belmont/letter-to-residents", + "https://www.engagewr.ca/queens-bush-road", + "https://www.engagewr.ca/queenvictoria", + "https://www.engagewr.ca/queenvictoria/city-of-kitchener-is-launching-an-initiative-to-determine-the-future-of-the-queen-victoria-statue-2", + "https://www.engagewr.ca/queenvictoria/how-we-will-engage-community-members", + "https://www.engagewr.ca/queenvictoria/key-questions-and-themes-of-ask-jay-anything-session", + "https://www.engagewr.ca/queenvictoria/kitchener-learning-from-phase-1-preparing-for-phase-2-of-queen-victoria-statue-engagement", + "https://www.engagewr.ca/queenvictoria/nov-1-ask-jay-anything-on-instagram-live", + "https://www.engagewr.ca/queenvictoria/nov-24-witnessing-circle-registration-closed", + "https://www.engagewr.ca/queenvictoria/queen-victoria-statue-community-discussion-rescheduled-for-thursday-nov-24", + "https://www.engagewr.ca/queenvictoria/registration-for-the-second-queen-victoria-statue-community-discussion-will-be-rescheduled", + "https://www.engagewr.ca/queenvictoria/report-to-council-dec-16", + "https://www.engagewr.ca/randall-drain-culvert-replacement", + "https://www.engagewr.ca/rbjschlegelpark", + "https://www.engagewr.ca/rbjschlegelpark/construction-complete-washrooms-and-courts-fully-open", + "https://www.engagewr.ca/rbjschlegelpark/courts-closed-oct-5-for-three-weeks", + "https://www.engagewr.ca/rbjschlegelpark/what-we-heard", + "https://www.engagewr.ca/recreation-programming", + "https://www.engagewr.ca/recreation-programming/let-discuss-more", + "https://www.engagewr.ca/redevelopment-of-82-wilson", + "https://www.engagewr.ca/redevelopment-of-82-wilson/construction-timeline-update", + "https://www.engagewr.ca/redevelopment-of-82-wilson/construction-update-fall-2024", + "https://www.engagewr.ca/redevelopment-of-82-wilson/demolition-of-the-existing-building", + "https://www.engagewr.ca/redevelopment-of-82-wilson/neighbourhood-meeting-on-aug-8-2022", + "https://www.engagewr.ca/redevelopment-of-82-wilson/new-affordable-seniors-rental-units-available-82-wilson-ave", + "https://www.engagewr.ca/redevelopment-of-82-wilson/tender-for-builder-awarded", + "https://www.engagewr.ca/region-of-waterloo-international-airport-ykf-master-plan-2023", + "https://www.engagewr.ca/reimaging-wellesley-arena-and-community-centre-lands", + "https://www.engagewr.ca/reimaging-wellesley-arena-and-community-centre-lands/let-us-know-what-youre-thinking", + "https://www.engagewr.ca/rental-housing-incentive", + "https://www.engagewr.ca/rental-housing-incentive/rental-housing-incentive-brochure", + "https://www.engagewr.ca/review-of-adult-entertainment-bylaws", + "https://www.engagewr.ca/review-of-adult-entertainment-bylaws/project-delayed-indefinitely", + "https://www.engagewr.ca/riverland-area-ii-gp-ltd-riverland-area-2-phase-5-breslau", + "https://www.engagewr.ca/road-construction", + "https://www.engagewr.ca/roadreconstruction", + "https://www.engagewr.ca/roadreconstruction/2022-completed-projects", + "https://www.engagewr.ca/roadreconstruction/2023-completed-projects", + "https://www.engagewr.ca/roadreconstruction/completed-projects-2024", + "https://www.engagewr.ca/roadside-tree-planting", + "https://www.engagewr.ca/rockway", + "https://www.engagewr.ca/rockway-fairway", + "https://www.engagewr.ca/rockway/criteria-new-older-adult-facility-approved-council", + "https://www.engagewr.ca/rockway/how-to-get-involved", + "https://www.engagewr.ca/rockway/thank-you-for-taking-part", + "https://www.engagewr.ca/rockway/what-we-heard", + "https://www.engagewr.ca/rosemount-islington-sherwood", + "https://www.engagewr.ca/rosemount-islington-sherwood/introduction-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/letter-to-residents", + "https://www.engagewr.ca/rosemount-islington-sherwood/project-information-and-first-public-engagement", + "https://www.engagewr.ca/rosemount-islington-sherwood/reconnection-letter-2024-construction", + "https://www.engagewr.ca/rosemount-islington-sherwood/sherwood-avenue-krug-to-suffolk-stage-3-sod-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/sherwood-islington-and-rosemount-stage-1-sod-placement", + "https://www.engagewr.ca/rosemount-islington-sherwood/sod-placement-notice", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-1-sod-acceptance-letter-2", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-2-acceptance-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-2-sod-placement-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-2-surface-works-and-driveway-access-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-3-surface-works-and-driveway-access-letter", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-5-road-reconstruction-of-islington-avenue", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-5-sod-care-now-shifts-property-owners-islington-avenue", + "https://www.engagewr.ca/rosemount-islington-sherwood/stage-5-sod-placement-notice", + "https://www.engagewr.ca/rosemount-islington-sherwood/surface-works-and-driveway-access-sherwood-islington-and-rosemount-reconstruction-stage-1", + "https://www.engagewr.ca/roseville-road-edworthy-side-road-roundabout", + "https://www.engagewr.ca/rossfordcrescent", + "https://www.engagewr.ca/rossfordcrescent/cold-weather-temporary-water-supply", + "https://www.engagewr.ca/rossfordcrescent/contractor-intro-and-pre-condition-survey-information", + "https://www.engagewr.ca/rossfordcrescent/letter-to-residents", + "https://www.engagewr.ca/rossfordcrescent/rossford-stage-1", + "https://www.engagewr.ca/rossfordcrescent/stage-1-construction-rossford-south-leg-markwood-to-gzowski-park-entrance-scheduled-to-start-week-of-july-4-2022", + "https://www.engagewr.ca/rossfordcrescent/update-on-project-status-for-phase-2", + "https://www.engagewr.ca/rossfordcrescent/update-on-project-status-for-stage-1", + "https://www.engagewr.ca/rossfordcrescent/update-on-project-status-for-stage-1-2", + "https://www.engagewr.ca/roundabout-safety", + "https://www.engagewr.ca/rowlibraryreview", + "https://www.engagewr.ca/roy-schmidt-rd-and-conservation-dr", + "https://www.engagewr.ca/rusholme-road-westmount-road-dunbar-road", + "https://www.engagewr.ca/rusholme-road-westmount-road-dunbar-road/surveyors-neighbourhood", + "https://www.engagewr.ca/sanitary-master-plan", + "https://www.engagewr.ca/sanitary-master-plan/notice-of-completion-environmental-assessment-study", + "https://www.engagewr.ca/sanitary-master-plan/notice-of-online-public-consultation-centre", + "https://www.engagewr.ca/sanitary-master-plan/notice-of-public-consultation-centre", + "https://www.engagewr.ca/sanitary-master-plan/notice-of-study-commencement", + "https://www.engagewr.ca/sanitary-master-plan/sanitary-master-plan-complete", + "https://www.engagewr.ca/sanitarymasterplan", + "https://www.engagewr.ca/sanitarymasterplan/city-of-kitchener-approves-integrated-sanitary-master-plan-asks-residents-to-do-their-part-to-keep-our-pipes-clear-2", + "https://www.engagewr.ca/sanitarymasterplan/integrated-sanitary-master-plan-complete", + "https://www.engagewr.ca/sanitarymasterplan/integrated-sanitary-master-plan-virtual-public-information-centre-will-start-on-december-6-2023", + "https://www.engagewr.ca/sanitarymasterplan/join-the-virtual-public-information-centre-2-city-of-kitchener-integrated-master-plan-starting-today", + "https://www.engagewr.ca/sanitarymasterplan/notice-of-study-commencement-integrated-sanitary-master-plan", + "https://www.engagewr.ca/sanitarymasterplan/notice-of-virtual-public-information-centre-1-city-of-kitchener-integrated-sanitary-master-plan", + "https://www.engagewr.ca/sanitarymasterplan/reformatted-virtual-public-information-centre", + "https://www.engagewr.ca/sanitarymasterplan/summary-report-for-first-pic-now-available", + "https://www.engagewr.ca/sanitarymasterplan/summary-report-for-second-pic-now-available", + "https://www.engagewr.ca/sanitarymasterplan/virtual-public-information-centre-1", + "https://www.engagewr.ca/sanitarymasterplan/virtual-public-information-centre-2", + "https://www.engagewr.ca/sawmill-road-and-ebycrest-road", + "https://www.engagewr.ca/schaefer-reconstruction", + "https://www.engagewr.ca/schaefer-reconstruction-1", + "https://www.engagewr.ca/schaefer-reconstruction-1/project-information", + "https://www.engagewr.ca/schaefer-reconstruction/project-information", + "https://www.engagewr.ca/scheifele-bridge-superstructure-replacement", + "https://www.engagewr.ca/scheifele-bridge-superstructure-replacement/november-2023-update", + "https://www.engagewr.ca/schlegel-urban-developments-corp", + "https://www.engagewr.ca/schlegel-urban-developments-corp-1", + "https://www.engagewr.ca/schneider-creek-path", + "https://www.engagewr.ca/schneider-creek-path/engagement-period-extended", + "https://www.engagewr.ca/schneidercreekea", + "https://www.engagewr.ca/schneidercreekea/first-public-information-centre-materials-now-available", + "https://www.engagewr.ca/schneidercreekea/first-public-information-centre-tomorrow", + "https://www.engagewr.ca/schneidercreekea/frequently-asked-questions-posted", + "https://www.engagewr.ca/schneidercreekea/notice-of-commencement-and-public-information-centre", + "https://www.engagewr.ca/schneidercreekea/notice-of-completion", + "https://www.engagewr.ca/schneidercreekea/project-update-from-the-second-public-information-centre-2", + "https://www.engagewr.ca/schneidercreekea/share-your-feedback-until-jan-1-2024", + "https://www.engagewr.ca/schneidercreekea/tell-us-what-you-think", + "https://www.engagewr.ca/schneidercreekea/upcoming-public-information-centre", + "https://www.engagewr.ca/schneidercreekea/upcoming-public-information-centre-3", + "https://www.engagewr.ca/schneidercreekea/what-we-heard-at-the-third-public-information-centre", + "https://www.engagewr.ca/schneidershoemakercreeks", + "https://www.engagewr.ca/schneidershoemakercreeks/design-presentation-materials-delayed-to-dec-2", + "https://www.engagewr.ca/schneidershoemakercreeks/presentation-now-available", + "https://www.engagewr.ca/schneidershoemakercreeks/schneider-creek-and-shoemaker-creek-design-presentation-available-on-november-25", + "https://www.engagewr.ca/schneidershoemakercreeks/soil-and-groundwater-testing-this-fall", + "https://www.engagewr.ca/schneidershoemakercreeks/technical-difficulties-design-presentation-delayed", + "https://www.engagewr.ca/search", + "https://www.engagewr.ca/secondavenue", + "https://www.engagewr.ca/secondavenue/construction-postponed-to-2023", + "https://www.engagewr.ca/secondavenue/final-project-design-details-2", + "https://www.engagewr.ca/secondavenue/introduction-and-precondition-survey", + "https://www.engagewr.ca/secondavenue/letter-to-residents", + "https://www.engagewr.ca/secondavenue/second-avenue-driveway-access-concrete-works", + "https://www.engagewr.ca/secondavenue/second-avenue-stage-one-sod-end-of-warranty-letter", + "https://www.engagewr.ca/secondavenue/second-avenue-stage-two-sod-end-of-warranty-letter", + "https://www.engagewr.ca/secondavenue/second-avenue-stage-two-sod-start-of-warranty-letter", + "https://www.engagewr.ca/secondavenue/sod-start-of-warranty-stage-one", + "https://www.engagewr.ca/sewer-use-bylaw-update", + "https://www.engagewr.ca/shakespeare-drive-reconstruction", + "https://www.engagewr.ca/shakespeare-drive-reconstruction/notice-reconstruction", + "https://www.engagewr.ca/shared-micromobility-program", + "https://www.engagewr.ca/shoemakergreenway", + "https://www.engagewr.ca/shoemakergreenway/construction-starting-soon-at-shoemaker-greenway-park", + "https://www.engagewr.ca/shoemakergreenway/forum", + "https://www.engagewr.ca/shoemakergreenway/now-available-information-session-recording", + "https://www.engagewr.ca/shoemakergreenway/previous-page-content-fall-2021", + "https://www.engagewr.ca/shoemakergreenway/previous-page-content-summer-2021", + "https://www.engagewr.ca/shoemakergreenway/shoemaker-greenway-park-phase-2-engagement-summary", + "https://www.engagewr.ca/shoemakergreenway/update-on-shoemaker-greenway", + "https://www.engagewr.ca/shorttermrentals", + "https://www.engagewr.ca/shorttermrentals/council-decides-against-licensing-short-term-rentals", + "https://www.engagewr.ca/shorttermrentals/short-term-rental-bylaw-report-goes-council-june-2", + "https://www.engagewr.ca/sidewalkdesigns", + "https://www.engagewr.ca/snowplow", + "https://www.engagewr.ca/snowplow/announcing-the-winning-names", + "https://www.engagewr.ca/snowplow/help-us-name-our-snow-plows-for-next-winter", + "https://www.engagewr.ca/snowplow/public-works-week", + "https://www.engagewr.ca/snowplow/voting-now-open", + "https://www.engagewr.ca/snowplow2024", + "https://www.engagewr.ca/snowplow2024/meet-the-plows-on-may-23", + "https://www.engagewr.ca/snowplow2024/voting-open-until-mar-4", + "https://www.engagewr.ca/snowplow2024/winning-names-announced", + "https://www.engagewr.ca/snyder-s-road-waterloo-street-nafziger-road-roundabout", + "https://www.engagewr.ca/snyders-road-west-and-foundry-street-reconstruction", + "https://www.engagewr.ca/snyders-road-west-and-foundry-street-reconstruction/snydersrd-update", + "https://www.engagewr.ca/soler", + "https://www.engagewr.ca/soperpark", + "https://www.engagewr.ca/southdaleavenue", + "https://www.engagewr.ca/southdaleavenue/city-acceptance-of-sod", + "https://www.engagewr.ca/southdaleavenue/contractor-intro", + "https://www.engagewr.ca/southdaleavenue/contractor-introduction", + "https://www.engagewr.ca/southdaleavenue/letter-to-residents", + "https://www.engagewr.ca/southdaleavenue/sod-placement-on-may-10-2023", + "https://www.engagewr.ca/southdaleavenue/surface-works", + "https://www.engagewr.ca/southdaleavenue/update-on-project-status-december-2022", + "https://www.engagewr.ca/spadina-road-west-patricia-avenue-belmont-avenue-west", + "https://www.engagewr.ca/spadina-road-west-patricia-avenue-belmont-avenue-west/surveyors-area", + "https://www.engagewr.ca/speed-management", + "https://www.engagewr.ca/speed-management/approved-30km-speed-limit-for-residential-streets", + "https://www.engagewr.ca/speed-management/approved-speed-management-plan", + "https://www.engagewr.ca/speed-management/estimated-travel-time", + "https://www.engagewr.ca/speed-management/project-background", + "https://www.engagewr.ca/speed-management/proposed-30-kmh-implementation-plan", + "https://www.engagewr.ca/speed-management/speed-limit-options", + "https://www.engagewr.ca/sportsparades", + "https://www.engagewr.ca/sportsparades/how-to-share-your-feedback-and-ideas", + "https://www.engagewr.ca/sportsparades/moving-forward-sports-parades-history", + "https://www.engagewr.ca/sportsparades/sports-parades-history-what-we-heard", + "https://www.engagewr.ca/st-george-street", + "https://www.engagewr.ca/st-george-street/construction-begins-sept-16-2024", + "https://www.engagewr.ca/st-george-street/letter-to-residents", + "https://www.engagewr.ca/st-george-street/sod-acceptance-notice", + "https://www.engagewr.ca/st-george-street/sod-placement", + "https://www.engagewr.ca/st-george-street/surface-works-notice-nov-7-to-8", + "https://www.engagewr.ca/st-moritz-park", + "https://www.engagewr.ca/st-moritz-park/earth-day-kickoff", + "https://www.engagewr.ca/st-moritz-park/get-ready", + "https://www.engagewr.ca/st-moritz-park/ideas", + "https://www.engagewr.ca/st-moritz-park/survey", + "https://www.engagewr.ca/st-moritz-park/what-we-learned", + "https://www.engagewr.ca/station-area-mixed-use-employment-zone", + "https://www.engagewr.ca/stirling-and-courtland-culvert", + "https://www.engagewr.ca/stirling-and-courtland-culvert/construction-extended-to-december-2023", + "https://www.engagewr.ca/stirling-and-courtland-culvert/contractor-introduction-and-project-start-details", + "https://www.engagewr.ca/stirling-and-courtland-culvert/update-on-bridge-rehabilitation-project", + "https://www.engagewr.ca/stirling-avenue-south", + "https://www.engagewr.ca/stirling-avenue-south/letter-to-residents", + "https://www.engagewr.ca/stirling-avenue-south/questionnaire-now-open", + "https://www.engagewr.ca/stirlingavenuesouth", + "https://www.engagewr.ca/stirlingavenuesouth/letter-to-residents", + "https://www.engagewr.ca/stirlingavenuesouth/stirling-and-homer-watson-is-now-open", + "https://www.engagewr.ca/stjacobswastewater", + "https://www.engagewr.ca/stjacobswastewater/stjacobs-WWTP-public-meeting-1", + "https://www.engagewr.ca/strasburg-new-dundee-road-roundabout", + "https://www.engagewr.ca/strategic-plan-wilmot", + "https://www.engagewr.ca/survivor-garden", + "https://www.engagewr.ca/sydneyavenue", + "https://www.engagewr.ca/sydneyavenue/contractor-introduction-parking-and-pre-condition-inspection", + "https://www.engagewr.ca/sydneyavenue/letter-to-residents", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-reconnection-letter", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-reconnection-letter-2", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-stage-one-end-of-warranty-letter", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-stage-two-sod-start-of-warranty-letter", + "https://www.engagewr.ca/sydneyavenue/sydney-street-north-start-of-sod-warranty-stage-one", + "https://www.engagewr.ca/taxi-bylaw-review", + "https://www.engagewr.ca/trac", + "https://www.engagewr.ca/trac/participation-in-trac-meetings", + "https://www.engagewr.ca/transportation-and-mobility-master-plan", + "https://www.engagewr.ca/trillium-valley-park-pond-48", + "https://www.engagewr.ca/trillium-valley-park-pond-48/construction-update", + "https://www.engagewr.ca/trussler-road", + "https://www.engagewr.ca/udm-refresh", + "https://www.engagewr.ca/udm-refresh/amendments-adopted", + "https://www.engagewr.ca/union-reconstruction", + "https://www.engagewr.ca/union-reconstruction/additional-project-questions-and-answers", + "https://www.engagewr.ca/union-reconstruction/construction-planning-update", + "https://www.engagewr.ca/union-reconstruction/delay-to-start-of-construction", + "https://www.engagewr.ca/union-reconstruction/design-alternatives-for-union-street-east-reconstruction", + "https://www.engagewr.ca/union-reconstruction/july-2023-project-update", + "https://www.engagewr.ca/union-reconstruction/new-union-street-design-update", + "https://www.engagewr.ca/union-reconstruction/project-update-march-1-2024", + "https://www.engagewr.ca/union-reconstruction/project-update-may-2025", + "https://www.engagewr.ca/victoria-boullee-reconstruction", + "https://www.engagewr.ca/victoria-boullee-reconstruction/boullee-st-closure", + "https://www.engagewr.ca/victoria-street-improvements-kitchener", + "https://www.engagewr.ca/victoria-street-improvements-kitchener/construction-start-july-16-2025", + "https://www.engagewr.ca/victoria-street-modifications", + "https://www.engagewr.ca/victoriaparkmp", + "https://www.engagewr.ca/victoriaparkmp/did-we-miss-anything", + "https://www.engagewr.ca/victoriaparkmp/help-shape-future-victoria-park", + "https://www.engagewr.ca/victoriaparkmp/how-we-will-develop-the-master-plan-2", + "https://www.engagewr.ca/victoriaparkmp/map", + "https://www.engagewr.ca/victoriaparkmp/new-innovative-technology-helps-guide-the-future-of-victoria-park-2", + "https://www.engagewr.ca/victoriaparkmp/new-topic-feedback-thank-you-event-august-30", + "https://www.engagewr.ca/victoriaparkmp/phase-2-engagement-update", + "https://www.engagewr.ca/victoriaparkmp/sensors-in-victoria-park", + "https://www.engagewr.ca/victoriaparkmp/story", + "https://www.engagewr.ca/victoriaparkmp/usersurvey", + "https://www.engagewr.ca/visionzero", + "https://www.engagewr.ca/visionzero/2024-hot-spot-improvements", + "https://www.engagewr.ca/visionzero/city-s-vision-zero-strategy-succeeding-in-creating-safer-streets", + "https://www.engagewr.ca/visionzero/city-seeks-feedback-on-plans-to-increase-road-safety", + "https://www.engagewr.ca/visionzero/draft-vision-zero-strategy-to-go-to-council-dec-6", + "https://www.engagewr.ca/visionzero/kitchener-council-approves-a-new-vision-for-safer-streets", + "https://www.engagewr.ca/visionzero/kitchener-launches-vision-zero-street-safety-education-campaign", + "https://www.engagewr.ca/visionzero/kitchener-makes-progress-towards-vision-zero-goal", + "https://www.engagewr.ca/visionzero/kitcheners-streets-are-slower-safer-vision-zero-work-continues", + "https://www.engagewr.ca/visionzero/new-vision-zero-dashboard-and-ask-us-a-question", + "https://www.engagewr.ca/visionzero/share-your-driving-and-street-safety-tips", + "https://www.engagewr.ca/visionzero/traffic-collisions-are-not-accidents", + "https://www.engagewr.ca/visionzero/vision-zero-survey-launches", + "https://www.engagewr.ca/voisinbordencreeks", + "https://www.engagewr.ca/voisinbordencreeks/creek-restoration-and-tree-removals", + "https://www.engagewr.ca/voisinbordencreeks/join-the-smart-yards-walking-tour-at-the-open-house", + "https://www.engagewr.ca/voisinbordencreeks/open-house-materials-available-share-your-feedback", + "https://www.engagewr.ca/voisinbordencreeks/please-join-us-at-our-open-house-on-may-22", + "https://www.engagewr.ca/voisinbordencreeks/what-we-heard-about-the-design-options", + "https://www.engagewr.ca/ward2parknetwork", + "https://www.engagewr.ca/ward2parknetwork/city-of-kitchener-looking-for-feedback-on-a-parks-network-in-idlewood-area", + "https://www.engagewr.ca/ward2parknetwork/construction-complete-opening-celebration-sept-27", + "https://www.engagewr.ca/ward2parknetwork/final-park-concepts-open-house-scheduled-december-13th", + "https://www.engagewr.ca/ward2parknetwork/final-park-designs-and-open-house-presentation-boards", + "https://www.engagewr.ca/ward2parknetwork/kinzie-and-oaten-parks-open-construction-on-idlewood-starts-mid-july", + "https://www.engagewr.ca/ward2parknetwork/kinzie-park-playground-is-moving-to-the-other-side", + "https://www.engagewr.ca/ward2parknetwork/oaten-park-construction-update", + "https://www.engagewr.ca/ward2parknetwork/project-update", + "https://www.engagewr.ca/ward2parknetwork/project-update-construction-to-begin-at-oaten-park", + "https://www.engagewr.ca/ward2parknetwork/reaching-out-for-final-thoughts", + "https://www.engagewr.ca/ward2parknetwork/second-consultation-open-for-idlewood-kinzie-oaten-park-network", + "https://www.engagewr.ca/ward2parknetwork/summer-2024-update", + "https://www.engagewr.ca/ward2parknetwork/video-of-park-designs-now-available", + "https://www.engagewr.ca/waterloo-budget-2024-2026", + "https://www.engagewr.ca/waterloo-budget-2024-2026/budget-community-engagement-update", + "https://www.engagewr.ca/waterloo-budget-2024-2026/budget-pressures-and-opportunities", + "https://www.engagewr.ca/waterloo-budget-2024-2026/city-of-waterloo-budget-day-is-monday-february-12-2024", + "https://www.engagewr.ca/waterloo-budget-2024-2026/efficiencies-and-improvements", + "https://www.engagewr.ca/waterloo-budget-2024-2026/faq-why-can-t-the-city-keep-tax-increases-to-the-rate-of-inflation", + "https://www.engagewr.ca/waterloo-budget-2024-2026/fire-prevention-education-and-response-for-community-safety", + "https://www.engagewr.ca/waterloo-budget-2024-2026/how-the-budget-works", + "https://www.engagewr.ca/waterloo-budget-2024-2026/investing-in-active-transportation-infrastructure", + "https://www.engagewr.ca/waterloo-budget-2024-2026/minimizing-the-financial-impact", + "https://www.engagewr.ca/waterloo-budget-2024-2026/more-sidewalk-clearing-to-improve-winter-mobility-for-everyone", + "https://www.engagewr.ca/waterloo-budget-2024-2026/planning-for-affordable-housing", + "https://www.engagewr.ca/waterloo-budget-2024-2026/strategic-stories", + "https://www.engagewr.ca/waterloo-budget-2024-2026/transforming-our-facilities-for-net-zero", + "https://www.engagewr.ca/waterloo-budget-2024-2026/transitioning-from-web-content-to-digital-service", + "https://www.engagewr.ca/waterloo-haf-initiative-1", + "https://www.engagewr.ca/waterloo-haf-initiative-1/city-is", + "https://www.engagewr.ca/waterloo-haf-initiative-1/city-owned-lands-for-affordable-housing", + "https://www.engagewr.ca/waterloo-haf-initiative-1/city-waterloo-finalizes-land-transfer-habitat-humanitybuild-now-one-canadas-largest-affordable-housing-projects", + "https://www.engagewr.ca/waterloo-haf-initiative-1/community-feedback-and-next-steps", + "https://www.engagewr.ca/waterloo-haf-initiative-1/council-identifies-habitat-for-humanity-build-now-as-preferred-candidate-for-the-affordable-and-attainable-housing-development-a", + "https://www.engagewr.ca/waterloo-haf-initiative-1/mzo-has-been-posted", + "https://www.engagewr.ca/waterloo-haf-initiative-1/public-meeting-2", + "https://www.engagewr.ca/waterloo-haf-initiative-1/request-for-a-minister-s-zoning-order-at-2025-university-avenue-east-is-granted", + "https://www.engagewr.ca/waterloo-haf-initiative-2", + "https://www.engagewr.ca/waterloo-haf-initiative-2/city-updated-official-plan-and-zoning-law", + "https://www.engagewr.ca/waterloo-haf-initiative-3", + "https://www.engagewr.ca/waterloo-haf-initiative-3/council-have-directed-next-steps", + "https://www.engagewr.ca/waterloo-haf-initiative-3/gsp-group-retained-prepare-medium-rise-plan-sugarbush-south", + "https://www.engagewr.ca/waterloo-haf-initiative-3/july-18-virtual-neighbourhood-meeting-2", + "https://www.engagewr.ca/waterloo-haf-initiative-3/meeting-august-15-2024", + "https://www.engagewr.ca/waterloo-haf-initiative-4", + "https://www.engagewr.ca/waterloo-haf-initiative-5", + "https://www.engagewr.ca/waterloo-haf-initiative-6", + "https://www.engagewr.ca/waterloo-haf-initiative-6/additional-residential-unit-grant-program-goes-council", + "https://www.engagewr.ca/waterloo-haf-initiative-6/enable-four-units-and-four-storeys-low-density-residential-properties", + "https://www.engagewr.ca/waterloo-haf-initiative-7", + "https://www.engagewr.ca/waterloo-haf-initiative-7/august-7-public-engagement-session", + "https://www.engagewr.ca/waterloo-haf-initiative-7/official-plan-policies-approved", + "https://www.engagewr.ca/waterloo-haf-initiative-7/presentation-and-video-recording-january-22-public-engagement-session", + "https://www.engagewr.ca/waterloo-haf-initiative-7/presentation-and-video-recording-july-22-public-engagement-session-are-available", + "https://www.engagewr.ca/waterloo-haf-initiative-7/project-update-dec-19-2024", + "https://www.engagewr.ca/waterloo-haf-initiative-7/public-engagement-summary", + "https://www.engagewr.ca/waterloo-haf-initiative-7/public-information-session", + "https://www.engagewr.ca/waterloo-haf-initiative-7/second-drafts-released", + "https://www.engagewr.ca/waterloo-haf-initiative-8", + "https://www.engagewr.ca/waterloo-haf-initiative-8/council-approves-city-staffs-intention-grant-additional-parking-reductions-affordable-housing-provider", + "https://www.engagewr.ca/waterloo-haf-initiative-8/informal-public-meeting-june-23-2025", + "https://www.engagewr.ca/waterloo-heritage-register-review", + "https://www.engagewr.ca/waterloo-heritage-register-review/council-supports-5-notices-intention-designate", + "https://www.engagewr.ca/waterloo-heritage-register-review/public-meeting-scheduled-monday-february-24-2025", + "https://www.engagewr.ca/waterloo-improvement-plan", + "https://www.engagewr.ca/waterloo-improvement-plan/survey", + "https://www.engagewr.ca/waterloo-official-plan", + "https://www.engagewr.ca/waterloo-official-plan/beechwood-park-cultural-heritage-landscape-review", + "https://www.engagewr.ca/waterloo-official-plan/city-growth-structure-and-form", + "https://www.engagewr.ca/waterloo-official-plan/commercial-and-employment-policy-study-review-draft-summary-report", + "https://www.engagewr.ca/waterloo-official-plan/draft-updated-official-plan-june-2024", + "https://www.engagewr.ca/waterloo-official-plan/economic-development-and-innovation", + "https://www.engagewr.ca/waterloo-official-plan/environment-and-climate-change", + "https://www.engagewr.ca/waterloo-official-plan/housing-affordability-and-equity", + "https://www.engagewr.ca/waterloo-official-plan/neighbourhoods-communities-and-culture", + "https://www.engagewr.ca/waterloo-official-plan/notice-public-open-house-and-public-meeting", + "https://www.engagewr.ca/waterloo-official-plan/official-plan-amendment-58-posted-environmental-registry-ontario", + "https://www.engagewr.ca/waterloo-official-plan/official-plan-issue-briefs", + "https://www.engagewr.ca/waterloo-official-plan/official-plan-review-library-pop-up-sessions", + "https://www.engagewr.ca/waterloo-official-plan/opa-58-official-plan-review-phase-1-adopted-by-city-council-2", + "https://www.engagewr.ca/waterloo-official-plan/planning-processes-and-public-consultation", + "https://www.engagewr.ca/waterloo-official-plan/public-open-house-june-17-2021", + "https://www.engagewr.ca/waterloo-official-plan/retail-habits-survey", + "https://www.engagewr.ca/waterloo-official-plan/special-public-meeting-for-official-plan-review", + "https://www.engagewr.ca/waterloo-official-plan/transportation-and-mobility", + "https://www.engagewr.ca/waterloo-official-plan/understanding-planning-in-waterloo", + "https://www.engagewr.ca/waterloo-official-plan/updated-official-plan-review-phase-1-official-plan-amendment-58", + "https://www.engagewr.ca/waterloo-official-plan/vision-and-strategic-plan", + "https://www.engagewr.ca/waterloo-park", + "https://www.engagewr.ca/waterloo-park-circuit", + "https://www.engagewr.ca/waterloo-park-circuit/council-approves-phase-1", + "https://www.engagewr.ca/waterloo-park-circuit/join-the-conversation", + "https://www.engagewr.ca/waterloo-park-circuit/open-house-info", + "https://www.engagewr.ca/waterloo-park/colouring", + "https://www.engagewr.ca/waterloo-park/previous-plan", + "https://www.engagewr.ca/waterloo-rental", + "https://www.engagewr.ca/waterloo-rental/bylaw-updated", + "https://www.engagewr.ca/waterloo-rental/proposed-rental-apartment-bylaw", + "https://www.engagewr.ca/waterloo-rental/short-term-rentals-info-session", + "https://www.engagewr.ca/waterloo-rental/survey-closed", + "https://www.engagewr.ca/waterloo-rental/thank-you-for-sharing-your-feedback-with-us", + "https://www.engagewr.ca/waterloo-rental/what-we-learned", + "https://www.engagewr.ca/waterloo-rental/what-we-learned-and-next-steps", + "https://www.engagewr.ca/waterloo-st-reconstruction", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-1", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-2", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-3", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-4", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-5", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-6", + "https://www.engagewr.ca/waterloo-st-reconstruction/construction-update-7", + "https://www.engagewr.ca/waterloo-st-reconstruction/landscape-encroachments-on-city-boulevards", + "https://www.engagewr.ca/waterloo-st-reconstruction/leaf-collection", + "https://www.engagewr.ca/waterloo-st-reconstruction/loose-leaf-collection", + "https://www.engagewr.ca/waterloo-st-reconstruction/notice-regarding-preservation-of-on-street-parking-on-waterloo-street-after-reconstruction", + "https://www.engagewr.ca/waterloo-st-reconstruction/notice-regarding-the-removal-of-on-street-parking-from-waterloo-street-following-construction", + "https://www.engagewr.ca/waterloo-st-reconstruction/phase-2-construction-update-may-23-to-26", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-december-15-2023", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-december-8-2023", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-delayed-start-of-construction", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-delayed-start-of-construction-2", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-for-may-31-2024", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-for-may-6-2024", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-march-15-2024", + "https://www.engagewr.ca/waterloo-st-reconstruction/project-update-tree-removal-and-pruning", + "https://www.engagewr.ca/waterloo-st-reconstruction/public-meeting", + "https://www.engagewr.ca/waterloo/development-planning", + "https://www.engagewr.ca/waterloocycling", + "https://www.engagewr.ca/waterloohafactions", + "https://www.engagewr.ca/watersupply", + "https://www.engagewr.ca/wateryoungproject", + "https://www.engagewr.ca/wayfinding", + "https://www.engagewr.ca/wayfinding/how-to-get-involved", + "https://www.engagewr.ca/wayfinding/what-we-heard-about-wayfinding-and-branding-walking-cycling-and-rolling", + "https://www.engagewr.ca/wbtrail", + "https://www.engagewr.ca/weigel-SWM-Pond", + "https://www.engagewr.ca/weigel-drain-headwall-project", + "https://www.engagewr.ca/wellesleywater", + "https://www.engagewr.ca/west-montrose", + "https://www.engagewr.ca/west-montrose/construction-starting-august-11", + "https://www.engagewr.ca/west-montrose/project-update-august-2024", + "https://www.engagewr.ca/westheightspark", + "https://www.engagewr.ca/westheightspark/join-us-at-a-community-workshop-on-nov-26", + "https://www.engagewr.ca/westheightspark/join-us-june-3-community-walk-and-talk-westheights-park", + "https://www.engagewr.ca/westheightspark/workshop-june-5-learn-more-and-share-your-vision", + "https://www.engagewr.ca/westheightspark/workshop-materials-now-available-comment-until-july-19", + "https://www.engagewr.ca/westhill", + "https://www.engagewr.ca/westhill/project-updates", + "https://www.engagewr.ca/westwood-drive", + "https://www.engagewr.ca/westwood-drive/letter-to-residents", + "https://www.engagewr.ca/westwood-drive/public-information-and-questionnaire", + "https://www.engagewr.ca/westwoodpark", + "https://www.engagewr.ca/westwoodpark/construction-delayed-2", + "https://www.engagewr.ca/westwoodpark/construction-start", + "https://www.engagewr.ca/westwoodpark/new-frequently-asked-questions", + "https://www.engagewr.ca/westwoodpark/new-pet-waste-containers", + "https://www.engagewr.ca/westwoodpark/new-time-sept-19-park-opening-celebration-at-4-p-m", + "https://www.engagewr.ca/westwoodpark/next-steps-hydroseeding-and-planting", + "https://www.engagewr.ca/westwoodpark/online-forum", + "https://www.engagewr.ca/westwoodpark/phase-2-construction-2", + "https://www.engagewr.ca/westwoodpark/phase-2-construction-work-is-now-underway", + "https://www.engagewr.ca/westwoodpark/playground-now-open", + "https://www.engagewr.ca/westwoodpark/previous-page-content-summer-2021", + "https://www.engagewr.ca/westwoodpark/save-the-date-sept-19", + "https://www.engagewr.ca/westwoodpark/second-phase-of-construction-begins-in-june", + "https://www.engagewr.ca/westwoodpark/update-on-phase-1", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park-2", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park-3", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park-4", + "https://www.engagewr.ca/westwoodpark/update-on-westwood-park-construction", + "https://www.engagewr.ca/westwoodpark/watch-construction-progress", + "https://www.engagewr.ca/westwoodpark/westwood-park-construction-complete", + "https://www.engagewr.ca/westwoodpark/westwood-park-construction-progressing-on-schedule", + "https://www.engagewr.ca/white-elm-park", + "https://www.engagewr.ca/white-elm-park/construction-complete", + "https://www.engagewr.ca/white-elm-park/construction-starting-soon", + "https://www.engagewr.ca/white-elm-park/survey-closed", + "https://www.engagewr.ca/white-elm-park/vote-on-your-favourite-playground-design", + "https://www.engagewr.ca/white-elm-park/what-we-heard-about-the-white-elm-playground", + "https://www.engagewr.ca/white-elm-park/winning-playground-design", + "https://www.engagewr.ca/wilfred-and-prospect", + "https://www.engagewr.ca/wilfred-and-prospect/letter-to-residents", + "https://www.engagewr.ca/wilfred-and-prospect/questionnaire-now-open", + "https://www.engagewr.ca/wilmot-citizen-of-the-year-2025", + "https://www.engagewr.ca/wilsonavenue", + "https://www.engagewr.ca/wilsonavenue/construction-introduction-letter", + "https://www.engagewr.ca/wilsonavenue/newspost", + "https://www.engagewr.ca/wilsonavenue/public-information-and-questionnaire-2", + "https://www.engagewr.ca/wilsonavenue/stage-3a-surface-works-begin-nov-2024", + "https://www.engagewr.ca/wilsonavenue/surface-works-begin-sept-30-2024", + "https://www.engagewr.ca/wilsonvaniertraynor", + "https://www.engagewr.ca/wilsonvaniertraynor/april-20-construction-in-vanier-park", + "https://www.engagewr.ca/wilsonvaniertraynor/construction-at-vanier-and-traynor-parks-is-complete", + "https://www.engagewr.ca/wilsonvaniertraynor/construction-starting-soon-at-vanier-park-and-traynor-park", + "https://www.engagewr.ca/wilsonvaniertraynor/final-concepts-and-project-update", + "https://www.engagewr.ca/wilsonvaniertraynor/how-should-we-include-a-willow-log-in-the-new-wilson-park-seating-area", + "https://www.engagewr.ca/wilsonvaniertraynor/how-we-used-the-willow-trees-in-the-new-wilson-park-seating-area", + "https://www.engagewr.ca/wilsonvaniertraynor/june-7-2023-community-planting", + "https://www.engagewr.ca/wilsonvaniertraynor/now-available-information-session-recording", + "https://www.engagewr.ca/wilsonvaniertraynor/online-forum", + "https://www.engagewr.ca/wilsonvaniertraynor/park-opening-celebration-sept-14", + "https://www.engagewr.ca/wilsonvaniertraynor/previous-page-content-fall-2021", + "https://www.engagewr.ca/wilsonvaniertraynor/previous-page-content-summer-2021", + "https://www.engagewr.ca/wilsonvaniertraynor/update-on-the-wilson-vanier-and-traynor-park-network", + "https://www.engagewr.ca/wilsonvaniertraynor/update-on-traynor-park", + "https://www.engagewr.ca/wilsonvaniertraynor/update-on-vanier-park", + "https://www.engagewr.ca/wilsonvaniertraynor/vanier-construction-update", + "https://www.engagewr.ca/window-replacement", + "https://www.engagewr.ca/woolwich-community-projects", + "https://www.engagewr.ca/woolwich-ctmp", + "https://www.engagewr.ca/woolwich-ctmp/join-our-second-online-workshop-complete-survey", + "https://www.engagewr.ca/woolwich-ctmp/news-survey1", + "https://www.engagewr.ca/woolwich-ctmp/notice-of-commencement", + "https://www.engagewr.ca/woolwich-ctmp/notice-public-workshop-1", + "https://www.engagewr.ca/woolwich-ctmp/phase-1-report-completed-comprehensive-transportation-mobility-plan", + "https://www.engagewr.ca/woolwich-ctmp/public-workshop-1-video-recording", + "https://www.engagewr.ca/woolwich-haf", + "https://www.engagewr.ca/woolwich-haf/successful-completion-first-annual-reporting-period-housing-accelerator-fund", + "https://www.engagewr.ca/woolwich-muudg", + "https://www.engagewr.ca/woolwich-muudg/2412", + "https://www.engagewr.ca/woolwich-muudg/draft-mixed-use-urban-design-guidelines-feedback", + "https://www.engagewr.ca/woolwich-muudg/draft-mixed-use-urban-design-guidelines-now-available", + "https://www.engagewr.ca/woolwich-muudg/final-mixed-use-urban-design-guidelines-draft-available", + "https://www.engagewr.ca/woolwich-muudg/muudg-survey1", + "https://www.engagewr.ca/woolwich-muudg/open-house-1", + "https://www.engagewr.ca/woolwich-muudg/person-open-house-2", + "https://www.engagewr.ca/wreds", + "https://www.engagewr.ca/wreds/2025-strategy-to-councils-for-review", + "https://www.engagewr.ca/wreds/celebrating-our-economic-potential-2", + "https://www.engagewr.ca/wreds/engagement-results", + "https://www.engagewr.ca/wreds/first-round-of-public-engagement", + "https://www.engagewr.ca/wreds/newcomers-and-cultural-communities", + "https://www.engagewr.ca/wreds/next-round-of-engagement-sessions-now-available-for-registration", + "https://www.engagewr.ca/wreds/youth-workshop-what-do-you-want-your-community-to-look-like", + "https://www.engagewr.ca/wrh-courtland-shelley-redevelopment", + "https://www.engagewr.ca/wrh-courtland-shelley-redevelopment/project-update-spring-2024", + "https://www.engagewr.ca/wrh-mooregate-redevelopment", + "https://www.engagewr.ca/wrh-mooregate-redevelopment/project-update-spring-2024", + "https://www.engagewr.ca/www-engagewr-ca-446-albert-st", + "https://www.engagewr.ca/ywcacambridgeshelter", + "https://www.engagewr.ca/zca0423" + ], + "metadata": { + "startedAt": "2025-08-31T13:41:32Z", + "finishedAt": "2025-08-31T13:41:55Z", + "durationMs": 23190 + }, + "params": { + "maxDepth": 1, + "concurrency": 5, + "timeoutMs": 5000, + "userAgent": "urlcrawler/1.0", + "sameHostOnly": true + }, + "stats": { + "ok": 150, + "broken": 3, + "status2xx": 150, + "status3xx": 0, + "status4xx": 3, + "status5xx": 0, + "statusOther": 0 + } +} diff --git a/reports/lilsgym.ca.json b/reports/lilsgym.ca.json new file mode 100644 index 0000000..bafd5ef --- /dev/null +++ b/reports/lilsgym.ca.json @@ -0,0 +1,330 @@ +{ + "target": "https://lilsgym.ca", + "crawledUrls": [ + "https://lilsgym.ca", + "https://lilsgym.ca/contact.html", + "https://lilsgym.ca/contact.html?type=group-training", + "https://lilsgym.ca/contact.html?type=membership", + "https://lilsgym.ca/facility.html", + "https://lilsgym.ca/grouptraining.html", + "https://lilsgym.ca/personaltraining.html" + ], + "sitemapUrls": [ + "https://lilsgym.ca/", + "https://lilsgym.ca/contact.html", + "https://lilsgym.ca/facility.html", + "https://lilsgym.ca/grouptraining.html", + "https://lilsgym.ca/personaltraining.html", + "https://lilsgym.ca/policies.html", + "https://lilsgym.ca/privacy.html" + ], + "linkStatuses": [ + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_0313_00-1024x768.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/facility.html", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_0333_00-1024x768.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/facility-new/IMG_6741.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/personaltraining.html", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/contact.html", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_0335_00-1024x768.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_0314_00-1024x768.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/facility-new/IMG_6731.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_9115.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/contact.html?type=membership", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_0332_00-1024x768.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/facility-new/IMG_6739.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/grouptraining.html", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_0339_00-1-1024x768.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/contact.html?type=group-training", + "statusCode": 200, + "ok": true + }, + { + "url": "https://titan-training.ca/", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_0331_00-1024x768.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://maps.google.com/?q=32+Weber+St+W,+Kitchener,+ON+N2H+3Z2", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_0306_00-1024x768.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/facility-new/rotated/IMG_6738_rotated.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://lilsgym.ca/assets/img/webp/IMG_0323_00-1024x768.webp", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.blackswanstrength.com/", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.mutantfrogfitness.ca/", + "statusCode": 200, + "ok": true + }, + { + "url": "https://booking.setmore.com/scheduleappointment/0b712222-be8d-4521-afc7-afbed7d7a4b4?lang=", + "statusCode": 200, + "ok": true + } + ], + "pageOutlinks": { + "https://lilsgym.ca": [ + "https://lilsgym.ca/contact.html", + "https://lilsgym.ca/grouptraining.html", + "https://lilsgym.ca/personaltraining.html" + ], + "https://lilsgym.ca/contact.html": [ + "https://booking.setmore.com/scheduleappointment/0b712222-be8d-4521-afc7-afbed7d7a4b4?lang=", + "https://lilsgym.ca/contact.html", + "https://maps.google.com/?q=32+Weber+St+W,+Kitchener,+ON+N2H+3Z2" + ], + "https://lilsgym.ca/contact.html?type=group-training": [ + "https://booking.setmore.com/scheduleappointment/0b712222-be8d-4521-afc7-afbed7d7a4b4?lang=", + "https://lilsgym.ca/contact.html?type=group-training", + "https://maps.google.com/?q=32+Weber+St+W,+Kitchener,+ON+N2H+3Z2" + ], + "https://lilsgym.ca/contact.html?type=membership": [ + "https://booking.setmore.com/scheduleappointment/0b712222-be8d-4521-afc7-afbed7d7a4b4?lang=", + "https://lilsgym.ca/contact.html?type=membership", + "https://maps.google.com/?q=32+Weber+St+W,+Kitchener,+ON+N2H+3Z2" + ], + "https://lilsgym.ca/facility.html": [ + "https://lilsgym.ca/assets/img/facility-new/IMG_6731.webp", + "https://lilsgym.ca/assets/img/facility-new/IMG_6739.webp", + "https://lilsgym.ca/assets/img/facility-new/IMG_6741.webp", + "https://lilsgym.ca/assets/img/facility-new/rotated/IMG_6738_rotated.webp", + "https://lilsgym.ca/assets/img/webp/IMG_0306_00-1024x768.webp", + "https://lilsgym.ca/assets/img/webp/IMG_0313_00-1024x768.webp", + "https://lilsgym.ca/assets/img/webp/IMG_0314_00-1024x768.webp", + "https://lilsgym.ca/assets/img/webp/IMG_0323_00-1024x768.webp", + "https://lilsgym.ca/assets/img/webp/IMG_0331_00-1024x768.webp", + "https://lilsgym.ca/assets/img/webp/IMG_0332_00-1024x768.webp", + "https://lilsgym.ca/assets/img/webp/IMG_0333_00-1024x768.webp", + "https://lilsgym.ca/assets/img/webp/IMG_0335_00-1024x768.webp", + "https://lilsgym.ca/assets/img/webp/IMG_0339_00-1-1024x768.webp", + "https://lilsgym.ca/assets/img/webp/IMG_9115.webp", + "https://lilsgym.ca/contact.html", + "https://lilsgym.ca/facility.html", + "https://lilsgym.ca/grouptraining.html" + ], + "https://lilsgym.ca/grouptraining.html": [ + "https://lilsgym.ca/contact.html", + "https://lilsgym.ca/contact.html?type=group-training", + "https://lilsgym.ca/contact.html?type=membership", + "https://lilsgym.ca/grouptraining.html" + ], + "https://lilsgym.ca/personaltraining.html": [ + "https://lilsgym.ca/contact.html", + "https://lilsgym.ca/facility.html", + "https://lilsgym.ca/personaltraining.html", + "https://titan-training.ca/", + "https://www.blackswanstrength.com/", + "https://www.mutantfrogfitness.ca/" + ] + }, + "linkSources": { + "https://booking.setmore.com/scheduleappointment/0b712222-be8d-4521-afc7-afbed7d7a4b4?lang=": [ + "https://lilsgym.ca/contact.html", + "https://lilsgym.ca/contact.html?type=membership", + "https://lilsgym.ca/contact.html?type=group-training" + ], + "https://lilsgym.ca/assets/img/facility-new/IMG_6731.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/facility-new/IMG_6739.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/facility-new/IMG_6741.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/facility-new/rotated/IMG_6738_rotated.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_0306_00-1024x768.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_0313_00-1024x768.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_0314_00-1024x768.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_0323_00-1024x768.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_0331_00-1024x768.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_0332_00-1024x768.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_0333_00-1024x768.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_0335_00-1024x768.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_0339_00-1-1024x768.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/assets/img/webp/IMG_9115.webp": [ + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/contact.html": [ + "https://lilsgym.ca/grouptraining.html", + "https://lilsgym.ca/contact.html", + "https://lilsgym.ca/personaltraining.html", + "https://lilsgym.ca/facility.html", + "https://lilsgym.ca" + ], + "https://lilsgym.ca/contact.html?type=group-training": [ + "https://lilsgym.ca/grouptraining.html", + "https://lilsgym.ca/contact.html?type=group-training" + ], + "https://lilsgym.ca/contact.html?type=membership": [ + "https://lilsgym.ca/grouptraining.html", + "https://lilsgym.ca/contact.html?type=membership" + ], + "https://lilsgym.ca/facility.html": [ + "https://lilsgym.ca/personaltraining.html", + "https://lilsgym.ca/facility.html" + ], + "https://lilsgym.ca/grouptraining.html": [ + "https://lilsgym.ca/grouptraining.html", + "https://lilsgym.ca/facility.html", + "https://lilsgym.ca" + ], + "https://lilsgym.ca/personaltraining.html": [ + "https://lilsgym.ca/personaltraining.html", + "https://lilsgym.ca" + ], + "https://maps.google.com/?q=32+Weber+St+W,+Kitchener,+ON+N2H+3Z2": [ + "https://lilsgym.ca/contact.html", + "https://lilsgym.ca/contact.html?type=membership", + "https://lilsgym.ca/contact.html?type=group-training" + ], + "https://titan-training.ca/": [ + "https://lilsgym.ca/personaltraining.html" + ], + "https://www.blackswanstrength.com/": [ + "https://lilsgym.ca/personaltraining.html" + ], + "https://www.mutantfrogfitness.ca/": [ + "https://lilsgym.ca/personaltraining.html" + ] + }, + "missingInSitemap": [ + "https://lilsgym.ca", + "https://lilsgym.ca/contact.html?type=group-training", + "https://lilsgym.ca/contact.html?type=membership" + ], + "inSitemapNotCrawled": [ + "https://lilsgym.ca/", + "https://lilsgym.ca/policies.html", + "https://lilsgym.ca/privacy.html" + ], + "metadata": { + "startedAt": "2025-08-31T13:31:06Z", + "finishedAt": "2025-08-31T13:31:08Z", + "durationMs": 1610 + }, + "params": { + "maxDepth": 2, + "concurrency": 5, + "timeoutMs": 5000, + "userAgent": "urlcrawler/1.0", + "sameHostOnly": true + }, + "stats": { + "ok": 26, + "broken": 0, + "status2xx": 26, + "status3xx": 0, + "status4xx": 0, + "status5xx": 0, + "statusOther": 0 + } +} diff --git a/reports/titan-training.ca.json b/reports/titan-training.ca.json index b6d415e..11c68ff 100644 --- a/reports/titan-training.ca.json +++ b/reports/titan-training.ca.json @@ -3,7 +3,7 @@ "crawledUrls": [ "https://titan-training.ca", "https://titan-training.ca/", - "https://titan-training.ca/.", + "https://titan-training.ca/", "https://titan-training.ca/cdn-cgi/l/email-protection", "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/product-details/product/681331db52e2115c63435275", @@ -16,7 +16,27 @@ ], "linkStatuses": [ { - "url": "https://titan-training.ca/products-list", + "url": "https://titan-training.ca", + "statusCode": 200, + "ok": true + }, + { + "url": "https://titan-training.ca/titan-training.ca", + "statusCode": 200, + "ok": true + }, + { + "url": "https://www.google.com/maps/search?api=1\u0026query=Google\u0026query_place_id=ChIJwzSnW430K4gRU8zOBshqKAg", + "statusCode": 404, + "ok": false + }, + { + "url": "https://titan-training.ca/.", + "statusCode": 200, + "ok": true + }, + { + "url": "https://titan-training.ca/product-details/product/titan-training.ca", "statusCode": 200, "ok": true }, @@ -26,12 +46,7 @@ "ok": true }, { - "url": "https://www.cloudflare.com/5xx-error-landing", - "statusCode": 200, - "ok": true - }, - { - "url": "https://titan-training.ca", + "url": "https://www.youtube.com/channel/UCOtL1D3s3fBxHJLAyF5kNRA/featured?view_as=public", "statusCode": 200, "ok": true }, @@ -41,17 +56,7 @@ "ok": true }, { - "url": "https://www.youtube.com/channel/UCOtL1D3s3fBxHJLAyF5kNRA/featured?view_as=public", - "statusCode": 200, - "ok": true - }, - { - "url": "https://developers.cloudflare.com/waf/tools/scrape-shield/email-address-obfuscation", - "statusCode": 200, - "ok": true - }, - { - "url": "https://developers.cloudflare.com/fundamentals/setup/account/create-account", + "url": "https://titan-training.ca/products-list", "statusCode": 200, "ok": true }, @@ -60,6 +65,11 @@ "statusCode": 200, "ok": true }, + { + "url": "https://titan-training.ca/product-details/product/681331db52e2115c63435275", + "statusCode": 200, + "ok": true + }, { "url": "https://www.cloudflare.com/sign-up?utm_source=email_protection", "statusCode": 403, @@ -71,39 +81,29 @@ "ok": true }, { - "url": "https://titan-training.ca/titan-training.ca", + "url": "https://developers.cloudflare.com/waf/tools/scrape-shield/email-address-obfuscation", "statusCode": 200, "ok": true }, { - "url": "https://titan-training.ca/product-details/product/681331db52e2115c63435275", + "url": "https://www.cloudflare.com/5xx-error-landing", "statusCode": 200, "ok": true }, { - "url": "https://titan-training.ca/.", + "url": "https://developers.cloudflare.com/fundamentals/setup/account/create-account", "statusCode": 200, "ok": true }, - { - "url": "https://www.google.com/maps/search?api=1\u0026query=Google\u0026query_place_id=ChIJwzSnW430K4gRU8zOBshqKAg", - "statusCode": 404, - "ok": false - }, { "url": "https://www.instagram.com/titan__training", "statusCode": 200, "ok": true - }, - { - "url": "https://titan-training.ca/product-details/product/titan-training.ca", - "statusCode": 200, - "ok": true } ], "pageOutlinks": { "https://titan-training.ca": [ - "https://titan-training.ca/.", + "https://titan-training.ca/", "https://titan-training.ca/cdn-cgi/l/email-protection", "https://titan-training.ca/products-list", "https://titan-training.ca/titan-training.ca", @@ -188,19 +188,17 @@ ], "https://titan-training.ca/": [ "https://titan-training.ca/", - "https://titan-training.ca/.", "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", + "https://titan-training.ca/.", "https://titan-training.ca/product-details/product/681331db52e2115c63435275", + "https://titan-training.ca", "https://titan-training.ca/products-list" ], - "https://titan-training.ca/.": [ - "https://titan-training.ca" - ], "https://titan-training.ca/cdn-cgi/l/email-protection": [ "https://titan-training.ca/", + "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/.", "https://titan-training.ca/titan-training.ca", - "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/product-details/product/681331db52e2115c63435275", "https://titan-training.ca", "https://titan-training.ca/products-list" @@ -219,9 +217,9 @@ ], "https://titan-training.ca/products-list": [ "https://titan-training.ca/", + "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/.", "https://titan-training.ca/titan-training.ca", - "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/product-details/product/681331db52e2115c63435275", "https://titan-training.ca", "https://titan-training.ca/products-list" @@ -241,9 +239,9 @@ ], "https://www.facebook.com/titantrainingkw": [ "https://titan-training.ca/", + "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/.", "https://titan-training.ca/titan-training.ca", - "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/product-details/product/681331db52e2115c63435275", "https://titan-training.ca", "https://titan-training.ca/products-list" @@ -256,18 +254,18 @@ ], "https://www.instagram.com/titan__training": [ "https://titan-training.ca/", + "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/.", "https://titan-training.ca/titan-training.ca", - "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/product-details/product/681331db52e2115c63435275", "https://titan-training.ca", "https://titan-training.ca/products-list" ], "https://www.youtube.com/channel/UCOtL1D3s3fBxHJLAyF5kNRA/featured?view_as=public": [ "https://titan-training.ca/", + "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/.", "https://titan-training.ca/titan-training.ca", - "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/product-details/product/681331db52e2115c63435275", "https://titan-training.ca", "https://titan-training.ca/products-list" @@ -276,7 +274,7 @@ "missingInSitemap": [ "https://titan-training.ca", "https://titan-training.ca/", - "https://titan-training.ca/.", + "https://titan-training.ca/", "https://titan-training.ca/cdn-cgi/l/email-protection", "https://titan-training.ca/product-details/product/681330e25a7661691fe205c8", "https://titan-training.ca/product-details/product/681331db52e2115c63435275", @@ -286,5 +284,26 @@ "inSitemapNotCrawled": [ "https://titan-training.ca/home", "https://titan-training.ca/test_path?item=123" - ] + ], + "metadata": { + "startedAt": "2025-08-31T13:41:55Z", + "finishedAt": "2025-08-31T13:41:58Z", + "durationMs": 2547 + }, + "params": { + "maxDepth": 2, + "concurrency": 5, + "timeoutMs": 5000, + "userAgent": "urlcrawler/1.0", + "sameHostOnly": true + }, + "stats": { + "ok": 15, + "broken": 2, + "status2xx": 15, + "status3xx": 0, + "status4xx": 2, + "status5xx": 0, + "statusOther": 0 + } }