Updated 3. Enclosure assembly (markdown)
parent
e3a7df5e43
commit
d601889125
|
@ -36,31 +36,39 @@ If you don't have the hardware, be not afraid. **We sell hardware kits**, and we
|
||||||
|
|
||||||
## Step 4: Preparing the scroll wheel holder
|
## Step 4: Preparing the scroll wheel holder
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
|
Prepare the following components:
|
||||||
|
|
||||||
- Electronics assembly
|
- Electronics assembly
|
||||||
- Scroll wheel holder
|
- Scroll wheel holder
|
||||||
- Scroll wheel holder holder
|
- Scroll wheel holder holder
|
||||||
|
|
||||||
## Step 5: Insert scroll wheel holder holder into electronics assembly
|
## Step 5: Insert scroll wheel holder holder into electronics assembly
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
- **Ensure that the plastic part is oriented correctly**
|
- **Ensure that the plastic part is oriented correctly**
|
||||||
- The plastic part requires a bit of force to get into the PCB; be careful not to damage the electronics assembly
|
- The plastic part requires a bit of force to get into the PCB; be careful not to damage the electronics assembly
|
||||||
- Press the plastic part on its edges, NOT the middle, as you may break the part if you depress the middle too hard
|
- Press the plastic part on its edges, NOT the middle, as you may break the part if you depress the middle too hard
|
||||||
|
|
||||||
## Step 6: Insert scroll wheel holder into scroll wheel holder holder
|
## Step 6: Insert scroll wheel holder into scroll wheel holder holder
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
Stop laughing at the names already.
|
Stop laughing at the names already.
|
||||||
|
|
||||||
## Step 7: Preparing the base
|
## Step 7: Preparing the base
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
- Base
|
- Base
|
||||||
- 2x heat-set threaded inserts
|
- 2x heat-set threaded inserts
|
||||||
|
|
||||||
## Step 8: Put threaded inserts into base
|
## Step 8: Put threaded inserts into base
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
Take your time and go slowly. A soldering iron temperature of 350C or 620F is hot enough.
|
Take your time and go slowly. A soldering iron temperature of 350C or 620F is hot enough.
|
||||||
|
|
||||||
## Step 9: Assembling the base
|
## Step 9: Assembling the base
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
- Electronics assembly
|
- Electronics assembly
|
||||||
- Base
|
- Base
|
||||||
- Primary buttons
|
- Primary buttons
|
||||||
|
@ -69,18 +77,22 @@ Take your time and go slowly. A soldering iron temperature of 350C or 620F is ho
|
||||||
|
|
||||||
## Step 10: Place electronics assembly onto base
|
## Step 10: Place electronics assembly onto base
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
The electronics assembly is seated on the base, but it does not attach. It will eventually be pressed down by the Top, so don't worry about that here.
|
The electronics assembly is seated on the base, but it does not attach. It will eventually be pressed down by the Top, so don't worry about that here.
|
||||||
|
|
||||||
## Step 11: Screw secondary buttons into base
|
## Step 11: Screw secondary buttons into base
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
**TODO which screw here?**
|
**TODO which screw here?**
|
||||||
|
|
||||||
## Step 12: Screw primary buttons into base
|
## Step 12: Screw primary buttons into base
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
**TODO which screw here?**
|
**TODO which screw here?**
|
||||||
|
|
||||||
## Step 13: Preparing the top
|
## Step 13: Preparing the top
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
- Top
|
- Top
|
||||||
- 4x heat-set threaded inserts
|
- 4x heat-set threaded inserts
|
||||||
- 3x roller bearing dowels
|
- 3x roller bearing dowels
|
||||||
|
@ -88,6 +100,7 @@ The electronics assembly is seated on the base, but it does not attach. It will
|
||||||
|
|
||||||
## Step 14: Put threaded inserts into top
|
## Step 14: Put threaded inserts into top
|
||||||
**TODO PIX**
|
**TODO PIX**
|
||||||
|
|
||||||
Take your time and go slowly. A soldering iron temperature of 350C or 620F is hot enough.
|
Take your time and go slowly. A soldering iron temperature of 350C or 620F is hot enough.
|
||||||
|
|
||||||
## Step 15: Put roller bearings onto roller bearing dowels
|
## Step 15: Put roller bearings onto roller bearing dowels
|
||||||
|
@ -98,6 +111,7 @@ Take your time and go slowly. A soldering iron temperature of 350C or 620F is ho
|
||||||
|
|
||||||
## Step 17: All done!
|
## Step 17: All done!
|
||||||
**TODO PIX completed enclosure halves**
|
**TODO PIX completed enclosure halves**
|
||||||
|
|
||||||
Congrats, you finished assembling the enclosure! Pat yourself on the back.
|
Congrats, you finished assembling the enclosure! Pat yourself on the back.
|
||||||
|
|
||||||
When you're ready, proceed to [[4. Final assembly]] to continue.
|
When you're ready, proceed to [[4. Final assembly]] to continue.
|
Loading…
Reference in New Issue